NATIONAL HIV AND AIDS RESPONSE PREPARED BY THE NATIONAL HIV M&E UNIT 2008 LEVERAGING OUR HIV INFORMATION ASSETS M&E INDICATORS STATUS.

Slides:



Advertisements
Similar presentations
Supporting Early Child Development (ECD) in HIV/AIDS Programs for Africa Mary Eming Young HDNED.
Advertisements

HIV/AIDS Results Monitoring and Evaluation Systems Measuring the Multi-Sector Response.
February Dakar, Senegal
THE AFRICA LOCAL GOVERNMENT ACTION FORUM (ALGAF) PHASE IV SESSION V
AFRICAN LOCAL GOVERNMENT ACTION FORUM (ALGAF) PHASE IV SESSION V:LOCAL GOVERNMENT RESPONSES TO HIV/AIDS DAR ES SALAAM TANZANIA DR. Koku Kazaura, Betty.
NATIONAL YOUTH SYMPOSIUM FROM 4 TH TO 5 TH JULY 2004 AT GRAND REGENCY HOTEL Youth and Health presented by: Johnah Josiah Thematic area: Supported and Funded.
Kellie Wilson and Dave Burrows. Issues One key area of improvement required for GF proposals include the provision of: stronger more comprehensive situation.
Adolescents and HIV Alison Jenkins, UNICEF Tanzania Cover photo: © Khanga Rue Media/2014/Olvera.
Prevention of Mother-to-Child Transmission of HIV in Ghana
Prepared by: Marelize Gorgens-Albino, The World Bank Global AIDS M&E Team (GAMET) 1 12 Components of a Functional National HIV M&E System A short introduction.
GIPA/MIPA SOUTH AFRICA WORKPLACE MODEL. OUTLINE Background The GIPA principle: definition Why the GIPA principle? General lessons learned How far have.
© Aahung 2004 Millennium Development Goals Expanding the Agenda:
From Research to Practice: Scale-up of Male Circumcision for HIV prevention in Tanzania Wambura Mwita National Institute for Medical Research Mwanza, Tanzania.
Ghana’s HIV Response The Ghana Team: Richard N. Amenyah Matilda Owusu-Ansah Evelyn Awittor Lord Dartey Mercy Bannerman.
Tathmini GBV: Evaluating Comprehensive Gender-Based Violence Program Scale-up in Tanzania Susan Settergren Futures Group.
Kevin Fenton, MD, PhD, FFPH Director, National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention Centers for Disease Control and Prevention.
1 CHILDREN AFFECTED BY HIV/AIDS : Botswana Experience BY MINISTER OF HEALTH BOTSWANA HON. PROF. SHEILA DINOTSHE TLOU DATE 29 NOVEMBER 2007 IRELAND.
EngenderHealth/UNFPA Project – Ethiopia/Ukraine Strengthening the integration of HIV prevention in maternal health services. Increasing the capacity of.
“A VISION OF HOPE” EXPERIENCE OF SENEGAL IN THE FIGHT AGAINST AIDS AND REDUCING WOMEN’S VULNERABILITY Dr Khoudia Sow, CRCF, UMI 233 Dakar Sénégal.
Track A: Basic Science This track highlighted all aspects of HIV structure, replication, and the host immune responses and led to a greater understanding.
LIMPOPO PROVINCIAL MEN’S SECTORS/BROTHERS FOR LIFE PRESENTED BY: RAPAKWANA JOHANNAH MANAGER:GAAP in HIV & AIDS & STIs Directorate DEPT OF HEALTH AND SOCIAL.
HIV/AIDS BI-ANNUAL REVIEW 2008 Prevention -Goal, Indicators and Targets TACAIDS.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Sri Lanka Last updated: December 2014.
HIV and AIDS Data Hub for Asia-Pacific HIV and AIDS Data Hub for Asia-Pacific Review in slides China 1.
HIV and AIDS Data Hub for Asia-Pacific 11 HIV and AIDS Data Hub for Asia-Pacific Review in slides Mongolia.
Joint BI – ANNUAL Review of the HIV Response in Tanzania 2006 to 2008 MILESTONES IMPLEMENTATION ASSESSMENT OF PROGRESS REPORT BY RBM KALINGA 1.
Rapid Assessment of District and Community HIV and AIDS Response Challenges, Constraints and Prospects Technical Review 2008 Rapid Assessment of District.
Country gallery Vietnam. Basic socio-demographic indicators, Total population (thousands)87,375 Surface area333,200 sq. km Annual population.
Country gallery Malaysia. Basic socio-demographic indicators, Total population (thousands)26,572 Surface area329,847 sq. km Annual population.
© P. Vermeulen / Handicap International © W. Daniels pour Handicap International © B. Franck / Handicap International Project / Subject:Author:Last updated:
HIV and AIDS Data Hub for Asia-Pacific Review in slides Papua New Guinea Last updated: July 2015.
