Optimal Repair Strategy for Rotables during Phase-out of an Aircraft Fleet NAME: DATE: Jan Block, Support & Services, Luleå University of Technology 2010-10-19.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

Logistics Network Configuration
Inventory Control, Cost & Deterministic models Unit-III Revised version.
CLEANROOM SOFTWARE ENGINEERING
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
1 S ystems Analysis Laboratory Helsinki University of Technology A Simulation Model for Aircraft Maintenance in an Uncertain Operational Environment Ville.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
D Nagesh Kumar, IIScOptimization Methods: M1L1 1 Introduction and Basic Concepts (i) Historical Development and Model Building.
BRIDGING THE GAP BETWEEN THEORY AND PRACTICE IN MAINTENANCE D.N.P. (Pra) MURTHY RESEARCH PROFESSOR THE UNIVERSITY OF QUEENSLAND.
12 C H A P T E R Systems Investigation and Analysis and Analysis.
Fundamentals of Information Systems, Second Edition
Structural Analysis Approach to Fault Diagnosis with Application to Fixed-wing Aircraft Motion by Roozbeh Izadi-Zamanabadi Department of Control Engineering.
University of Jyväskylä – Department of Mathematical Information Technology Computer Science Teacher Education ICNEE 2004 Topic Case Driven Approach for.
Database System Development Lifecycle Transparencies
Optimization I Operations -- Prof. Juran. Outline Basic Optimization: Linear programming –Graphical method –Spreadsheet Method Extension: Nonlinear programming.
SYSTEMS ANALYSIS LABORATORY HELSINKI UNIVERSITY OF TECHNOLOGY A Simulation Model for Military Aircraft Maintenance and Availability Tuomas Raivio, Eemeli.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR ESM'2009, October 26-28, 2009, Holiday Inn Leicester, Leicester, United Kingdom.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
Article Title: Optimization model for resource assignment problems of linear construction projects ShuShun Liu & ChangJung Wang, National Yunlin University.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
By Saparila Worokinasih
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Performance modeling of a hybrid Diesel generator-Battery hybrid system Central University of Technology Energy Postgraduate Conference 2013.
Introduction to Software Quality Assurance (SQA)
CLEANROOM SOFTWARE ENGINEERING.
AIRCRAFT HANDLING Part 1 Maintenance.
Classifying optimization problems By the independent variables: –Integer optimization --- integer variables –Continuous optimization – real variables By.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
GOLD Guaranteed Operation and Low DMC SEAMLESS AIRCRAFT HEALTH MANAGEMENT FOR A PERMANENT SERVICEABLE FLEET Birmingham (UK) December 05, 2007.
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
A Complexity Metric for Practical Ship Design 1 Jean-David Caprace ANAST – University of Liège – Belgium PRADS – September 2010.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
1 Introduction to Software Engineering Lecture 1.
1 S ystems Analysis Laboratory Helsinki University of Technology Flight Time Allocation Using Reinforcement Learning Ville Mattila and Kai Virtanen Systems.
8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish.
Optimization I. © The McGraw-Hill Companies, Inc., 2004 Operations Management -- Prof. Juran2 Outline Basic Optimization: Linear programming –Graphical.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Arben Asllani University of Tennessee at Chattanooga Chapter 5 Business Analytics with Goal Programming Business Analytics with Management Science Models.
12/26/2015 IPK, NTNU 1 RFID case 1: RFID and VCV (Value Chain Visibility) in Airbus Business Prof. Kesheng Wang Knowledge Discovery Laboratory (KDL) Department.
1 An Analytical Model for the Dimensioning of a GPRS/EDGE Network with a Capacity Constraint on a Group of Cells r , r , r Nogueira,
MRO Europe: Engineering & Maintenance Succeeding with Entry into Service.
AIRCRAFT RELIABILITY Y.K.Sinha Rajalakshmi Engineering College AIR TRANSPORTAION AND AIRCRAFT MAINTENANCE (AE1012)
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
METRIC Multi-Echelon Technique for Recoverable Item Control Craig C.Sherbrooke Presented by: Nuriye KAPTANLAR Y.Emre KARAMANOGLU
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
44222: Information Systems Development
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
R EHABILITATION OF R AILWAY T RANSPORT IN C ENTRAL AND E ASTERN E UROPE I NTRODUCTION
Week#3 Software Quality Engineering.
A Predictive Maintenance Strategy based on Real-Time Systems
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Information Systems Development
Eric Peirano, Ph.D., TECHNOFI, COO
Business process management (BPM)
REFURBISHMENT DYNAMICS FOR SUBSIDY PROGRAMME FINANCING
Saint- Petersburg State University of Aerospace Instrumentation
Analysis Using Spreadsheets
Object-Oriented Software Engineering Using UML, Patterns, and Java,
SOUTHERN TAIWAN UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT
Business process management (BPM)
Imprecise Probabilistic and Interval Approaches Applied to
PMI ® Project Management Professional (PMP) ® Workshop PMI, PMP, PMBOK & PMI Talent Triangle are registered marks of Project Management Institute, Inc.
ATLAST Deployment &Push Pack Spares Optimizer
Optimization I.
Chapter 1. Formulations.
Presentation transcript:

