Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.

Slides:



Advertisements
Similar presentations
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
The Proposed Part 115 Rules and Waste Utilization East and West Michigan Chapters of the Air and Waste Management Association & The Environmental Law Section.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
Revisions to Washington’s Cleanup Rules Martha Hankins & Chance Asher Toxics Cleanup Program Department of Ecology Water Quality Partnership May 20, 2010.
Department of Army Permitting Process: Dredging
Environmental Regulation and Hydraulic Fracturing in California
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
London Convention Guidelines for Assessment of Dredged Material
Partnerships and Processes Landfill Redevelopment.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
IR Site 7 Sediment Remediation
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
Environmental Issues for Rural Communities STATE FUNDING AND TECHNICAL SUPPORT Sandy Karinen Cal/EPA Department of Toxic Substances Control Site Mitigation.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
June 20, 2001EPA Region 6 Corrective Action Conference1 Corrective Action Strategy in Arkansas Daniel Clanton Engineering Supervisor Arkansas Department.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Savannah Harbor Expansion Project
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
TRP Chapter Chapter 3.1 Regulatory approaches.
Plan Formulation for Deep Draft Harbors Navigation Measures.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
WELCOME! Public Scoping Meeting for the Proposed Designation of the “LA-3” Ocean Disposal Site July 21, 2003: Peter & Mary Muth Interpretive Center Newport.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Permitting Lessons Learned: How to Make the Most of Your Agency Partnerships October 15, 2008 Marla Harrison, Environmental Manager.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
BUILDING STRONG ® And Taking Care Of People! Southern California-Dredged Material Management Team (SC-DMMT): Origin History: o In place since approx. August.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Rick Moore, Hart Crowser
2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
JACKSONVILLE ODMDS DESIGNATION M. Rau, J. Seitz, C. Smith, N. Lombardero – ANAMAR Environmental Consulting, Inc. Chris McArthur – USEPA Region 4 P. Griffin,
Duluth-Superior Harbor Erie Pier: CDF to PRF Conversion Gene Clark, UW Sea Grant Dredging 2012 Conference San Diego, CA 10-22/
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Worldwide Small Port Survey and Analysis. Why? Initially, to determine the optimum TSV characteristics  Limited area  Data collection confined to TSV.
Hazardous Waste and Soil Landfill Disposal and Transport in QLD and Cross Border ACLCA – Australian Contaminated Land Consultants Association Date: 19/08/2015.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Transportation Projects City Council Workshop May 14, 2013.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Contamination What is it? Where does it come from? How does it affect us?
Department of Army Permitting Process: Dredging
Port of Hood River Recreation Committee Meeting April 2, 2007 By: Andrew Jansky, P.E. Flowing Solutions Images are property.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
Prepared by: Alex Fisch Planning Services Division.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
City of Clarksville Storm Water Management Manual Revisions 2014.
1 ICs at the WDI Superfund Site Brownfields 2004 St. Louis, MO Sarah Mueller U.S. Environmental Protection Agency Office of Regional Counsel Region 9,
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
SILVER LAKE, REHOBOTH AQUATIC HABITAT ENHANCEMENT PROJECT DNREC Division of Watershed Stewardship.
INNOVATIVE AND BENEFICIAL USE OF DREDGED MATERIAL
Middle Harbor Redevelopment: Third Party Fill Material
Parks and Recreation Commission
The Florida Inland Navigation District:
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Presentation transcript:

Middle Harbor Redevelopment Project WEDA Conference November 5, 2009

Existing Middle Harbor Terminals ●California United Terminals (CUT) 170-acre break- bulk/container terminal at Piers D and E on the north ●Long Beach Container Terminal (LBCT) 101-acre container terminal at Pier F on the south

Proposed Middle Harbor Terminal ●Consolidate two older facilities into one efficient, 345- acre rectangular- shaped terminal ●Construction will occur in multiple stages over a 10- year period

Dredging and Excavation ●Demolish existing Pier D & Pier E wharves ●Widen and deepen Slip 3 ●Construct rock containment dike ●Excavate portion of Pier F

Middle Harbor Fill Site ●Fill Pier E Extension, wedge fill, and portion of Slip 1 ●Complete fill of Slip 1 and portion of East Basin ●Connect Pier E terminal to Pier F terminal with a fill EAST BASIN

Project Timing ●Estimated to start in Spring 2010 ●Require approx. 4,800,000 cy of fill material ●Project will generate 2,200,000 cy ●Fills will accommodate an additional 2,600,000 cy from other Port and outside sources ●Window of opportunity for acceptance of third party fill material between late 2010 to mid 2012

Sediment Management Plan Goals ●Illustrate Port’s decision process for sediment management ●Define management priorities for contaminated and uncontaminated sediments ●Define procedures for the movement of sediment ●Guidance document for Port Engineering and Environmental Planning throughout the life of the project ●Living-document to be continually updated

Sediment Management Plan ●Components include a description of the project, a fill plan, priority of acceptance of third party material, and environmental controls to protect water quality

Nature of Fill Material The Port will NOT accept material that: 1.Constitutes “hazardous waste” as termed by USEPA or CA DTSC 2.Deemed unsuitable for confined aquatic disposal by USEPA 3.Has or will have land use restrictions or other requirements imposed by DTSC or other regulatory agencies

Third Party Fill Material Criteria Acceptance of third party fill material based on four criteria: 1. Schedule –Delivery timing relative to fill construction progress 2.Fill Composition –Chemical and geotechnical nature 3.Documentation –Required permits, insurance, licenses, & agreements (MOA) 4.Fill Source –Geographic source of material

Geographic Source Priority 1.From other elements of the project 2.From other POLB dredging projects 3.City of Long Beach material unsuitable for unconfined aquatic disposal 4.POLA remedial dredging projects material 5.City of Long Beach material suitable for unconfined aquatic disposal but cannot be beneficially re-used 6.POLA material unsuitable for unconfined aquatic disposal

Geographic Source Priority 7. Western Anchorage Sediment Storage and Disposal Site 8.From dredging projects within Los Angeles County unsuitable for unconfined aquatic disposal 9.From dredging projects outside Los Angeles County unsuitable for unconfined aquatic disposal 10.POLA dredging projects suitable for unconfined aquatic disposal but cannot be beneficially re-used 11.Sand borrow from within the Port of Long Beach

Tom Baldwin Sr. Program Manager (562) Matt Arms Sr. Environmental Specialist (562) Thank You Thank You For questions/comments please contact: