ABNORMAL OCCURENCE REPORTING: PURPOSE, USES, and PROCESS Angela R. McIntosh Abnormal Occurrences Coordinator Office of Federal and State Materials and.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Lander & Rogers Lawyers Australian Yachting Federation Risk Management A practical guide for clubs.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
SECURITY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS IN THE UNITED STATES.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
1 Management Review Board (MRB): Roles and Responsibilities for the OAS Liaison Richmond, Virginia August 22, 2011.
Licensing of Nuclear Power Plants in Pakistan
Brief History of Nuclear Regulation 1946 Atomic Energy Commission (AEC) by Congress. Strict control of nuclear materials used or produced in a reactor.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Introduction: The Role of Agencies
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Status of the U.S. Nuclear Regulatory Commission’s Initiatives on the Use of Cesium-137 Chloride Sources March 10, 2009 Regulatory Information Conference.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
NGA Federal Facilities Task Force Brief Update & Key Topics for Meeting May 16, 2002 Washington DC Jerry Boese Ross & Associates Environmental Consulting,
Radiation Regulatory Agencies: Keeping Them Straight Norman W. Henry III, MS,CIH.
1 Going From Good to Great: Cooperation, Collaboration, and Continual Learning Mark A. Satorius, Director Office of Federal and State Materials and Environmental.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
U.S. Nuclear Regulatory Commission: Proposed Tribal Policy Statement National Tribal Air Association February 26, 2015 Michelle Ryan, Intergovernmental.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
NRC and Agreement State Management of Consignments of Contaminated Products Angela R. McIntosh, Regional Coordinator Office of Federal and State Materials.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Licensing of a Potential Geologic Repository at Yucca Mountain Lawrence Kokajko, Director Division of High-Level Waste Repository Safety U.S. Nuclear Regulatory.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
10 CFR Part 37 Self-Assessment Retrospective Program Review to Ensure an Effective and Efficient Framework for the Security of Radioactive Material Organization.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
1 PRA Research to Enhance Decision-Making John Monninger, Deputy Director Division of Risk Analysis Office of Nuclear Regulatory Research, NRC.
MEDICAL WEBINARS: FEEDBACK and FUTURE PLANS Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC August 26, 2015.
Update on NRC Low-Level Waste (LLW) Program Activities.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
United States Nuclear Regulatory Commission Perspectives on Technical Support Organizations IAEA Meeting on TSO Challenges Aix-en-Provence, France April.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Online Radiation Safety Training Programs Tomas Herrera FSME/MSSA/Licensing Branch OAS Annual Meeting Milwaukee, Wisconsin August 27-30, 2012.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
THAILAND Training and Tutoring Feedback
NRC Update of Low Level Waste Emerging Issues
NRC’s Category 3 Source Security and Accountability Initiatives
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Update on Category 3 Source Security and Accountability Initiatives
UK Legal Requirement for Notification of Serious Breaches of Good Clinical Practice or The Trial Protocol John Poland, PhD Senior Director, Regulatory.
Branch Chief, Concerns Resolution Branch
U.S. Nuclear Regulatory Commission Radiation Safety Standards
LLW Forum Meeting October 17, 2017 Alexandria, Virginia
NRC’s Low-Level Radioactive Waste Program
Research and Test Reactor Safety: The Regulatory Perspective
National Environmental Policy Act of 1969 (NEPA)
Essentials of the legal environment today, 5e
Office of Waste Disposal Office of Environmental Management
Presentation transcript:

ABNORMAL OCCURENCE REPORTING: PURPOSE, USES, and PROCESS Angela R. McIntosh Abnormal Occurrences Coordinator Office of Federal and State Materials and Environmental Management Programs U.S. Nuclear Regulatory Commission Presentation to the Organization of Agreement States August 28, 2012

TOPICS Purpose and Uses for Abnormal Occurrence (AO) Reporting AO Agreement State Reporting Process AO Report to Congress Process AOs and NRC’s Agency Action Review Meeting Agreement State Reporting: Future Changes and Impact 2

AO REPORTING: PURPOSE and USES Federal Reports Elimination and Sunset Act of 1995 (Public Law ) Uses:  Tool for assessing adequacy of safety and regulations.  Tool for keeping public and Congress informed.  Tool for making discussion decisions at the Agency Action Review Meeting. 3

PROCESS: AO AGREEMENT STATE REPORTING Events reported to NRC in accordance with SA- 300, “Reporting Material Events.” NRC event review and potential AO identification NRC/Agreement State collaboration on AO determination/write up. 4

PROCESS: AO REPORT TO CONGRESS NRC AO Working Group. Draft AO paper to Commission. NUREG-0090, “Report to Congress on Abnormal Occurrences.” Nuclear Materials Events Database Update. 5

AGENCY ACTION REVIEW MEETING (AARM) Annual non-public meeting of senior NRC managers. AARM results briefed to the Commission in a public meeting. 6

AGENCY ACTION REVIEW MEETING (AARM) Generally, a significant event or record of poor safety or security history qualifies discussion of a licensee at the AARM. An AO (along with other criteria) may qualify a licensee for discussion. 7

CONTACTING AARM CANDIDATES The Agreement State regulator is contacted if an Agreement State licensee qualifies for discussion. NRC would not directly contact the Agreement State licensee, unless also an NRC licensee. 8

AARM CRITERIA The licensee has an event that results in NRC’s failure to meet a Strategic Outcome for Safety or Security in the NRC Strategic Plan (NUREG- 1614); or 9

AARM CRITERIA (continued) The licensee has an issue or event that results in:  An AO report to Congress, or  Disposition of the issue/event resulting in issuance of an NRC severity level I or II violation, or resolution via Alternative Dispute Resolution, or 10

AARM CRITERIA (continued)  A Level 3 or higher rating on the International Atomic Energy Agency’s International Nuclear Events Scale; and  The event/incident involves unique or unusual aspects that warrant additional oversight (e.g., inspection via an Incident Investigation Team or Augmented Inspection Team). 11

AARM CRITERIA (continued) A negative performance trend can also result in AARM review:  Multiple or repetitive significant issues resulting in an NRC severity Level I, II, or III violation, or disposition via alternate dispute resolution and  There are unique or unusual aspects of licensee’s performance that warrant additional oversight. 12

AGREEMENT STATE REPORTING: FUTURE CHANGES and IMPACT Proposed revisions to be published in Federal Register for comment (Sep/Oct/Nov 2012?) Anticipated impact: significantly reduced medical AO capturing and reporting. 13

AGREEMENT STATE REPORTING: FUTURE CHANGES and IMPACT Proposed change to AO Criteria I.C., “Theft, Diversion, or Loss of Licensed Material, or Sabotage or Security Breach.” Proposed change to AO Criteria III.C. “For Medical Licensees.”

QUESTIONS 14