What is the Exact location of the site –Moab UT Surveyed site moved by host to parking lot –Grants NM On lava flow and digging an issue –Clovis NM Surveyed site near walking trail and host was concerned about vandalism
Will Digging Be Difficult?
Camp Verde AZ
Can Concrete Truck Access Site?
Reasons for a Concrete Truck Hand Mixing takes a long time 280 forty pound bags of Redi-Mix needed (11,200 pounds) 280 Gallons of water needed (2,352 pounds) A total weight of materials needed 5.6 Tons
What Snow Depth Is Expected?
Access to Site Difficult?
Solid Rock Install
Solid Rock Mount
Solar Panels Shaded
Subject to Flooding?
Site Access Issues?
Typical Trailer of Hardware
Reasons For a Site Host Care for Site vegetation Empty the Gauge Perform Minor Unscheduled Maintenance Recover Data
What Happens During an Install? USRCRN sites normally take Two Days –Day One is Site Infrastructure –Day Two is Hardware and Cal’s