Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1 +54MB2+50MB3+41MB4). Dubna: steady production ongoing. Plates for 34 MB1, 40 MB2, 39 MB3, 3 MB4 produced insofar (116 total). Time estimated to complete full production + spares march 2005 (as specified in the contract).
Status of Torino-Dubna Production Position Quality of strip production: stable since change of strip deposition head in august Plate MB1 n pixel = 0.106mm
Status of Torino-Dubna Production HV test performance of strip production: Plates which pass 1 st HV test 84% Last plate of the day left under HV test during the night, 10 hours. No extra bad plates found so far.
Status of MB4 Production Preparation Production of FE and HV SL frames ongoing in Torino. 20 MB4 HV side + 9 FE side frames produced.
Status of MB4 Production Preparation Plotter Y axis supports 99% ready for table installation. Completion expected by delivery of last part (rails protective tape fixations).
Status of MB4 Production Preparation Inflatable tube (2.5m, =7.5mm) Elastic rubber Commercial profile I beam tool drawings (P.Mereu) 12.7 mm ALCOA support OPEN CLOSED
Status of MB4 Production Preparation Final prototype executive drawings ready Torsion springs Rails Movable locating block
Status of MB4 Production Preparation Main Structure: Rohacell Sandwich Thickness 500mm Load 5000N
Status of MB4 Production Preparation