Bridge Girder Alternatives for Extremely Aggressive Environments Project Manager: Will Potter, P.E. - FDOT Research Team: Jeff R. Brown, PhD, Assoc. Professor.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Structural Steel Construction
CIEG 301: Structural Analysis
Actions and Retrofit of Post Earthquake-Damaged Bridges
St. Croix River Crossing Project Public Information Meeting
3D Analysis with AASHTOWare Bridge Design and Rating
Ying Tung, PhD Candidate
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
CEE Capstone II Structural Engineering
Bridge Engineering (6) Superstructure – Concrete Bridges
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
Analysis Model and Displacement Measurement Prof. Ho-Kyung Kim (Seoul Nat’l Univ.) Prof. HaeSung Lee (Seoul Nat’l Univ.) Prof. Nam-Sik Kim (Pusan Nat’l.
ADSC/CALTRANS CIDH Pile Workshop Spring Overview of Structural Design and Detailing of Large Diameter Drilled Shafts (Caltrans Practice) Amir M.
Two-Span LRFD Design Example
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Design and Rating for Curved Steel I- and box-girder Bridge Structures
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
Virtis-Opis Update Virtis-Opis User Group Training Meeting Helena – August 2011.
PGSuper2AASHTOWare Bridge Data Translator
Final Report Terminal X McCarran International Airport.
Fiber-Reinforced Polymer (FRP) Composite Bridge Decking Project Team Award - $460,305 BridgeComposites, LLC Integrated Materials and Applied Computing,
Development of long span composite truss bridges
Todd Thompson, PE – SD DOT AASHTOWare Bridge Task Force, Chair Presented to the RADBUG Traverse City, MI August 12, 2014.
Design of Connections by Toby Mottram
FRP Reinforcement of Concrete
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
Fiber-Reinforced Polymer (FRP)
By PARIKH KALPESH. Overview Introduction Structural evaluation of the bridge deck, girders, abutment, and piers Recommended non destructive tests Short.
Advanced Polymer Composites in the Civil Infrastructure
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
Introduction of Open Web Steel Joist, Deck and Composite Steel Joist
I. Truss Bridge Gussets Background
PA Non-composite Adjacent Box Beam Bridges PennDOT June 2006 A presentation adapted from the AASHTO T-18 Bridge Inspection Technical Committee Meeting.
1 Differences Between BRASS and AASHTO Standard Spec Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
N.W.F.P. University of Engineering and Technology Peshawar 1 By: Prof Dr. Akhtar Naeem Khan Lecture 12: Composite Beams.
Comparative Study of Codes for the Design of Composite Decks and Plate Girders for Bridges and Buildings By Venkata S. Vemana For CIVL 511 – April
1 NEESR Project Meeting 22/02/2008 Modeling of Bridge Piers with Shear-Flexural Interaction and Bridge System Response Prof. Jian Zhang Shi-Yu Xu Prof.
C. C. Fu, Ph.D., P.E. The BEST Center
Moment Connection Requires Bolts Outside the Flanges
Design and Rating for Curved Steel I- and box-girder Bridge Structures
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
Dr Ana M. Ruiz-Teran Transverse schemes for bridge decks. Part 3: Box girders.
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
1 Differences Between BRASS and AASHTO LRFD/LRFR Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
By: Antoine N. Gergess, PhD, PE, F.ASCE
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
GTCOMPROP (Georgia Tech COMposite Material Member PROPerties calculator) Structural Engineering Software for the Analysis of Space Frame Structure Composed.
RATIONAL K VALUES FOR BRIDGE PIER DESIGN David Liu, Ph.D., P.E., S.E. Robert Magliola, P.E., S.E. PARSONS.
New Hampshire Technical Transfer Josh Olund, P.E., PhD The Brookfield Floating Bridge New Hampshire Technical Transfer Josh Olund, P.E., PhD The Brookfield.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Design of Gantry Girders
Offsite manufactured Bridges
Girder-deck system (cm)
Seismic Design Impact to
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
Bridge modelling with CSI software.
Dr. Ali I. Tayeh First Semester
Chapter-2 Parts of Steel Bridges.
ENCE 455 Design of Steel Structures
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
FIBER REINFORCED CONCRETE
Mitre III Building McLean VA Debra Schroeder Structural Option.
AASHTOWare Bridge Design & Rating (BrDR) 3D FEM Analysis Capabilities
Presentation transcript:

