Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.

Slides:



Advertisements
Similar presentations
L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio.
Advertisements

Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.
Annoucements  Next labs 9 and 10 are paired for everyone. So don’t miss the lab.  There is a review session for the quiz on Monday, November 4, at 8:00.
TRIGGER STATUS AND MENU OPTIMIZATION LHCC Referee Meeting with ATLAS – 7 th July 2009 Ricardo Gonçalo (RHUL) on behalf of ATLAS Trigger/DAQ.
LAB 3 – Review of the Assignment. -- Clarifications Vikram Murali. TA : CSE 140L Prof. CK Cheng.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Top Trigger Strategy in ATLASWorkshop on Top Physics, 18 Oct Patrick Ryan, MSU Top Trigger Strategy in ATLAS Workshop on Top Physics Grenoble.
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Testing Test Plans and Regression Testing. Programs need testing! Writing a program involves more than knowing the syntax and semantics of a language.
AMOD Report Doug Benjamin Duke University. Hourly Jobs Running during last week 140 K Blue – MC simulation Yellow Data processing Red – user Analysis.
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
MC, REPROCESSING, TRAINS EXPERIENCE FROM DATA PROCESSING.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Trigger Offline Monitoring Report Valeria Bartsch (Sussex), Ricardo Gonçalo (RHUL) Trigger General Meeting – 26 th May 2010.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
Friday Oct 30Monday Nov Data09_cos Data09_calophys Data09_cos Data09_calophys Data09_calophys Some of the last.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
Trigger Offline DQ Monitoring DQ Meeting – 27 Oct 2009 Ricardo Goncalo for Trigger Offline Monitoring.
TRIGGER STATUS AND MENU OPTIMIZATION LHCC Referee Meeting with ATLAS – 7 th July 2009 Ricardo Gonçalo (RHUL) on behalf of the ATLAS TDAQ.
Jet Trigger On-Call Shift Summary Ricardo Gonçalo - LIP.
Software installation for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 05 april 2007.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
DPDs and Trigger Plans for Derived Physics Data Follow up and trigger specific issues Ricardo Gonçalo and Fabrizio Salvatore RHUL.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
Optimizing Your Computer To Run Faster Using Msconfig Technical Demonstration by: Chris Kilkenny.
Full Dress Rehearsal (FDR1) studies Sarah Allwood-Spiers 11/3/2008.
Sight Word List.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
Moritz Backes, Clemencia Mora-Herrera Département de Physique Nucléaire et Corpusculaire, Université de Genève ATLAS Reconstruction Meeting 8 June 2010.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Prompt Calibration Loop 11 February Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
Performance DPDs and trigger commissioning Preparing input to DPD task force.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
CPU on the farms Yen-Chu Chen, Roman Lysak, Miro Siket, Stephen Wolbers June 4, 2003.
Trigger Input to First-Year Analysis Model Working Group And some soul searching… Trigger Open Meeting – 29 July 2009.
M. Gheata ALICE offline week, October Current train wagons GroupAOD producersWork on ESD input Work on AOD input PWG PWG31 (vertexing)2 (+
E/gamma report Ricardo Gonçalo for the e/γ slice.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
Points from DPD task force First meeting last Tuesday (29 th July) – Need to have concrete proposal in 1 month – Still some confusion and nothing very.
Study of missing Level-1 triggers using data10 Hardeep Bansil University of Birmingham Trigger E/Gamma Signature Group Meeting 20/05/2010.
Trigger release and validation status and plans David Strom (Oregon), Simon George (RHUL), Ricardo Gonçalo (RHUL)
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
Metadata and Supporting Tools on Day One David Malon Argonne National Laboratory Argonne ATLAS Analysis Jamboree Chicago, Illinois 22 May 2009.
TrigEgamma Note L1 Plots Status Update Hardeep Bansil University of Birmingham Birmingham ATLAS Weekly Meeting 30/09/2010.
Latest News & Other Issues
F. Bellini for the DQM core DQM meeting, 04th October 2012
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Experience between AMORE/Offline and sub-systems
HLT Jet and MET DQA Summary
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Presentation transcript:

Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009

Offline processing machinery Now running on DEBUG stream automatically on Tier0 Alessandro’s work interacting with Tier0 team Offline monitoring shifter gets files processed with trigger Still needs to run pre- and post-analysis scripts from Anna on CAF CAF capacity not being used fully Antonio investigating

Trigger DQ Flags Should be all black while trigger not running online Otherwise follow instructions on

The story so far… Beam splashes on Friday evening Single beams during the weekend Collisions on Monday All done, go home for Christmas? Not quite yet… Reprocessed trigger offline in CAF

Monday evening we launched the first pass reproc of run For speed and relevance, we did the whole physics_L1Calo stream plus selected lumi blocks of BPTX and MinBias. The good news is that there were no crashes or errors from the HLT so we can already conclude that it would have been safe to run the HLT online. New tests today to provide the same again for an updated menu.However, there was very little in the HLT actually run. The L1 trigger config used at the time (see below for full story) was either normal items with BPTX (but with low rate as the beam was too weak) or _EMPTY items with BGRP3 (set to the BCID of the beam). Because we don't seed HLT chains off _EMPTY items, very few HLT chains ran, but we still had some interesting feedback from taus and minbias/tracking. With input from slice experts, an amended HLT menu was built on Monday evening by the menu expert, to give more HLT activity from the LVL1 triggers we had. We used a combination of unseeded chains and seeding chains from _EMPTY items to achieve this. These data will soon be available for analysis. – Pass 1: AtlasP1HLT-15.5.X.Y,val,rel_1 smk 132 l1psk 26 hltpsk 66 – Pass 2: AtlasP1HLT-15.5.X.Y,val,rel_2 smk 138 lspsk 26 hltpsk 69 Based on feedback we will decided whether to do a pass3.

LVL1 trigger config - from David Berge: Keep in mind we had some non-standard trigger settings in this run towards the end of the first phase of collisions (starting LB 141). If you look at the trigger rate plot Thilo showed in today's weekly run meeting, then you see this block of magenta coloured trigger rates starting LB 150, that's when the settings were finally correct. There is a first spike of magenta rates at LB 142, this is when the prescale key to select 'EMPTY' items went in, without the proper bunch group setting. We have then tried to update the bunch group on LB 143, which failed. So we immediately switched back to the beam L1PS key, since we saw huge back pressure. I would expect in LBs 142 and 143 you see events spread out over all BCIDs. Then we went back to the beam prescale key for LBS 144 to 149. At this time the beam intensities had already dropped below our BPTX trigger threshold, that's why you see in the trigger rate plot no rate at all. We had then loaded the bunch groups directly on the hardware, and started using the L1PS key with tweaked EMPTY items as of LB 150. FYI, as of LB 140, the BPTX beam 2 trigger started disappearing, at that point BPTX beam 1 was already gone. So at that point the MBTS triggers started becoming inefficient. In general, selecting events based on BCID 2554 is the safest bet for the times where we had paired bunches in ATLAS, if you don't want to switch between different L1 items as a function of LB.

Thanks! To all people on offline shift this week: Swagato Banerjee, Mansoora Shamin, Ignacio Aracena, Hulya Guler, Cibran Santamarina Rios Alessandro Di Mattia for providing the machinery for running the Tier0 debug stream jobs and soon the reprocessing jobs Anna Sfyrla for fixes to analysis scripts Valeria Bartsch for the offline shifter page Antonio Sidoti for investigating the CAF usage Everyone else I have forgotten - yes, it’s been a bit hectic…