1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception 03 06 2015 EuroCirCol-1505271400 WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.

Slides:



Advertisements
Similar presentations
Programme: 145 sessions & social events
Advertisements

ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
Welcome to CERN Research Technology Training Collaborating.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
Study Overview & Status
R. Aleksan Saclay Avril 14, 2015 Informations générales CECP Prochain RV.
TIARA MID-TERM MEETINGMadrid, Local Information and guidelines TIARA MID-TERM MEETING.
PACMAN recruitment Seamus Hegarty Human Resources Department – CERN PACMAN Kickoff Meeting CERN 20 November 2013.
Poverty & Human Capability 101 Introductory Class.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department Dr. Olivier BRUNNER (Deputy Coordinator) CERN, Beams Department 1 FCC Week
1 Training Provision and Market Needs for Trained Personnel in Accelerator Science in Europe Philip Burrows John Adams Institute for Accelerator Science.
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
9 th March 2010 Institute of Energy Research – Systems Analysis and Technology Evaluation Slide 1 Mitglied der Helmholtz-Gemeinschaft Important Details.
From Open Science to (Open) Innovation Markus Nordberg, Marzio Nessi (CERN) About CERN, Open Physics, Innovation and IdeaSquare.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
International Workshop Magnetic Phenomena in Micro- and Nano-Structures 27–29 May Donetsk, Ukraine.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
Astroparticle Physics for Europe ASPERA -2 WP3: Knowledge and technology transfer 1. Kick-off meeting 7 July 2009, Rob van der Meer (FOM) WP 3 Knowledge.
EuroCirCol Plan Overview Daniel Schulte for the EuroCirCol team CERN, June 2015.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
FCC Study Status & Summary of FCC Week 2015
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
September 17, 2003CEMS©VSE, CEMS Annual Events 2003 Prague December 4-6, 2003 Programme University of Economics, Prague Community of European Management.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department 1 FCC Week March, Washington (US)
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
1 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay Future Circular Colliders M. Benedikt gratefully acknowledging input from FCC global.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
8 th General Assembly Meeting Joint Programming Initiative „More Years, Better Lives ” Oslo 13/14 June 2013.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
9 th USA/EUROPE Air Traffic Management R&D Seminar June 14 th – 17 th 2011 Berlin, Germany Jointly sponsored by EUROCONTROL and Federal Aviation Administration.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
Task 4.3: Mitigate beam-induced vacuum effects (STFC, CERN) O.B. Malyshev and R. Valizadeh, ASTeC Vacuum Science Group, STFC Daresbury Laboratory, UK EuroCirCol.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
WP4 Cryogenic Beam Vacuum System Conception: Activity LNF (task 4.4, 4.6) R. Cimino LNF-INFN, Frascati (Italy) 1.

SLHC –PP WP6 LHC IR Upgrade - Phase I.
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
FCC summary report March 2015 Washington.
WP3 status Interaction Region design
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
WP 4 CERN Nov 2, 2009.
The Most Visited Countries
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
ARIES WP2 Task 2.3 Coordination, support and enhancement of training activities for accelerators in Europe Meeting:2 Rutambhara Yogi (ESS)
Forming a Gender Equality Group
ARIES A new Integrating Activity for Particle Accelerators
EuroCirCol Daniel Schulte for the FCC-hh teams CERN, October 2016.
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
STFC Contributions to the FCC Study
HEHIHB - WP1 Accelerator Magnet Technology
Uruguay West Germany Brazil Argentina Brazil July 30, 1930
Update on beam screen issues
H2020 – SCREEN 1st International Workshop
Task 2.3 Particle simulations studies
2006 Rank Adjusted for Purchasing Power
CERN: from fundamental sciences to daily applications
Presentation transcript:

1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work Distribution

Team EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF CERNIEIO KITGermany INFNItaly ALBASpain CIEMATSpain STFCUnited Kingdom

Tasks EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Task 4.1: Work Package Coordination Task 4.2: Study beam induced vacuum effects Task 4.3: Mitigate beam induced vacuum effects Task 4.4: Study vacuum stability at cryogenic temperature Task 4.5: Develop conceptual design for cryogenic beam vacuum system Task 4.6: Measurements on cryogenic beam vacuum system prototype

Manpower

Manpower – WP4 Francis Perez CERN Carles Collderam Raquel Monge 1x PhD Student CERN JM Perez 2 x Mech Eng CERN Oleg Reza 2x PhD Student CERN Roberto Cimino 1x PhD Student CERN Erhard Huttel Roberto Cimino 1x Post Doc CERN

WP4 - Kickoff meeting Wednesday, June 3rd, 2015 Report by Task Leaders Each task leader should expose: - The objective of his task - How it relates to the other tasks - The execution plan - The man power structure of his team & status new recruitment 14:0014:15 Welcome 14:1514:30Task 4.1CoordinationFrancis PerezALBA 14:3015:00Task 4.2Study Beam Induced Vacuum EffectsCarles CollderamALBA 15:0015:30Task 4.3Mitigate beam induced vacuum effectsOleg MalyshevSTFC 15:3016:00 Coffee break 16:0016:30Task 4.6Measurements of prototypeErhard HuttelKIT 16:3017:00Task 4.4Study vacuum stability at cryogenic temperatureRoberto CiminoINFN 17:0017:15Task 4.5Develop design cryogenic beam vacuum system 17:1517:45Mechanical stability of the beam screen during magnet quenchCedric GarionCERN 17:4518:00DiscussionAll 19:00 Dinner WP4 Thursday, June 4th, :0010h30Joint session with WP2 - Arc Design 10:3011:00 Coffee break 11:0012:30Joint session with WP5 - Magnets 12:3014:00 Lunch 14:0015:30Summary and wrapup 15:3016:00 Coffee break 16:0017:00Plenary discussion all WP WP4 – Kickoff Meeting