STA-800-7.05 Safety Project PID #76439 December 12, 2006.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
U.S. 20 Pavement Replacement Project Michigan City High School Wednesday, September 17, 2014.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
State Road 46 Pavement Replacement Owen Valley High School Wednesday, September 3, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Thursday, August 9, p.m. Jennings County High School.
U.S. 33 Northern Connector Alternative
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 I-75 Reconstruction Welcome! Those wishing to make an official comment concerning any of the projects presented this evening.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
2016 Mill and Overlay Project
Secor Road Reconstruction Project Public Meeting #2
S.R. 30A / U.S. 98 / Panama City Beach Parkway
DICKINSON AVENUE RECONSTRUCTION
Public Information Meeting NW 100th Street Reconstruction Project
IA 122 RECONSTRUCTION PRE-BID MEETING
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
SE 12th Street Roadway Improvements February 8, 2005.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Presentation transcript:

STA Safety Project PID #76439 December 12, 2006

Agenda Presentation –Project History –Safety Concerns –Project Scope –Maintenance of Traffic –Schedule Open House

Project History Highway Safety Study (2002) Alternative Analysis (2004 – 2005) –Impact Analysis –Curbed vs. Uncurbed –Widening Alignment –Reconstruction vs. Widening –Drainage Preliminary Layout (2006)

Safety Concerns Highway Safety Study (2002) 1999 – 2001 Non- Intersection Crash Data –Crash Rate 2.98 acc/mvm* (actual) 0.88 acc/mvm* (state mean) –94 Total Accidents Collision Types * Acc/mvm – Accidents per million vehicle miles

Safety Concerns 2002 – 2004 Non- Intersection Crash Data –Crash Rate 3.08 acc/mvm* (actual) 1.11 acc/mvm* (state mean) –Approximately 30 crashes/year Collision Types * Acc/mvm – Accidents per million vehicle miles

Project Scope 43 rd Street to Mill Street (1.6 miles) 3-Lane Section –Two Way Left Turn Lane –Left Turn Lanes (Faircrest/Southgate/Mill) Southbound Right Turn Lane at Southgate Curb & Gutter with Storm Sewers Sidewalks

Maintenance of Traffic Minimize Disruption due to Construction –Traffic Disruption Two-Way Two-Lane Temporary Pavement –Property Owners Disruption Construction in Sections Maintain Access to all Drives Side Roads –Mill/Southgate/Carnwise/Faircrest/43rd

Project Schedule Open Comment Period (January 12, 2007) Evaluate Comments/Adjust Plan Complete Environmental Document (Spring 2007) Complete Design (Winter 2008) Begin R/W Acquisition (Spring 2008) Begin Construction (Spring 2012)

Open House Stations –Preliminary Study Documents –Preliminary Plan Layout –Maintenance of Traffic –Right of Way Acquisition –Comments