International Atomic Energy Agency Group 3 Moderator: Jack Rapporteur: Joerg.

Slides:



Advertisements
Similar presentations
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
Advertisements

EURADWASTE 29 March 2004 LOCAL COMMUNITIES IN NUCLEAR WASTE MANAGEMENT THE COWAM EUROPEAN PROJECT EURADWASTE, 29 March 2004.
Regulation of Low Level Waste Management
Study Objectives and Questions for Observational Comparative Effectiveness Research Prepared for: Agency for Healthcare Research and Quality (AHRQ)
What to Provide to OMB History of the rule Problem to be addressed –Quantitative and qualitative analysis “Significant Regulatory Action” under 12866(3)(f)
Climate Change Committee WG1 QA/QC terminology and requirements from the IPCC Good Practice Guidance and the Guidelines for National Inventory Systems.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
© 2006 IBM Corporation Introduction to z/OS Security Lesson 9: Standards and Policies.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
IAEA International Atomic Energy Agency International Workshop on the Safe Disposal of Low Level Radioactive Waste WG3 debriefing.
WORKING GROUP 4 KEY DISCUSSION RESULTS TOPICS 2 & 3 International Workshop on the Safe Disposal of Low Level Radioactive Waste 03 to 05 February 2015,
What is Business Analysis Planning & Monitoring?
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Test Organization and Management
Update on progress with development of DS459
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
The Clarified International Standards on Auditing Brian Smith June 8, 2011.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
TM Technical Meeting on the Disposal of Intermediate Level Waste
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
Segment SCD 4.3 Module SCD 4: Safety Case Segment SCD 4.3 Documentation and use of the safety case.
Module 4: Systems Development Chapter 12: (IS) Project Management.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
RISK MANAGEMENT The process of weighing policy alternatives in the light of the results of risk assessment and, if required, selecting and implementing.
Human Intrusion and Future Human Actions in relation to Disposal of Radioactive Waste TM September 24, 2012 Presented by: L. Bailey on behalf of.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
IAEA International Atomic Energy Agency Roger Seitz Lucy Bailey HIDRA Human Intrusion in the context of Disposal of RadioActive waste Closing Summary for.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Recommendations for Developing Effective Risk Management Policies for Contaminated Site Cleanup An Overview of Risk Management Concepts and How Risk Management.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Technical Support for the Impact Assessment of the Review of Priority Substances under Directive 2000/60/EC Updated Project Method for WG/E Brussels 22/10/10.
El Cabril near surface disposal facility
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Definition and overview of required safety documentation (e.g., safety case and safety assessment) Phil Metcalf Workshop.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Summary of Session 6 Long Term Operation 1 Christopher Miller NRC, United States of America IAEA International Conference on Operational Safety Vienna.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
International Atomic Energy Agency Meeting Summary Technical meeting of the International Project on Demonstration of Operational and Long-Term Safety.
IAEA International Atomic Energy Agency Working Group 2B Developing a Capable NEPIO Difficulties and Solutions.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
IAEA International Atomic Energy Agency Roger Seitz Potential Working Groups.
Role and Development of the Safety Case Components of the Safety Case.
IAEA International Atomic Energy Agency MANAGEMENT OF THE REVIEW PROCESS Luc Baekelandt Safety of radioactive waste management.
Development of a disposal concept WG5. How to deal with the RP Principle Need to educate the public to put the risks in context Public want to see the.
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
RISK COMMUNICATION VELIA ARRIAGADA RIOS INGENIERO AGRONOMO SERVICIO AGRICOLA Y GANADERO CHILE.
1 Working Group 1: Decision-Making and the EBS Design Process in the Safety Case EBS-4 Workshop Tokyo, Japan 14 September 2006 附件二.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Page 1 | Proprietary and Copyrighted Information Safeguards Gary Hannaford, Task Force Chair IESBA Meeting New York, USA June 29 – July 1, 2015.
The Safety Case Radioactive Waste and Spent Fuel Management Unit
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Safety Case Components and Documentation
Indicative PRIDe Project Plan
Introduction: IAEA activities / Documents on human intrusion
Presentation transcript:

