MICE FAC Alain Blondel 21 september 2007 1   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.

Slides:



Advertisements
Similar presentations
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
Advertisements

MICE VC Alain Blondel 2 August Summary of the MICO meeting 26 July 2007 Overview TargetTarget (CB) Beam line engineering & installationBeam line.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
CMPB Alain Blondel 14 April STATUS OF MICE.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CMPB Alain Blondel 1 August spokesperson remarks CMPB MICE NEWS.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Muon Ionisation Cooling Experiment Overview
Status of the MICE Construction Project
MICE Project in the US: Completion of Efforts
MICE PM Report Progress with the Infrastructure A few problems
Report on EUCARD WP6: MICE Transnational Access (TA)
Presentation transcript:

MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE

MICE FAC Alain Blondel 21 september Overview MICE collaboration meeting 7-10 october Overall good progress of the experiment... but many lose ends! -- Priority #1 is to ensure that full beam line is ready for step I data taking at the end of the Christmas shutdown (20 January) -- A cosmic test will be organized in bldg. R8 in November-December with a good fraction of detectors (DAQ, Tracker, CKOV, TOF0 and TOF1, KL) -- shakedown of the detectors and practice of DAQ -- avoids work pileup in February some delays appear in TOF and KL (delay to mid december) -- preparations well underway -- Much progress has been accomplished in the MICE beam line and Hall construction Main technical uncertainties concern the target, and the PSI solenoid -- target: + authorization given (using diamond like bearings) to install -- PSI solenoid: MLI insulation and heat leaks still a worry -- now preparing to man experiment in 2008: Mice Operation Managers (MOM) and shifters. Run plan being prepared. first MOMs: A.B (Nov 15-Dec15) K.Long (Dec 16-Jan15) M.Zisman (Jan 16-Feb 17)

MICE FAC Alain Blondel 21 september  MICE Schedule as of October 2007 January 2008 STEP I April 2008 STEP III July 2008 STEP II STEP IV Delivery of 1st FC ~May 2009 STEP V >summer 2009 STEP VI end 2009 ( ) UK PHASE I UK PHASE II

MICE FAC Alain Blondel 21 september Issues -- upstream beam aligned to old target position ==> off 22 mm (being fixed) -- target: rates vs ISIS irradiation (loss monitors) still an issue -- PSI solenoid repair – still struggling with MLI, heat leakes etc.. -- Q7-9 refurbishment 'just-just in time' -- TOF0/TOF1/KL construction slowed down by admin at INFN (1 Mo delay) -- Step III spool piece to be designed for absorbers TOF2 shielding still under discussion -- Step IV: procurement of absorbers is an issue (Japan funding!) -- Support for collaborators at RAL needs to be sorted out (Bulgaria & Italy in particular) Reviews: -- Beam line review 16 November: have we got all monitoring/tuning knobs? -- DAQ review mid-january -- Phase II review early january -- Diffuser review: ongoing, report in preparation Documentation -- need to update documentation (M Technical Reference Document) -- DAQ manual and detector operation manuals

MICE FAC Alain Blondel 21 september Cosmic-ray integration test: Will start 12Nov07: Will include: CKov, Tracker, ToF, KL (pre-sampler)

MICE FAC Alain Blondel 21 september Nearly completed cold mass for first spectrometer solenoid magnet 9/11/07 10/3/07 --First magnet under assembly; expect complete by December07 -- magnetic measurements at FNAL January-February08 Arrive RAL in March08 Begin step II in April-May08 Spectrometer Solenoid (LBNL)

MICE FAC Alain Blondel 21 september Mice common fund proposal was approved at the collaboration board.. £3000 per Ph. D holder.. first installment due October 1, 2007 this is likely to represent a contribution of order k£ per year.. MICE PM to set up account and to establish invoices to institute leaders (ongoing) ISIS beam delivery is acknowledged to be a welcome contribution of the host lab The muon beam line electricity will be a major source of the expenses and MICE would like to request that this be covered by the host lab Common fund

MICE FAC Alain Blondel 21 september Access to MICE by collaborators from abroad It has become more and more evident that running MICE will require people on the site at RAL for extended periods of running. O(6 mo/year) This is beyond the scope of the MICE-UK project. For EU partners there exists the possibility of Transnational Access support by EU Such a proposal is being developed for the next "CARE" proposal (OMIA?) In 2008 there will be no EU support yet. For other collaborators bilateral collaboration agreements should be established. Explicit request has been made in this direction by Chinese colleagues est. need for 2008 was transmitted to N. McCubbin (100k£ of which 45k£ for Bulgarian and Chinese) issue of beam line electricity pending.

MICE FAC Alain Blondel 21 september Conclusions In spite of difficulties, MICE has been making considerable progress and things are speeding up! Still on schedule to demonstrate ionization cooling by 2010 Funding is essentially complete for Phase I and II (BUT: UK Phase II, Japan, SW) Common Fund begins to be invoiced Travel and subsistance of MICE collaborators at RAL is an issue. Funding request to support subsistence at RAL of collaborators from EU is being prepared with framework of OMIA MICE muon test facility represents a beautiful scientific investment!