PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools for Analog and Digital parts  Typical acquisition sequence.
Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Rémi CORNAT (IN2P3/LPC) - Review feb’05 Preshower FE Board design R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq M-L. Mercier,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Preshower Front-End Boards News LHCb group / LPC Clermont  News  TRIG-PGA Bit Flip Behaviour  Bit Flip Simulations  Conclusion.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Rémi CORNAT (IN2P3/LPC) - PRR june’06 Preshower FE Board design R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq M-L. Mercier,
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
LHCb – Calo Upgrade Meeting – 20th October 2013 – CERN Upgrade Calo FE Review Comments: Analog D. Gascon for the LHCb calo group Universitat de Barcelona.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
GPL Board Pattern Generator for the Level-0 Decision Unit Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Jacques Lecoq,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting London 2008.
SKIROC status Calice meeting – Kobe – 10/05/2007.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
D. Breton, S. Simion February 2012
CMS EMU TRIGGER ELECTRONICS
Front-end digital Status
Calorimeter Upgrade Meeting - News
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Tests Front-end card Status
Overview of the LHCb Calorimeter Electronics … focus in the ECAL/HCAL
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Presentation transcript:

PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic Calorimeter Final Design Review CERN,

17/02/20052 First tests -- July-September 2004 Testbeam campaign October 2004 « upgraded» prototype -- January 2005 PSFEB Test Bench Conclusion

17/02/20053 Front End Board Synopsis

17/02/20054 Front End Board Synopsis ACQ RAM

17/02/20055 Front End Board first tests Generate & capture all FEB IO’s Fully synchronous ( 1 clock generator) Specially designed: BackPlane (see later) AX1000 with an acquisition RAM LVDS-I2C/LVCMOS-I2C converter Mixed control : LabView (GPIB, VME) C++ (SPECS, USB) I2C/I2C converter

17/02/20056 Wave form generator Clock generator & fan-out Analogue fan-out Digital patterns RAMS Front End Board first tests

17/02/20057 Wave form generator Clock generator & fan-out Analogue fan-out Digital patterns RAMS Front End Board first tests

17/02/20058 Front End Board -- first tests Important software effort in August/September for FEB control/testing and CROC independent data acquisition: Using both SPECS and USB for PGA’s/ASIC’s control Direct reading of the AX1000 Acquisition RAM through I2C/SPECS -> high SPECS error rate! C++ code developped in the VisualC++ environment and running on Windows Specially designed USB/I2C Interface Overcomes SPECS data length limitation (26 bytes/I2C frame, 34 necessary for AX’s & ASICs programation)

17/02/20059 Front End Board --- first tests Important software effort in August/September for FEB control/testing and CROC independent data acquisition: Using both SPECS and USB for PGA’s/ASIC’s control Direct reading of the AX1000 Acquisition RAM through I2C/SPECS -> high SPECS error rate! C++ code developped in the VisualC++ environment and running on Windows Specially designed USB/I2C Interface Overcomes SPECS data length limitation (26 bytes/I2C frame, 34 necessary for AX’s & ASICs programation)

17/02/ Testbeam Campaign 40 MHz pion beam only one channel read out no FE / VFE synchronisation ACQ RAM (trigger controlled, 512 words deep) pedestals OK 10bit/8bit transcoding OK pedestal subtraction OK

17/02/ Test Beam Campaign -- Pedestals 1.2 ADC counts

17/02/ Testbeam Campaign -- Some results ~17 pe, perfectly compatible with previous testbeam results (2002)

17/02/ Single Card PSFEB Testbench Looks pretty much as the automn version except that: now in the LAL backplane DAQ through SEQ_PGA / CROC new SPECS PROM I2C/I2C Converter

17/02/ Control software developped in the CAT (© F Machefert ) framework : multiplatform (soon) integrated control of the analogic (AWG2021) and digital (in developpement) stimuli still necessary to use additional USB layer for PGA’s control It would be nice to have an official decission on the commun calorimeter ECS softw some SPECS improvements (I2C frame length, aknowledge check) Testbench DAQ & Control

17/02/ Single Card Testbench Definition PSVFEB synchronisation resetCheck decoding from TTC channel B clock phaseadjustment of the phase through automatic scan Data processingdigitizationadjustment of the clock phase through automatic scan treatment2 offsets/ 2 gains/ 1 α / 1trigger bit per channel SPD/PS synchronisation data integrity two pipelinescheck pipeline control (delays, bypassing) Data storage and transmission to CROC pipelinecheck behaviour

17/02/ Single Card Testbench Definition Trig_PGAmappingSPD, PS communicationFEB, Validation board algorithmBCId Neighbor searching SEL protectionhardwareSEL simulation with a specially designed board treatmentError bit to be monitored by ECS FE_PGA detection (if applicable) GlobalNoise, stability, crosstalk …

17/02/ Testbench definition Tests of the trigger part FEB Validation Card 1 Validation Card 2 Bottom neighbor top neighbor Right neighbor ECAL1 ECAL2 CROC SPD Multiplicity Left neighbor TTC SPECS L0 SPD

17/02/ Backplane for PSFEB Testbench

17/02/ Testbench definition First bunch of tests for the FEB prototype performed and no serious problem was identified « Almost » ready for the production testing At some point we’ll like to test « real life » communication  –1(2) ECAL cards –1 SPD card –3 PS FEBs –1 Validation Card –1 SPD Multiplicity –32 channels PS FEBs… Conclusion