M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.

Slides:



Advertisements
Similar presentations
J.P. Langston Brake Retrofit
Advertisements

Copyright DASSAULT SYSTEMES CATIA Training Exercises Part Design Fundamentals Version 5 Release 10 December 2002 EDU-CAT-E-PDG-FX-V5R10.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
1] C2 VDI Chain Platform Qty: 1 Mat’l: 6061-T6 Part Size: 4.19”L x 1.0” stk X 0.355” +/-.002 thk 4-40 Helicoil Tapped Thru, 4 Holes #6 100° C-Sink Thru,
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
McMaster rail #6709K601 McMaster linear bearing #6709K180 with guide rail suppressed.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
1-Meter Cross-Coil Prototype The mechanical design was driven by two primary requirements; to Improve the mechanical precision in the placement and alignment.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Design Progress Allen Ellis 18-September
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
New design With fewer parts and easier manufacture degrees 20mm 245.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
S-17 Reference Model Status Robin Lafever 21 October 2004.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
For Official Use Only; Information herein NOT Approved for Export; Contains Proprietary Protected Information; NOT for Public Release 1 WIPER PDR Stanford,
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
This is the finished body RADIUS LOFT EXTRUDE. Creating the body taper Open the wing Click on new part in context.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
A 128 fiber Slit-Plate assembly, Kinematic mount
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
UXO Goniometer-6 Parts Layout The UXO Goniometer is a device to hold specimen UXO objects at specified positions. It rotates the target in 10 degree increments.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
Three Pin Coupling Assembly Grey – Upper Arm Red – Arm Interface Plate with Pins for Coupling Blue – Wrist Interface Plate with Receptacles Wrist – Not.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
The reading is 7.38 mm. The reading is 7.72 mm.
Spacecraft Mockups Applied to SNAP M-21 Baseline Mockup.
Macromizer Wheelbase Design EJL
Enrique Calvo Alamillo DAEGU
From: Individually Controllable Magnetic Cilia: Mixing Application
Design of the He and HB ODU
the MDP High Field Dipole Demonstrator
Hawkeye Mechanical Design Snapshot
Additional Upstream Coil Shielding
Custom Adapter: ThorLabs RP01 Rotation Stage to Cambridge Technology D03806 REV B1 Galvo Mount Adapter to connect ThorLabs RP01 rotation stage to Cambridge.
McMaster linear bearing #6709K180 with guide rail suppressed
Type 2 Supercrystal Type 1 Supercrystal
Additional Upstream Coil Shielding
Sherline Model 5400 Milling Machine
. y y’ A B a a’ = C D OPTICAL SYSTEM GEOMETRICAL OPTICS
Another Modular Focal Plane: Part 2 – FP assembly
Standardized CCD and MCT detector mounting configurations
Plan for completion of Task 2
Presentation transcript:

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 2 The Model package file contents

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 3 Assembled Fold-Flat Mirror package

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 4 Mirror Face Material: 1/8” Mirror Glass WaterJet Profile: FoldFlatAssy_M21-B/WJ_Profile_Face.dxfFoldFlatAssy_M21-B/WJ_Profile_Face.dxf

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 5 Bipod Material: Aluminum plate 4-hole version, Min. 35mm thick 2-hole version, Min mm thick Waterjet profile: FoldFlatAssy_M21-B/WJ_Profile_Bipod.dxfFoldFlatAssy_M21-B/WJ_Profile_Bipod.dxf 4-hole version 2-hole version WaterJet Blank, before mill operations

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 6 Bipod reference dimensions Ream 10 mm Clearance 5mm Tap M5 Ream 10 mm Clearance 5mm

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 7 Bipod Assembly

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 8 Hardpoints Material: Aluminum Min 1” thick WaterJet Profile:..\WaterJetProfiles\WJ_Profile_HardPoints.dxf..\WaterJetProfiles\WJ_Profile_HardPoints.dxf

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 9 Spacers Material: Aluminum and Melamine (1 set each) WaterJet Profile:..\WJ_Profile_Spacer-Foot.dxf..\WJ_Profile_Spacer-Foot.dxf

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 10 Mirror Mounts WaterJet Profile:..\WJ_Profile_Spacer-Mirror.dxf..\WJ_Profile_Spacer-Mirror.dxf Material: Aluminum

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 11 Interface Plate Material: Melamine as supplied (1/2” or ¼”) Waterjet Profile:..\WJ_Profile_InterfacePlane.dxf..\WJ_Profile_InterfacePlane.dxf

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 12 Mirror Body Material: 4” laminated Ultralite WaterJet profile: WJ-Profile_Web.dxfWJ-Profile_Web.dxf Clearance cutouts will be performed by hand

M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 13 Final assembly in the Optics Bay Shield and ‘Ring-of-Fire’ assy Support structure Optics Bay housing