International Atomic Energy Agency Group 3 Moderator: Jack Rapporteur: Joerg

International Atomic Energy Agency Subjects to tackle Uncertainty and uncertainty management Make a link, place a hook towards uncertainty (management) Understanding of the safety envelope. Clarification of difference between design target and safety envelope. Involvement of regulator in both aspects? Regulatory requirements and safety envelope Verbalize concept of agreement between operator and regulator

International Atomic Energy Agency Subjects to tackle Term “initial state”  clarify, confusion on evolution of initial state - discuss. ‘Initial conditions’ Closure activities included to define initial state Get rid of “assumed initial state” Uncertainty on initial state due to transients

International Atomic Energy Agency

Helpful PRISM Outcomes of Task Group 4: Managing Uncertainties conducted by Roger Seitz were included into the PRISM report (chapter 9).

International Atomic Energy Agency Task 4: Managing Uncertainties Summary Roger Seitz 05 December 2012

International Atomic Energy Agency Rough Graphic for Types of Uncertainty

International Atomic Energy AgencyConclusions The need to address the performance of natural and engineered systems and policy/governmental status over long time-scales inevitably leads to complex uncertainties that pose challenges to decision-makers. Awareness is the first step towards managing uncertainties. Five general classes of uncertainties were identified: data/parameter, model, future/scenario, resources and contextual. The first three categories are site specific, quantifiable to differing degrees, and can be considered within a safety assessment. These uncertainties have to be considered in the design target/safety envelope. The last two are difficult to quantify and are more relevant at the Member State level and need to be considered when developing waste management policies and as part of project planning. These uncertainties can cause modifications/changes during the operation period.

International Atomic Energy AgencyOptions Confidence Building Use of Management Systems (LOOP) Involvement of Interested parties Discussion of Options Passive Safety (Safety Envelope) Defence in Depth Robustness (Safety Envelope) Scientific and Technical / Engineering Principles (Design Target) Understanding the Disposal System Monitoring (Design Target) Independent Peer Review Completeness of the Safety Case (update due to loop result) Traceability and Transparency Complementary Safety Indicators Multiple Lines of Reasoning Plans for Addressing Significant Unresolved Issues (Plan and implementation as relevant to Design Target/ Safety Envelope) Use of International Standards Managing Uncertainties Sensitivity Analysis Uncertainty Analysis Quality assurance/Quality control Communication of confidence building Site Characterization Expert judgment/elicitation Verification/Validation of Models Plume matching/assimilation Decision analysis (multi criteria and multi attribute, cost benefit) Waste acceptance criteria Laboratory experiments Reality check – simple calculation Demonstration analogues Alternative conceptual models Data estimation – inverse methods Alternative designs Balancing realism and conservativism Monitoring and surveillance Use of different types of models (probabilistic/deterministic) Safety Functions and FEPs Concept of reasonable assurance Documentation of assumptions (regulatory and resources)

International Atomic Energy Agency Subjects to tackle Term “initial state”  clarify, confusion on evolution of initial state - discuss. ‘Initial conditions’ Closure activities included to define initial state Get rid of “assumed initial state” Uncertainty on initial state due to transients

International Atomic Energy Agency

Not Helpful - Necessary Modifications Title Instead of preclosure safety please use operational safety Page 1, Capter It is not only the nuclear industry, which produces waste (MIR) Thousands of years may be the wrong order for long term safety Page 2, Chapter civil engineering works is not the challenge but mining activities Page 5 and 6 Handshake is misleading, propose to remove this term Example on page 6/7 number of possible defective packages undetected should be included into the Design Target This example is not a good one. Example on page 6 instead of “determines” influences or is an indicator delete “sorption” General: Terminology should be checked!!!

International Atomic Energy Agency