Adaptive Signal Control Technology: Bringing a Systems Approach to Implementation and Evaluation October 18, 2011 Kevin Fehon, P.E., PTOE DKS Associates.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

A Systems Approach To Training
Effective Contract Management Planning
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Identify Problems, Planning Objectives and Constraints.
Planning for Success: Applying Systems Engineering to ASCT Implementation TRANSPO 2012 October 29, 2012 Eddie Curtis, PE FHWA Office of Operations / Resource.
Chapter 1: An Overview of Program Evaluation Presenter: Stephanie Peterson.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Planning for Success: Applying Systems Engineering to ASCT Implementation MOITS – Traffic Signals Subcommitte National Capital Region Transportation Planning.
CEE 764 – Fall 2010 Topic 7 Special Issues on Signal Coordination.
Computational Methods for Management and Economics Carla Gomes Module 3 OR Modeling Approach.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Identify Problems, Planning Objectives and Constraints
1 Introduction to System Engineering G. Nacouzi ME 155B.
Rachal Roach Tim Hyder Chris Green
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
Why Student Perceptions Matter Rob Ramsdell, Co-founder April 2015.
Booz Allen Hamilton Inc. Performance Criteria For Professional Services Service Acquisition Center of Excellence Opening Ceremony Mike Cameron November.
Codex Guidelines for the Application of HACCP
Problems with reuse – Increased maintenance costs; lack of tool support; not-invented- here syndrome; creating, maintaining, and using a component library.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
Applied Transportation Analysis ITS Application SCATS.
Strategic Planning for the Research Department Linda Kitchel, Director of Research Millie Erichsen, Research Coordinator KSU Foundation, Manhattan, Kansas.
CMMI Course Summary CMMI course Module 9..
Strategic Planning for the Social Enterprise
Religious Moral and Philosophical Studies CPD Presentation.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Integrated Capability Maturity Model (CMMI)
Performance Measurement and Analysis for Health Organizations
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Conceptual Framework For Financial Reporting
ADAPTIVE SIGNAL CONTROL TECHNOLOGY MODEL SYSTEMS ENGINEERING DOCUMENTS 1 December 20, 2012.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
ADAPTIVE TRAFFIC SIGNAL CONTROL RICHARD W. DENNEY, JR. P.E. 1 December 15, 2011.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
SWEN 5130 Requirements Engineering 1 Dr Jim Helm SWEN 5130 Requirements Engineering Requirements Management Under the CMM.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
Purpose Goals Objectives Needs Focusing Curriculum Alignment Delivery to Student.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Behavior Control of Virtual Vehicle
Adaptive Signal Control Initiatives and Validation Program Presenters Edward Fok, FHWA Resource Center Transportation Technology Specialist Dr. Douglas.
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
CRITICAL THINKING AND THE NURSING PROCESS Entry Into Professional Nursing NRS 101.
NEW Regional Operations Guidelines Strategic Planning Flow Chart.
New Employee Induction Program
Run smoothly. Change quickly. Achieve more. Cloud-based enterprise work management software Resource Capacity Management Nadia Skira Implementation Consultant.
Highway Transportation Engineering ITS Case Study Component 3 – Instructor Guide.
Training and HRD Process Model
Continual Service Improvement Methods & Techniques.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
The Engineering Design Process
Digital Asset Management: Implementation Plan Anthony D. Smith Ocean Teacher Academy Training Course, 30 September - 4 October 2013, Mombasa, Kenya.
Meadowlands Adaptive Signal System for Traffic Reduction December 2011 Leo Almanzar P.E., P.P., P.T.O.E. Hong Yuan, P.E., P.T.O.E.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
CMMI Certification - By Global Certification Consultancy.
Stages of Research and Development
Discussion of CRVS strategies
Adaptive Signals & ALDOT
TSMO Program Plan Development
Critical Factors in Managing Technology
One ODOT: Positioned for the Future
Software Quality Engineering
The SWA Collaborative Behaviors
Advanced Management Control and Sustainable Development
What is Strategy and Why is it Important?
What is Strategy and Why is it Important?
Changing the Game The Logic Model
Presentation transcript:

Adaptive Signal Control Technology: Bringing a Systems Approach to Implementation and Evaluation October 18, 2011 Kevin Fehon, P.E., PTOE DKS Associates

Overview n The past 40 years of adaptive signal systems n The last five years in the USA n Breaking out in 2011 n Bringing a structure to system selection n Performance Evaluation 2

