Implementation Procedures Comment Period: 1/19/10 - 3/17/10 Draft IPs available at: www.tceq.state.tx.us/nav/eq/eq_swqs.html Electronic comments may be.

Slides:



Advertisements
Similar presentations
Wastewater Permit Renewals
Advertisements

Drought Planning and Response Linwood Peele Linwood Peele Water Supply Planning Section Water Supply Planning Section NCDENR - Division of Water Resources.
Approach for Including Nutrient Limitations within NDPDES Permits Dallas Grossman Division of Water Quality
©Lloyd Gosselink Rochelle & Townsend, P.C. Presented by: LAUREN KALISEK (512) Congress Avenue Suite 1900 Austin, Texas.
Connecticut Department of Energy and Environmental Protection.
Critical Conditions Review
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Water Quality Division Updates David W. Galindo, Director.
Panel Discussion Oil and Gas Waste Management in Texas Chance Goodin and Diane Goss Texas Commission on Environmental Quality (TCEQ) Grant Chambless, P.G.
Title V Site Operating Permits (SOPs)
Recreational WQ Standards and Wastewater Disinfection Jim Davenport Monitoring & Assessment Section Water Quality Planning Division Office of Water Texas.
WQBELs Karen Holligan May 6, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Implementation of Antidegradation Policies for Indiana Waters.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
2015 Environmental Trade Fair and Conference Jill Csekitz Technical Specialist TCEQ Monitoring & Assessment Section Devils River State Natural Area Image.
Implementation Procedures (IPs) Brittany Lee Standards Implementation Team
Industrial and Hazardous Waste Easier, Better, Faster Permitting TCEQ Environmental Trade Fair Austin Convention Center May 6, 2015 Adrienne Clark Cynthia.
Redwood River TMDL Critique David De Paz, Alana Bartolai, Lydia Karlheim.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
RUAA Public Release and Comment Period Nikki Jackson TIAER Project Manager June 27, 2013 Leona River Watershed Partnership Meeting Uvalde, Texas.
Florida Department of Environmental Protection Air Quality Standards and Nonattainment Updates Rule Development Workshop Chapter , F.A.C. October.
City of Austin Environmental Health Services Division Proposed City Code Changes Presented by: David Lopez, Chief Environmental Health Officer Vince.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
Proposed Revisions to the State’s Surface Water Classification System Jan. 7, 2010 Public Workshop Daryll Joyner Bureau of Assessment and Restoration Support.
Water Quality Division Updates David W. Galindo, Director.
General Operating Permits
Procedures to Implement the Texas Surface Water Quality Standards
Fecal Bacteria Total Maximum Daily Loads (TMDL) in 4 Austin Watersheds Presented to the City of Austin Environmental Board November 7, 2012.
Bacteria Rulemaking Inclusion of Bacteria Limits in TPDES Permits.
Potential Changes to Sections and 307.9: Standards Applicability and Attainment Gregg Easley TCEQ Water Quality Standards Team September 6, 2007.
Water Quality Standards History – Yesterday, Today and Tomorrow ENVIRONMENTAL FEDERATION OF OKLAHOMA 17th Annual Meeting October 1-3, 2008 Derek Smithee.
Changes to § Application of Standards and §307.9-Determination of Standards Attainment Gregg Easley Water Quality Standards Team Texas Commission.
OHIO EPA UPDATE ORSANCO, October 20, 2009 George Elmaraghy, P.E., Chief.
August 1 st Draft of Offshore Aquaculture Amendment Gulf Council Meeting August 11-15, 2008 Key Largo, FL Tab J, No. 6.
Water Resources Workshop Standards, Use Attainability, Impairments and TMDLS Richard Eskin Maryland Department of the Environment February 20, 2004.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
30 TAC Chapter 307 Texas Surface Water Quality Standards Workgroup meeting March 7, 2007.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
Revisions to: The Procedures to Implement the Surface Water Quality Standards Mrs. Brittany M. Lee Standards Implementation Team Phone:
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
James River Chlorophyll Study Status Update: May 3, 2016 Chesapeake Bay Stakeholder Advisory Group John Kennedy, DEQ Office of Ecology.
Integrated Watershed Management
Water Quality Planning Division Monitoring & Assessment Section
Industrial & Hazardous Waste Updates and Emerging Issues
TCEQ Environmental Trade Fair
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
Bacteria Loadings Watershed Model:
TCEQ Environmental Trade Fair Austin Convention Center May 3, 2016
Department of Environmental Quality
Water Quality-Based Effluent Limits
Water Quality Planning Division Monitoring & Assessment Section
Peter Schaefer Standards Implementation Team
Peter Schaefer Standards Implementation Team
Update on Whole Effluent Toxicity (WET)
TCEQ Environmental Trade Fair Water Quality Division
Wastewater Permitting Updates
Update on Whole Effluent Toxicity (WET)
Agency-Managed Projects (AMP) Client Agency Agreements (CAA)
Water Quality Planning Division Monitoring & Assessment Section
Kasy Stinson Water Supply Division
Whole Effluent Toxicity (WET)
Procedures to Implement the Texas Surface Water Quality Standards
Wastewater Permitting Updates
Aquifer Storage and Recovery Recoverability of Injected Water
Presentation transcript:

Implementation Procedures Comment Period: 1/19/10 - 3/17/10 Draft IPs available at: Electronic comments may be submitted via to

Implementation Procedures Written comments may be submitted to: Mr. David Galindo, MC 150 Water Quality Division Texas Commission on Environmental Quality P.O. Box Austin, Texas or faxed to (512)

Implementation Procedures Current IP version includes: New section on nutrient screening procedures. Updated MALs and additional explanatory language. More stringent critical flow calculation for streams and rivers with a significant spring flow component. Dechlorination requirements expanded to minor domestic facilities (>0.5 MGD). New section on converting new fish-tissue based criteria to water column criteria. New section on recreational UAAs.

Implementation Procedures Revisions from the draft IPs presented to stakeholders on 1/9/09 include: Removed seagrass screening procedures Removed one year transition period for replacement of fecal coliform with E. coli limits. Added nutrient screening for renewals and Industrial permits on a case by case basis Removed human health screening procedures for discharges to intermittent water bodies.