Biogas for households Mariska Ronteltap, PhD Lecturer Sanitary Engineering and Resource Oriented Sanitation Department of Urban Water Supply and Sanitation,

Slides:



Advertisements
Similar presentations
Gobar Gas Plant construction
Advertisements

Sources of water (RAIN)
Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.
Architecture CAD living sleeping service SPACE PLANNING
ACTIVE LEARNING PROCESS
INTRODUCTION. Seminar on IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST.
WASH Cluster – Groundwater Pumping GWP GWP4 1 Groundwater Pumping Session 4 Water Distribution.
Plant sizing PPRE Oldenburg University biogas compact course April 26 – 28, 2011.
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
Walls Ron Gatepain constructionsite.
Design of W.W. Collection System
 Materials & Fittings  What to buy  Quantity  Cost  Where to get them  When to buy i.e. before work starts  Blue print; this tells us the number.
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
| Vigyan Ashram | INDUSA PTI |1 Vigyan Ashram (A center of Indian Institute Of Education) At. Post Pabal Dist. Pune
Foundation Systems.
Lesson 3 How does radon enter a home?. Slide 4-1 Predicted average indoor radon levels (U.S.) This map cannot be used to determine the radon level of.
Chapter 18 Foundations.
Direct Shear Test CEP 701 PG Lab.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Sanitary Engineering Lecture 16
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Prefabricated Timber Frame Construction
Chapter 2b Foundations Shallow & Deep Foundations.
Radon Overview How Radon Enters the Home. Learning Outcomes Upon completion of this module you will be able to:  Recall the predominant source of radon.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Sources of water (RAIN)
FILTRATION Presentation on FILTRATION. Introduction What is filtration? Why is filtration important? What are filter media? Can you name different types.
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Vacuum system.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Presentation Dungrani rakesh v. Div : a Branch : mechenical Sem : 1 st.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
All plants start with a seed. Here is a picture of acorns They will eventually turn out to be great big trees.
Hydro Reservoir measures 18” x 18” x 6” Two Piece Hydro Reservoir Lid and Base Holds up to 6 Gallons of Water 3 Easy Access Openings for Watering and Feeding.
Introduction to Spring Development
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Radon in the home For most Americans, greatest exposure to radon is in home, especially in rooms that are Below grade (such as basements) In contact with.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Summer School Individual Project Bio-Energy Summer School 2009 Taylor Norrell.
Foundation Loads Dead Load Live Load Wind Load
Solar C³ITIES 3 IBC Biogas System: Simple and Effective Solution for Organic Waste Solar C³ITIES 3 IBC Biogas System: Simple and Effective Solution for.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Where do we find oil? In sedimentary rocks originally located between 7500 and 15,000 feet underground, for a long period of time.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Soil Foundation Topic : Bearing.
Mahatma Gandhi Institute of Technical Education & Research Centre
CAISSON FOUNDATION.
Sanitary Engineering Lecture 13
Direct Shear Test.
Hydraulic axial forces acting on a Francis runner.
CONTENTS 1. Intakes for Collecting Surface Water Page no. (1) (3) (5)
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Prefabricated Timber Frame Construction
Do Now #7 What are the dimensions of the footing?
POWER GENERATION USING SPEED BRAKERS BY AIR COMPRESSION METHOD
What is an on-lot sewage system?
Electrical Gas Plumbing Heating & Cooling
Building Construction
FBE05 – Mathematics and Statistics
Concrete A structural material made by combining cement, sand, aggregate, and water.
FBE03: Building Construction & Science
Processing fuels The Meal Deal.
BIOGAS PLANT.
Presentation transcript:

Biogas for households Mariska Ronteltap, PhD Lecturer Sanitary Engineering and Resource Oriented Sanitation Department of Urban Water Supply and Sanitation, UNESCO-IHE

Biogas systems Not so suitable for sole households without animals Very suitable for block of households / in combination with other wastes Relatively cheap; requires experience but no high tech skills / equipment

Size of the system The size of the plant depends on the substrate available Volume chosen for number of cattle/ pigs Larger plants = longer HRT = more gas But: amount of daily fed substrate more important for gas production than digester volume

Standard sizes In some countries where biogas systems are important, standard sizes are chosen This simplifies construction, operation and maintenance; makes material cheaper Example: 16 m³ for gas for cooking and lighting for a normal family 12 m³-plant for places of little gas demand 30 and 50 m³-plants: fuel for big institutional kitchens and special appliances (refrigerators, power engines)

Construction The plant consists of non-load bearing bottom (A), lower slurry-tight digester (B), the upper gas-tight gas storage part (C), neck (D) and gas-tight lid (E). Gas storage part and digester are separated by the weak ring (10) in order to allow free reaction of the strong-ring (3) and to prevent cracks which have developed in the lower part of the digester to "grow" into the gas storage space.

Construction Plant rests on foundation ring (1), bearing mainly the vertical loads of' the construction and the soil cover (7). The surrounding soil supports the construction to resist gas pressure (5) and slurry pressure (6). Concrete at the outside of the lower layer of bricks (2) helps to reduce tangential forces at the foot point (9). The ring forces of the upper part are absorbed by the strong-ring (3).

Inlet and outlet Inlet and outlet pipe must be placed in connection with brick- laying (Breaking holes spoils the whole structure) The pipe rests below on a brick projecting 2 cm to the inside. Above, it is kept in position at the rim of the excavation. Inlet: 10 cm diameter; in line with top of weak ring Outlet: 15 cm; starts at 4 th brick layer