Structural, Policy and Legal Assessment Presented by Ms. Kokuteta Mutembei HIV/AIDS BI-ANNUAL REVIEW 2008.
Global Monitoring & Evaluation of HIV Prevention Among Most-at-Risk Populations: Update on existing guidance Priscilla Akwara, PhD Senior Advisor, Statistics.
Tanzania Output Monitoring System for HIV and AIDS TOMSHA A brief overview.
XVII INTERNATIONAL AIDS CONFERENCE PANCAP Satellite Meeting Hon Douglas Slater, Minister of Health, St. Vincent and the Grenadines.
The Multi-Sectoral Provincial Strategic Plan for HIV & AIDS, STIs & TB of KwaZulu-Natal Presentation to PEPFAR all partners meeting Monday 28.
DEVELOPMENT PARTNERS GROUP (DPG) SPECIAL BRIEFING SESSION ON HIV&AIDS 5 OCTOBER 2006 By DPG AIDS 1.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Afghanistan Last updated: December 2014.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
HIV and AIDS Data Hub for Asia-Pacific Review in slides India.
Access to HIV prevention and related services for people with disabilities in Ethiopia Esknder Dessalegne Feb. 21/11 Bujumbura, Burundi.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Lao PDR Last updated: July 2015.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Afghanistan Last updated: January 2016.
Recap of Day 1 June 11, 2007 Africa Region Consultation on Multisectoral Response.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Mongolia Last updated: December 2014.
MULTI-SECTORAL COORDINATION APPROACH OF THE UGANDA NUTRITION ACTION PLAN: PROGRESS Presented to the 9 th International Baby Food Action Network (IBFAN)
HIV and AIDS Data Hub for Asia-Pacific Review in slides Pakistan Last updated: January 2016.
Third Joint Bi-Annual Review of the HIV Response in Tanzania October 2008 Assessment of Progress on Implementation of Milestones from the Second Joint.
4 th AMTP UA Progress Report 5 th AMTP Outcomes Framework VISION The spread of HIV is halted in the Philippines OUTCOMES Persons at-risk, vulnerable,
1 06/06 e Global HIV epidemic, 1990 ‒ 2005*HIV epidemic in sub-Saharan Africa, 1985 ‒ 2005* Number of people living with HIV % HIV prevalence, adult (15-49)
YONECO SRHR POLICY. SHAREFRAME CONFERENCE Salima - Malawi Mr. Samuel Bota Board Member.
United Republic of Tanzania Ministry of Health & Social Welfare MINISTRY OF HEALTH AND SOCIAL WELFARE NATIONAL AIDS CONTROL PROGRAM HIV CARE AND TREATMENT.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Timor-Leste.
The impact of HIV/AIDS on Botswana (The effects of the pandemic in our country.)
HIV and AIDS Data Hub for Asia-Pacific Review in slides Sri Lanka.
Ethiopia Demographic and Health Survey 2011 HIV/AIDS Knowledge, Attitudes, and Behaviour.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Pakistan.
Multi-Sectoral Provincial Strategic Plan for HIV and AIDS, STIs and TB for KwaZulu-Natal Review Preliminary Findings Provincial Council on AIDS.
Prevention of Mother-to-Child Transmission of HIV: Scale-up of Critical Services in Uganda (District- based Approach) Edward Bitarakwate, MD, MPH Technical.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Pakistan Last updated: November 2014.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Sri Lanka Last updated: April 2016.
1 06/06 e Global HIV epidemic, 1990 ‒ 2005*HIV epidemic in sub-Saharan Africa, 1985 ‒ 2005* Number of people living with HIV % HIV prevalence, adult (15-49)
STRENGTHENING THE CAPACITY OF KEY POPULATIONS TO ENGAGE IN NATIONAL FUNDING PLATFORMS AND PROCESSES - TANZANIA CONTEXT ARASA PARTNERS FORUM 2015 PRESENTER;
Introduction to the NMSF The National Multi-Sectoral Strategic Framework (NMSF) on HIV&AIDS  Translates the National Policy of HIV&AIDS. 
TOMSHA is… a multisectoral routine output monitoring system.
Number of people receiving antiretroviral therapy in
NATIONAL HIV&AIDS M&E FRAMEWORK
THE HEALTH SECTOR RESPONSE TO THE HIV/AIDS EPIDEMIC
Mongolia Last updated: April 2016.
Presentation transcript:

