1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Modeled Load Levels in the Valley
Nacogdoches to Lufkin SS 345 kV Line Project
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Strategic Plan and Economic Upgrade Process
Presentation transcript:

1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

ELI-South Transmission Reliability Projects Amite-Fernwood: Upgrade line (2006 ISD) Bogue Chitto: Build 500kV SS, tap Daniel-McKnight to Bogalusa ( 2006 ISD) Coly-Hammond: Build 230kV line (2006 ISD) Improve ASI REVISED : Build lines -- Carryover Phase I - Conway-Panama (2005 ISD) Phase II- Panama-Frisco (2006 ISD) Hammond-Amite: Convert to 230kV (2006 ISD) Houma: Install Breakers (2005 ISD) NineMile: Replace Breakers (2004 ISD)

3 Amite South Area

4 The Amite South Import (ASI) has typically been approximately 2,100 MW during the summer operating season. When generation in the Amite South area is low, the Waterford–Willow Glen 500 kV line is usually the most severe contingency, thereby defining the ASI. The import calculation incorporates multiple operating guides, one of which assumes a potential increase (using Dynamic Line Rating (DLR) equipment) in the rating of the Conway–Bagatelle 230 kV line, under favorable system and weather conditions. Recent studies have shown that the Conway–Bagatelle line is the most limiting transmission line that establishes the ASI capability. The potential benefit from the use of DLR equipment on this line is no longer adequate to maintain ASI capability at appropriate levels. Recommended Solution: Build a new circuit from Conway to a new 230kV switching station (Panama) near Sunshine Substation. This circuit will be approximately 10 miles long and should be constructed using 1,780MCM ACSR conductor (1,605 Amps). The Panama switching station and a new line bay at Conway will have to be constructed. Estimated Total Cost: $13.4M ($1.59M for EGSI in 2004) ($8.66M for ELI in 2004) ASI Improvement Plan: Build Panama Switching Station & Conway-Panama 230kV Line

5 Panama

6 Bogalusa-Daniel-McKnight: Build Bogue Chitto Switching Station & 500kV Line Power transfers from the Entergy system are limited by the flow on the Franklin to McKnight 500kV line flowgate. Loss of this line causes the underlying transmission system, particularly the Little Gypsy to Madisonville 230kV line, to become overloaded. Recommended Solution: Build a 500kV switching station on the Daniel-McKnight 500kV line south of Bogalusa. Build two circuits of approximately 11 miles each to a point on the Bogalusa- Franklin 500kV line. Reconnect the system with the following arrangement: –Bogue Chitto - Daniel –Bogue Chitto - McKnight –Bogue Chitto - Bogalusa –Bogue Chitto - Franklin This arrangement redirects approximately 620MW of flow off of Franklin- McKnight, which in turn lowers the post-contingency flow on Gypsy - Madisonville by approximately 200MW. Estimated Cost: $50.5M ($400,000 in 2003 for engineering expenditures) ($6.23M 2004 for ROW) Bogalusa Daniel Franklin McKnight Bogue Chitto

7

8 Coly-Hammond: Build 230kV Line Entergy’s transmission system north of Lake Pontchartrain is primarily supported from the ELI 230kV system between Willow Glen and Waterford. Loss of the Franklin-McKnight 500kV line causes overloads on the underlying transmission system, primarily on the Gypsy-Madisonville 230kV line. Adding another 230kV source from a location north of Willow Glen reduces loading on the existing system and improves load serving capability north of Lake Pontchartrain and into south Mississippi. Recommended Solution: Build a 230kV line, approximately 24 miles, from Coly to Hammond. NOTE: This line cannot be connected until the Amite - Fernwood overload condition is resolved and until the Hammond-Amite line is converted. Estimated Cost: $19M –$400,000 in 2003 for engineering expenditures –$2.1M ELI, $2.5M EGSI in

