Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Barry Barish KILC12 Daegu, Korea 23-April-12 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler Global Design Effort 1 23-April-12.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Conventional Facilities and Siting Global Group (ARCFS)
Oct 22 Group Leaders Planning meeting
Barry Barish LCWS10 - Beijing 26-March-10
Barry Barish LCWS10 - Beijing 26-March-10
Barry Barish JSPS - Sendai 12-Sept-11
ILC DR instability simulations
ILC DR instability simulations
ILC Damping Ring electron cloud WG effort
Exit Capacity Substitution and Revision
Barry Barish Paris ICHEP 24-July-10
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
DR Session Introduction
Presentation transcript:

Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010

Date Event 2 DR Workshop Objectives Plans for TDP after SB2009 and AAP review –Objectives and milestones for 2010 and for the end of TDP in 2012 Plans for R&D and test facilities –Present status –Objectives and milestones for completion of the work –Final reports –Application to TD Damping ring Collaboration

Date Event 3 AAP Review Oxford 6-8 Jan 2010 The SB2009 Proposal has been presented to the reviewers For the damping rings it foresees: –3.2 km damping ring –1310 bunches –Same bunch distance and same current as the 6.4 km ring

Date Event 4 AAP Review Report In the light of the recommendation to not commit to the low beam power option the AAP recommends staying with 6 ns bunch distance and the full number of bunches, consistent with the previous statement of the AAP in April The AAP would be pleased to see the demonstration that 3 ns operation is viable after the viability of the 6 ns operation has been established. The AAP observes that the requirements set above may be realized in a 3.2 km tunnel. A cost/benefits analysis with up to four rings in a single tunnel as opposed to two rings in a 6.4 km tunnel should help determine the best configuration.

Date Event 5 Reaction from GDE EC That containment of the capital cost (VALUE) estimate at the RDR level is a primary TD Phase 2 goal. Our design activity is now aimed at making the project more robust against possible (expected) unit cost increases. To move forward with studies aimed at the possible adoption of the themes in SB2009 proposal, but not necessarily the exact details. To establish a formal process to make these changes to the baseline in an open and transparent fashion, and where necessary after due process and consultation with all stakeholders. To pursue and introduce the baseline modifications in a stepwise fashion, as individual and independent1 change requests, via the above mentioned process (point 3). To present a schedule for the phased changes to the baseline via the formal change control process, beginning in October 2010 and to be completed no later than mid 2011.

Date Event 6 DR Sessions Plans for R&D and test facilities Sunday 28, 9-10:30 – R&D Status Sunday 28, 11-12:30 – CesrTA Monday 29, 14-15:30 –ATF/ATFII session (joint with BDS ), including International Collaboration Board (closed)

Date Event 7 DR Sessions Plans for TDP after SB2009 and AAP review Saturday 27, 14-15:30 – Lattice Session Saturday 27, 16-18:00 –Double Repetition Rate Option (joint with BDS and sources) Sunday 28, 14-15:30 – Electron Cloud Working Group Monday 29, 9-10:30 –TDPII Organization and Plans + Baseline Decision

Date Event 8 DR Sessions Detailed agenda on Indico