First a definition n ASCT – Adaptive Signal Control Technology u Terminology adopted by FHWA u Used to refer generically to adaptive traffic signal systems u Avoids confusion with ACS-Lite

The past 40 years n It all started with SCATS in 1973 and SCOOT in 1975 n Two fundamentally different but practically- oriented approaches n Both widely accepted outside the USA by 1985 n Different approach attempted in USA, reflecting different administrative and economic environment 4

5 SCOOT 2009

6 SCATS Cities; 179 Signal Regions

7 What has held up acceptance in the USA? n Agency capability and willingness n System performance and benefits n Lack of understanding n Cost n Availability of US-based systems

Growing acceptance in the USA. n ASCT is an important element of FHWA’s Every Day Counts (EDC) program n Increasing number of jurisdictions considering ASCT n Modern equipment with more processing power n New ASCT systems emerging n Still less than 1% of USA signals 8

US Adaptive Systems, April

Systems currently available in USA n SCOOT/TACTICS n SCATS n InSync n LADOT ATSC n ACS-Lite n OPAC n KHAdence n QuicTrac n RHODES n Balance n Synchro Green n RHODES n ATMS.now n Delcan & Intellight 10

Introducing a structured approach to ASCT system selection 11

What is an appropriate definition of “adaptive”? n Many different definitions are acceptable n The definition you choose should be the one that suits your circumstances n How do you define real-time? Is it predictive or reactive or both? n What parameters are “adaptive”? 12

What are you trying to achieve with ASCT?

Different coordination strategies n Most coordination strategies can be categorized in one of the following four ways: u Pipeline along a route (arterial or within grid) u Progression in two directions along a route u Equitable service for adjacent land uses u Queue management 14

Non-coordination strategies n Some adaptive strategies do not involve coordination u Optimal operation of an isolated intersection u Optimal operation of a single critical intersection within a coordinated area 15

Why use a systematic process?

Why SE? n Understanding the problem n Managing risk u Projects getting bogged down with shifting requirements u Acquisitions being challenged by unsuccessful bidders/proposers/vendors u Projects not meeting agency needs n (and it is mandatory for federal-aid projects)

Are you fully expressing your desires? n Is ASCT really what you need? n Can you clearly document the deficiencies of your existing system that you wish to overcome with adaptive? n Can you clearly document the existing capabilities of your system that must be retained with adaptive operation? 18

Can you clearly verify that you got what you asked for? n Are your needs clearly expressed? n Is each need translated into a requirement n Is every requirement actually satisfying an expressed need? n How is each requirement tested, so the that the vendor can verify it is satisified? 19

Can you validate that you got what you needed? n Have your organization’s goals and objectives been clearly defined? n Are measures of performance clearly defined? n Can you test the operation against the measures of performance? 20

What is the purpose of the Model Systems Engineering Documents?

Provide a framework to guide agencies to the most appropriate solution n Provide sample statements that can be used in a Concept of Operation n Provide sample requirements that can be used to select/purchase/design a system n Describe appropriate verification and validation plans 22

How should your process work?

Overview n First pass in half to one day, by experienced agency staff n Identify additional information you need in order to make appropriate decisions and document the basis of those decisions 24

Work Flow 25

26

What are the pitfalls of not following a structured approach?

Pitfalls n You don’t get the most suitable system n You may lose some capabilities n You may not get the system you want n Making a constraint a requirement at the outset distorts the outcome. You can’t quantify the trade-offs you are making 28

The structured approach will result in the most appropriate ASCT selection n Required capabilities will be clearly stated n Assumptions will be explicit, so requirements won’t fall through the cracks n Trade-offs to satisfy real and perceived constraints will be explicit and justified n Expectations are more likely to be met 29

Is it worth the effort? n Emphatically yes! n Some ASCT systems that have not fulfilled expectations are falling by the wayside n The established systems have strongly documented benefits and high B/C ratios n Much misinformation, both positive and negative 30

Gresham PM Peak TT (Eastbound Burnside) Travel Time (sec) 1997 Free 1998 TOD 2004 Free 2004 (1998 TOD) 2004 TOD 2007 (2004 TOD) 2007 SCATS Legend

Evaluation techniques often hide the truth n Travel time per direction does not show system- wide effects, and confuses positive and negative impacts. n Travel time per period do not show effects of varying demand levels. n Volume-weighted, system-wide evaluation allows differentiation of conditions. 32

Sunnyvale: System Expansion 33

Questions? 34