M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.

Slides:



Advertisements
Similar presentations
B. List, ETH Zürich Page 1 Report from H1: PRC Open Session, H1: Status and Prospects Benno List Institute for Particle Physics, ETH Zürich.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
Winter Workshop on Nuclear Dynamics, Heavy Ion Physics with CMS: Day-One Measurements Olga Barannikova for the CMS Collaboration.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
High-density QCD with CMS at the LHC Haidong Liu for the CMS Collaboration OutLine Detectors Overview Bulk Observables Hard Probes Summary.
Elastic Scattering at s=1.96 TeV Using the DØ Forward Proton Detector
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Nov2,2001High P T Workshop, BNL Julia Velkovska High pt Hadrons from  sNN = 130 GeV Au-Au collisions measured in PHENIX Julia Velkovska (BNL) for PHENIX.
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Jorge Barreto Low_x Prague1 Status of Diffractive Physics at DØ Run II Jorge Barreto Instituto de Física - UFRJ Rio de Janeiro – RJ - Brazil Outline.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Muon-raying the ATLAS Detector
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
AFP Introduction September 10th 2014 M. Bruschi, INFN Bologna (Italy) 1.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Diffractive Physics at D0 Kyle Stevenson DIS 2003.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Fermilab Users Meeting June R.J. Tesarek Fermilab CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Open and Hidden Charm production in 920 GeV Proton-Nucleus Collisions Presented by Marko Starič for the Hera-B collaboration The.
Using Track based missing Et tools to reject fake MET background Muhammad Firdaus Mohd Soberi UMichigan-CERN Semester Program Thursday, 12 th February.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The Compact Muon Solenoid Detector
Kevin Burkett Harvard University June 12, 2001
The Silicon Track Trigger (STT) at DØ
A Fast Hardware Tracker for the ATLAS Trigger System
Identified Charged Hadron
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
Identified Charged Hadron Production at High pT
Run and Luminosity dependence of p17 NN b-tag
Presentation transcript:

M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events

M. Weber, AEM 4/5/042 Issues Downtime due to unstable silicon readout channels and a Muon readout crate. Air flow trip of the Central Track Trigger rack in the Collision Hall No CTT during a significant part of store Access on 4/1: CTT Muon alignment Survey on 3/26 showed a shift of 4mm in the central East Muon chambers. Confirmed by a survey on 4/1. Adapting the offline reconstruction. Blown fuse in a Forward Proton Detector power supply Repaired during a TeV access on 4/1

M. Weber, AEM 4/5/043 Luminosity We think the D0 Luminosity measurement is fine: Jet and Muon trigger cross-sections are constant within 1% hardware problem ?

M. Weber, AEM 4/5/044 Losses during the quench on Fri 140 Rad/sec Inst. dose rate was a factor of 3-4 higher than ever seen before Integrated dose was ~200Rad (not too bad) Lots of channels tripped in the Silicon, Lumi and Muon HV

M. Weber, AEM 4/5/045 Summary Offline reconstruction data quality plots look similar to ones from good runs taken before the mini-shutdown Access on Thursday 4/1/04 (CTT, Survey, FPD). Hit hard (dose rate) by the quench on Friday Change in the Luminosity ratio CDF/D0 is not due to a problem in the D0 measurement