Bridge Girder Alternatives for Extremely Aggressive Environments Project Manager: Will Potter, P.E. - FDOT Research Team: Jeff R. Brown, PhD, Assoc. Professor of Civil Engineering - ERAU Daewon Kim, PhD, Asst. Professor of Aerospace Engineering - ERAU Ali Tamijani, PhD, Asst. Professor of Aerospace Engineering - ERAU BDV22 TWO

Project Overview Conceptual design study to investigate FRP or Hybrid-FRP bridge girders for marine environments Span lengths limited to 30 – 75 ft U.S. 192 Indian River Causeway – East side relief bridge in 1994 (< 50 years old)

Project Overview Task 1 – Literature Review Task 2 – Conceptual Design Study Task 3 – Final Report Carbon/Glass FRP bridge girder in Madrid, Spain (2007)

Project Timeline Year MonthJul.AugSep.Oct.Nov.Dec.Jan.Feb.Mar.Apr.MayJun. Literature Review Conceptual Design Study Final Report Year MonthJul.AugSep.Oct.Nov.Dec.Jan.Feb.Mar.Apr.MayJun. Literature Review Conceptual Design Study Final Report Project Completion

Task 1 – Literature Review Existing standards, specifications, and guidelines Material systems and manufacturing methods Pre-Standard for Load and Resistance Factor Design (LRFD) of Pultruded Fiber Reinforced Polymer Structures

Task 1 – Literature Review Current applications of FRP bridge girders

Task 1 – Literature Review Advanced composites systems  3-D Stitching  Integrated pultruded rods Images from NASA report on Damage Arresting Composites for Shaped Vehicles

Task 2 – Conceptual Design Study Design requirements  Strength and Serviceability per AASHTO LRFD and FDOT Structures Design Guidelines (SDG)  75 year service-life in an “Extremely Aggressive Environment” per FDOT SDG  30 ft. to 75 ft simply supported span lengths Images from NASA report on Damage Arresting Composites for Shaped Vehicles

Task 2 – Conceptual Design Study Design requirements (cont.)  Practical design methodology including: o Global and local strength requirements o Connections between deck and girder for composite action  Girder is cost-competitive over its service-life with traditional materials (Reinforced/ Prestressed concrete)

Task 2 – Conceptual Design Study Concept development  Stand-Alone Pultruded Sections

Task 2 – Conceptual Design Study Concept development  Built-up Pultruded Sections

Task 2 – Conceptual Design Study Concept development  VARTM Open-top Box Girders

Task 2 – Conceptual Design Study Preliminary analysis and design Evaluation criteria 1.Material quantities 2.Material costs 3.Manufacturing costs a)Tooling b)Fabrication 4.Constructability a)Transportation considerations b)On-site maneuverability c)Effect on construction timeline 5.Durability 6.Maintenance and inspection 7.Manufacturing adaptability 8.Design methodology 9.Comparison to traditional RC/PC construction

Task 2 – Conceptual Design Study Detailed analysis for top three concepts Stability analysis for local and global buckling (finite element analysis) Bracing and diaphragms for moment distribution (including connections) Shear transfer between the FRP composite and the concrete bridge deck End bearing design Practical design methodologies for top three concepts

Task 3 – Final Report Summarize findings Recommendations for future work

Thank you… Contact info  Jeff Brown  Daewon Kim  Ali Tamijani