Exit 17 Transportation Plan August 22, 2006 Exit 17 Transportation Plan Prepared for: Town of Colchester and CCMPO August 22, 2006 Selectboard Meeting.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Great Western Corridor Feasibility Study
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Module 7 Exercise Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15,
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
ROUNDABOUTS. What Is A Roundabout? A specific type of traffic circle Not all traffic circles are roundabouts.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Highways & Transportation I (ECIV 4333) Course Outline 1 The Islamic University of Gaza Faculty of Engineering Highways & Transportation I (ECIV 4333)
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Developing traffic engineering guidelines Lessons learned developing guidelines for the Ministry of Municipal and Rural Affairs, Kingdom of Saudi Arabia.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Martha Moore, P.E. Ghyabi & Associates October 10, 2014
Aaron B Wilson, EIT WesTech Engineering, Inc., SLC, UT Mitsuru Saito, PhD, PE Brigham Young University, Provo, UT ITE Western District Annual Meeting Santa.
“ROUNDABOUTS FIRST” POLICY IN NEW YORK STATE What is it and how did it get developed?
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Implementing the Freeland Subarea Plan Zoning and Development Regulations Island County Planning & Community Development 2016 Comprehensive Plan Update.
Working Group Core Team Meeting II February 14, 2008.
ROUNDABOUT CHARACTERISTICS TTE DEFINITIONS TRAFFIC CIRCLE: u Any intersection designed around a central island ROUNDABOUT: u A traffic circle with.
Grade separation.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Town of New Hartford Southern Area GEIS – Growth Concept & Alternatives Presentation Planning Board Meeting Monday, September 10 th 5:30 pm.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
1 INTERCHANGE SELECTION CE 550 SPRING OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
 Links the optimized settings to VISSIM, the operational analysis results is: Synchronization of Intersections This study employs the core logic of MAXBAND.
RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015.
Problem 1: Determination of Facility Types for Analysis.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Roundabout Feasibility: Analysis Framework and Design Considerations Presented By: Jason D. Pack, P.E. Fred Choa, P.E.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Study Advisory Meeting June 11, Study Advisory Meeting June 11, 2008 Project Development Process Planning Study (Recommendations) Environmental.
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
Chittenden County Metropolitan Planning Organization Communities working together to meet Chittenden County’s transportation needs 30 Kimball Ave., Suite.
LCI Implementation: Lessons learned in the planning and implementation of LCI Projects Urban Collage Inc.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
POM & I-84/US 730 IAMPs Morrow County Planning Commission Hearing December 20, 2011.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
The I-465 West Leg Reconstruction Project
Fordham at Columbia as a Grade-Separated Intersection
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Interchanges Ch. 6.
ROUNDABOUTS Improving Safety and Efficiency
FM 518 By-pass Traffic Review
Article 41 Wastewater Planning Capacity Study
Fordham at Columbia as a Grade-Separated Intersection
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Module 6 A 21st Century Transportation Network
Presentation transcript:

Exit 17 Transportation Plan August 22, 2006 Exit 17 Transportation Plan Prepared for: Town of Colchester and CCMPO August 22, 2006 Selectboard Meeting

Exit 17 Transportation Plan August 22, Presentation Overview 1.Study Purpose/Study Area 2.Traffic Forecasts –How traffic projections were developed –Effect of Circ and Milton Exit 3.Design Alternatives 4.Phasing Plan & Recommendations 5.Next Steps

Exit 17 Transportation Plan August 22, Study Purpose To develop a transportation plan for the Exit 17 Growth Center that: –Assumes wastewater system is implemented; –Accounts for effect of Circ Highway and New Milton Interchange; and –Presents a comprehensive list of projects to accommodate desired growth.

Exit 17 Transportation Plan August 22, Study Area Consistent with G-4 Zoning District State Highways Study Intersections –US 2/US 7 –Exit 17 Ramps –US 2/Jasper Mine –US 7/Park and Ride –US 7/Arbortech

Exit 17 Transportation Plan August 22, Twenty-Year Development Assumptions Phase 1 (120,000 gpd) –720 dwelling units –275 ksf commercial –1,270 vehicles/hour Phase 2 (225,000 gpd) –1,200 Dwelling Units –460 ksf commercial –2,100 vph Full Development Potential –1,300 Dwelling Units –560 ksf commercial

Exit 17 Transportation Plan August 22, Twenty-Year Traffic Projections 42% Increase in Through Traffic + Phase 2 Dev. Traffic

Exit 17 Transportation Plan August 22, Effect of Circ and Milton Exit

Exit 17 Transportation Plan August 22, Design Alternatives Assumptions Phase 2 Land Use Circ. Highway Complete to VT 127 Include New Local Roads No Milton Exit

Exit 17 Transportation Plan August 22, Exit 17-Chimney Corners Alt 1

Exit 17 Transportation Plan August 22, Exit 17-Chimney Corners Alt 2-A

Exit 17 Transportation Plan August 22, Exit 17-Chimney Corners Alt 2-B

Exit 17 Transportation Plan August 22, Exit 17-Chimney Corners Alt 2-C

Exit 17 Transportation Plan August 22, Exit 17 Alternative 3

Exit 17 Transportation Plan August 22, Exit 17 Alt. 4: Single Point Urban Interchange

Exit 17 Transportation Plan August 22, Exit 17 Alt 5: Tight Diamond

Exit 17 Transportation Plan August 22, Exit 17-Chimney Corners Alts Comparison

Exit 17 Transportation Plan August 22, US 2 – Jasper Mine Road

Exit 17 Transportation Plan August 22, US 7 - Brentwood

Exit 17 Transportation Plan August 22, US 7 – Arbor Garden

Exit 17 Transportation Plan August 22, Total Costs

Exit 17 Transportation Plan August 22, Phasing Plan

Exit 17 Transportation Plan August 22, Recommendations & Next Steps Conduct Project Definition Study for US 2/I-89 Ramps and US 2/US 7 Evaluate Traffic Signals and Roundabouts No Further Evaluation of Interchange Configuration Construction in Two Phases NB Off-Ramp and US 2/US 7 Together and First SB Off-Ramp and Bridge Latter Local Roads and Bridges Obtain easements or ROW as developments occur Transportation Planning Project Definition / Scoping Environmental Documentation Final Eng - ROW Construction Next Step This Study

Exit 17 Transportation Plan August 22, 2006 Appendices

Exit 17 Transportation Plan August 22, About Roundabouts Key Features –Yield at entry –Deflection created by center island –Flare at approach –Design speed between mph Not a “Traffic Circle” or “Rotary” Rural Location Urban or Village Location

Exit 17 Transportation Plan August 22, No ChangeWith Circ With Circ and Milton Exit 2025 Congestion – Signalized Intersections Includes Background Growth and Traffic from Phase 2

Exit 17 Transportation Plan August 22, Congestion – Stop Controlled No ChangeWith Circ With Circ and Milton Exit Includes Background Growth and Traffic from Phase 2