9 COLY

10 Amite(ELI)-Fernwood(EMI) Line: Upgrade 115kV Line The Amite to Fernwood 115kV line, located in south Louisiana, north of Lake Pontchartrain, extending north into southern Mississippi is 32 miles long. The section of line from Amite Substation to the Mississippi state line is approximately 17 miles and the section from the state line to Fernwood Substation is approximately 15 miles. This 115kV line, constructed with 4/0 ACSR conductor, is part of the Amite to McComb tie between ELI and EMI. Single contingencies in Mississippi of Brookhaven-Mallalieu or Mallalieu-Norfield in 2004 will cause overloads up to 27% on the Amite- Kentwood-Colonial Pipeline-Fernwood line segments. Recommended Solution: Rebuild the line with 1,272MCM ACSR conductor to obtain a line rating of 261 MVA. NOTE: This project needs to be in place prior to the Hammond-Amite conversion and the Coly-Hammond 230kV line. Estimated Total Cost: $15M for ELI & EMI –$7.7M for ELI ($3.88M in 2004)

11

12 Hammond-Independence-Amite 115kV: Convert to 230kV The Hammond-Independence-Amite 115kV line, which is constructed for 230kV and operated at 115kV, is limited by the Hammond 230/115kV, 168MVA autotransformer and an 800Amp circuit breaker at Amite. This circuit overloads by 22% for a single contingency loss of Franklin-McKnight 500kV and by 18% for the loss of Bogalusa-Franklin 115kV line in Recommended Solution: Convert the Hammond-Independence-Amite 115kV line and the Independence 115kV substation to 230kV operation. Install a 230/115kV, 400MVA autotransformer at Amite and remove the autotransformer at Hammond. Estimated Cost: $7.4M ($150,000 in 2004)

13

14 Ninemile 230kV: Replace Circuit Breakers 2004 Mandatory: Safety - Replace kV circuit breakers at Ninemile Substation Total Cost: $1.55 M

15 Houma 115kV: Install 3 Breakers Houma Substation presently has a single 115 kV operating bus with no 115KV breakers. There has been frequent outages on the Chauvin – Houma – Ashland – Coteau 115kV line and the Houma – City of Houma 115KV line, causing this circuit to be one of ELI’s poorest performing lines. Recommended Solution: Install kV breakers along with associated bus and switches at the Houma Substation. NOTE: Entergy has obtained a signed contract with City of Houma to pay 1/3 of the total project cost. Estimated Cost: $1.22M for ELI ($610,000 in 2004) $610,000 for City of Houma

16

17 The Amite South Import (ASI) has typically been approximately 2,100 MW during the summer operating season. When generation in the Amite South area is low, the Waterford–Willow Glen 500 kV line is usually the most severe contingency, thereby defining the ASI. The import calculation incorporates multiple operating guides, one of which assumes a potential increase (using Dynamic Line Rating (DLR) equipment) in the rating of the Conway–Bagatelle 230 kV line, under favorable system and weather conditions. Recent studies have shown that the Conway–Bagatelle line is the most limiting transmission line that establishes the ASI capability. The potential benefit from the use of DLR equipment on this line is no longer adequate to maintain ASI capability at appropriate levels. Recommended Solution: Build a new 230kV circuit from Panama to Frisco This circuit will be approximately 20 miles long and should be constructed using 1,780MCM ACSR conductor (1,605 Amps). The ring bus at Panama switching station will have to be completed and a new line bay at Frisco will have to be constructed. Estimated Total Cost: $14M ($1.5M 2004 for ROW) ASI Improvement Plan - Phase II Build Panama -Frisco 230kV Line

18 Panama

19 Amite-Fernwood Carryover (2005 ISD) ELI-South Transmission Reliability Projects Bogue Chitto: Build 500kV SS, tap Daniel-McKnight to Bogalusa Carryover (2006 ISD) Improve ASI REVISED : Build lines -- Carryover Phase II - Panama-Frisco (2006 ISD) Coly-Hammond: Build 230kV line Carryover (2006 ISD) Hammond-Amite: Convert to 230kV Carryover (2006 ISD) Houma: Install 115kV Breakers Carryover (2006 ISD)

ELI Transmission Reliability Target Areas Belle Chasse-Alliance: Build Switching Station & 115kV Line

21

22 Questions