Optimal Repair Strategy for Rotables during Phase-out of an Aircraft Fleet NAME: DATE: Jan Block, Support & Services, Luleå University of Technology

Presentation Outline Introduction. Research project – Swedish National Aeronautics Research Programme No.4-5. Background and problem description. Methodology. Main principal - Minimal margin. Short about the mathematical model. Numerical example. Conclusions. Further research. Questions.

Enhanced Life Cycle Assessment for Performance-Based Logistics The goal of the project is to develop methodologies and software tools for data mining of operational data and to improve and streamline existing methodologies for follow-up and analysis of the aircraft system and support systems throughout their respective life cycles. This will enable better decision-support when predicting and reviewing a variety of business solutions in both the military and civil aerospace sector Highly capital-intensive systems. Very long operational lifecycles. Necessary operational and performance characteristics during whole lifecycle.

Research project – Empirical data Aims to develop methodologies for analysis and information extraction from data collected during design, operation, maintenance and monitoring of aircraft. Empirical data: A/C 37 VIGGEN 330 Aircraft. 615,000 Flight Hours Main versions. Strike (AJ) Dual conversion/EW (SK) Sea control (SH) Reconnaissance (SF) Fighter (JA)

”The principle is that the A/C (SK 60) shall be ready for flying at a certain time with 95 % probability.” (Eva Wenström ) Example of Performance-Based Logistics (PBL). SK60 – A PBL Project… Right functionality. Right technical availability. On right place. On right time.

SK60 – A Phasingout Project… Degree Project: Maintenance optimization RM A/C, 2 engines per A/C. Minimize of ”Check 3” and change of engines (minimize cost). Find optimal time to send engines for “Check 3”. Options to consider: Decisions gates. Stop flying 2014 alt Extend flying time.

Items Number of Aircraft Maintenance occasions Start of discarding Aircraft Maintenance stop Stop collecting units Collected items from Aircraft Problem Description Optimizing of maintenance resources during parallel phase-out and phase-in of different versions of aircraft, rotables and support equipment, while simultaneously ensuring the contracted availability at a reasonable Life Cycle Cost (LCC) and Life Support Cost (LSC). This is a critical capability when offering, contracting and implementing performance-based business solutions, such as Performance-Based Logistics (PBL).

Different stages for a repairable unit

How to find a maintenance stop point? In order to determine the optimal time to stop repair the concept of Minimal Margin is introduced. The Minimal Margin is defined as the minimum difference between Units Available (UA) and Units Required (UR) which is not less than zero, i.e. no shortage should occur. Eq.1 Minimal Margin = Min (UA − UR).

RepairNo-Repair Discarded units during repair from functional systemsDiscarded units without repair from functional systems Discarded units from phased-out systems during repair Discarded units from phased-out systems without repair More information: Paper, Optimal Repair for Repairable Components during Phase out an Aircraft Fleet.

Minimal Margin From this nonlinear programming formulation the optimal time to stop repair ts can be obtained. Where and t are the decision variables.

Numerical Example Assume that the phase-out rate of systems is linear with the constant rate This gives that the instantaneous number of remaining systems is: In-data:

Numerical Example

How the repair stop time varies with repair rate and shape parameter.

Stock Total demand Shortage Stop reuse Stock exceed demand Example from end life management of A/C 37 Viggen EXAMPLE

Conclusions The model only handles with operational time measured as calendar time, which implies that all systems and units age are at a similar rate. Need to consider more parameters: Calendar/Operational and cycle maintenance intervals. Storage maintenance. Modification programs. PM history on the A/C. Etc. Costly process to ignore.

Further Work Building a simulation model to be able to deal with all parameters that influences the different maintenance flow on a complex system. The model should be able to deal with parallel phase-out and phase-in scenarios.

Thanks for your attention! Questions?