NATIONAL HIV AND AIDS RESPONSE PREPARED BY THE NATIONAL HIV M&E UNIT 2008 LEVERAGING OUR HIV INFORMATION ASSETS M&E INDICATORS STATUS

O UTLINE Introduction The National Indicator Status: Selected some out of 49 indicator set Challenges Conclusion

I NTRODUCTION Provide an updates on selected indicator values on progress in achieving the NMSF objectives Highlighting the goal of HIV M&E System at national level

Registers at Health Facilities At Implementer Level HIV Act and Policy : The Body NMSF, which contains HIV and AIDS response goals L INKAGE BETWEEN THE T HREE O NES Monitoring Systems of organizations National HIV M&E Framework and Plan Indicators Data sources At National Level Health routine data Community-based routine data Surveys / Surveillance Education routine data School life skills Education Monitoring

FRAMEWORK FOR A FUNCTIONAL NATIONAL HIV M&E SYSTEM 12 COMPONENTS

THE STATUS: NATIONAL SELECTED INDICATORS 1. Percentage of young women and men aged 15–24 who are HIV infected There has been a statistically-significant decline in HIV prevalence among ANC attendees in the last 5 years: HIV prevalence amongst pregnant women has reduced, at the national level, from 9.6% in 2002, to 8.7% in 2004 and 6.8% in ( Source: ANC report) The HIV prevalence has shown reduction in the last 5 years. National HIV prevalence among the sexually active population is reported 5.8% in 2007 from THMIS , with females having a slightly higher rate 6.8% than males 4.7% drop from 7% from THIS report among age population.

HIV PREVALENCE DISTRIBUTION BY R EGIONS Data Source: THMIS

Source: THMIS HIV Prevalence In Tanzania By Age And Sex

THE STATUS: SELECTED NATIONAL INDICATOR SET … 2. Percentage of young women and men aged 15–24 who both correctly identify ways of preventing the sexual transmission of HIV and who reject major misconceptions about HIV transmission THMIS reported that 39% of young women aged and 42% of men aged had comprehensive knowledge of HIV and AIDS in Tanzania compared to TDHS results which was reported to have 45.3% of women and 41% of men aged The two study shows variations women percentage drops while men increase slightly.

THE STATUS: NATIONAL SELECTED INDICATORS … 3. Percentage of young women and men aged 15–24 who have had Sexual intercourse before the age of 15 The age of sexual debut has been increasing in Tanzania, with fewer people, over time, having sex before the age of % of women aged 15 to 24 and 10% of young men aged 15 to 24 have reported having sex by age 15 (THMIS ). 4. Percentage of women and men aged 15–49 who have had sexual Intercourse with more than one partner in the last 12 months. THIS found that 9% and 7% of women in the ages and had more than one sexual partner in the previous 12 months; while the findings for men were 30% and 34% respectively. THMIS (2007-8) found that 4% of women (15-49) and 25% of men (15-49) in Tanzania had had more than one sexual partner in the year before the survey

S EXUAL PARTNERS AMONG WOMEN AND MEN BY AGE Data Source: TDHS & THMIS

THE STATUS: NATIONAL SELECTED INDICATORS … 5. Percentage of women and men aged who received an HIV test in the last 12 months and who know their results Tanzania assesses progress in implementing HIV testing and counseling through periodic population based surveys. According to the THMIS , 19% of men and women aged had an HIV test and received their test results in the last 12 months.

NUMBER OF VCT SITES BY REGION Data Source: NACP 2006 Report

6. Percentage of adults and children with advanced HIV infection receiving antiretroviral therapy ARV combination therapy has been proven to reduce the rate of illness and death among PLHIVs. Tanzania has scaled up efforts to make ARV more accessible and free or affordable in most of the regions. 36% of adults and children with advanced HIV infection received ARVs as of December 2007 THE STATUS: NATIONAL SELECTED INDICATORS …

Source: NACP

7. Percentage of people expressing accepting attitudes towards people with HIV 26% of women and 35% of men expressed positive attitudes towards PLHIV in THMIS Data Source: THIS , TDHS & THMIS THE STATUS: NATIONAL SELECTED INDICATORS …

8.Percentage and number of orphaned and vulnerable children aged 0–17 whose households received free basic external support in caring for the child Data Source: THIS THE STATUS: NATIONAL SELECTED INDICATORS …

8. Number of income-generating projects in the last 12 months Through TOMSHA between April to December 2007, the 906+ implementers who reported on TOMSHA indicated that a total of 103,186 OVC, 727 elderly persons, 2,911 widows and widowers, 67,017 vulnerable households, and 4,148 vulnerable groups received free support (which may have included income-generating activities) 9. Number of community-based committees mobilizing services for households with OVC Through TOMSHA, between April to December implementers reported that they had supported a total of 25,047 PLHIV who received two or more support services THE STATUS: NATIONAL SELECTED INDICATORS …

10. Percentage of annual funding for HIV interventions that is spent on HIV and AIDS M&E CSOs Annual resource tracking form MDAs and LGAs Through TOMSHA, TACAIDS calculated from resource tracking forms (submitted by 906+ implementers) that for the year , 10% of their AIDS spending was on M&E. The PER shows that 14% of AIDS spending was on cross-cutting issues (M&E is included as part of cross-cutting issues, but is not included as a separate line item in the PER THE STATUS: NATIONAL SELECTED INDICATORS …

12. Percentage of implementers of HIV and AIDS interventions that have submitted TOMSHA forms on time in the last 12 months Through TOMSHA routine monitoring system received cumulated data from about 906+ out of 1,372 trained implementers for April to December There are over 2000 HIV implementers in the country (only 69% of them were trained in TOMSHA). For the period April to December % of all TOMSHA-trained HIV implementers in reported on TOMSHA. 13. Number of person-days of training that project staff and employees has undergone to manage and implement HIV-STI services in the last 12 months Through TOMSHA between April and December 2007, HIV 906+ implementers reported that they had spent 47,024 person-days working in HIV: 38,891 volunteers, 4,789 project staff and 3,344 employees. THE STATUS: NATIONAL SELECTED INDICATORS …

14. Percentage of organisations that have developed annual work plans with an approved budget, and that have implemented it in the last 12 months (by public sector (LGAs and MDAs), private sector and civil society) TOMSHA Data between April and December 2007, 57% of implementers reported that they had implemented their work plans for details. The limitation of this indicator is that it is based on self-reporting, and therefore requires onsite data verification to ensure credible indicator values. Organizations who reported on TOMSHA and said theirNumber of Implementers% Organizations had an annual work plan in the reporting year77786% Organizations annual work plans were costed58264% Organizations had an approved budget for the work plan61668% Organizations had funds for implementing and coordinating the activities 42146% Organizations implemented their work plans51657% Data Source: TOMSHA (April – Dec, 2007) THE STATUS: NATIONAL SELECTED INDICATORS …

C HALLENGES ENCOUNTERED IN N ATIONAL HIV R ESPONSE There are more data available which cannot give a clear picture of the interventions according to the indicator set protocols Not in place the Information Asset infrastructures and data governance for the National Response The principle of three ones, is not effective at district/ community level, due to multiple plan’s and budget being prepared at different times (e.g NMSF,GFATM, and the Government Budget, PEPFAR Planning )

C HALLENGES ENCOUNTERED IN N ATIONAL HIV R ESPONSE … MTEF capture only 26% of total spending, multiple planning and coordination structures for example TNCM and the annual PEPFAR planning. Some of Public and Private institutions focal persons are inactive which leads to lack of continuity of activities and understanding of priorities. Low disbursement of fund to various stakeholders work plan for HIV and AIDS interventions, resulting into either partial implementation or no implementation of work plan.

CONCLUSION The implementation of NMSF and development of the NMSF has resulted into achievements of some noticeable outcomes and impact on the HIV National response, as result of fully engagement of various stakeholders Community response has significantly increased, this has been possible due to the use of multisectoral approach, the formation of multisectoral AIDS Committees which widened the chance of involving many actors across different social sectors in the fight against HIV and AIDS infections, HIV and AIDS impact mitigation and HIV and AIDS care and support for members of the community who have already been infected.

CONCLUSION … The strong PPP adoption (Public Private Partnership) has made good achievements toward the support on the HIV and AIDS Interventions, Management and Leadership The operationalization of TOMSHA has made non health data/information be available from different implementers at grass root level, although they had reported only 9 months from April – December 2007, which help the policy and decision makers in making informed decisions easier. The establishment of Data Management Office to lead and ensure HIV data infrastructure are in place and have the data quality required to produce the right information product and disseminated to all stakeholders and the National Response – Leveraging our HIV Information Assets.