EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.

Slides:



Advertisements
Similar presentations
EPICS Collaboration Meeting Fall 2012, October 22 to 26, 2012, PAL Timing Solution for the TPS Project October 22, 2012 Chun-Yi Wu Instrumentation and.
Advertisements

The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Update of Control System Plans for the TPS C. Y. Wu, C.H. Kuo, Jenny Chen,
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
EPICS Collaboration Meeting, Hsinchu, Taiwan, June, 2011 NSLS-II Power Supply Control System Yuke Tian Accelerator Division Photon Science Directory Brookhaven.
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
DEVELOPMENT OF A READOUT SYSTEM FOR LARGE SCALE TIME OF FLIGHT SYSTEMS WITH PICOSECOND RESOLUTION Considerations and designs for a system of tdc’s with.
Aztec PC Scope Preliminary Design Review Fall 2006 Michael MasonJed Brown Andrew YoungsJosh Price.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
Power Supply Controller Architecture
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 TPS Timing System & Plan of Machine Protection System TPS Timing System & Plan of Machine.
High Speed Digital Systems Lab Spring 2008 Students: Jenia Kuksin Alexander Milys Instructor: Yossi Hipsh Midterm Presentation Winter 2008/2009.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
1Auger - North / October 2005 J-M.Brunet, S.Colonges, B.Courty, Y.Desplanches, L.Guglielmi, G.Tristram APC Laboratory – CNRS / IN2P3.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
National Synchrotron Radiation Research Center YS Wong, KB Liu (Team Leader) 2011/06/16 Quadrupole & Sextupole Magnet Power Supply of TPS (Taiwan Photon.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 pciGeneral PCI Device Support of EPICS which is used in TPS Control System Presented.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
CALIBRATION OF TEVATRON IONIZATION PROFILE MONITOR (IPM) FRONT END (FE) MODULES Moronkeji Bandele Physics and Engineering Department Benedict College,
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Update on the New Developments & Analysis from Hawaii Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab) University of Hawaii.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
TPS pulse magnet measurement
The Survey of the Power Supply Reliability at SSRF
RF acceleration and transverse damper systems
Beam-Synchronous Data Acquisition (BS-DAQ)
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
Injectors BLM system: PS Ring installation at EYETS
Development of Embedded EPICS on F3RP61-2L
Development of new power supplies for J-PARC MR upgrade
Table 1: The specification of the PSICM and the ePSICM Prototypes
Status of muon monitor R&D and construction
Analog and Digital Instruments
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Command and Data Handling
Rack installation and local tests for the MEBT Chopper Rack
Red Pitaya with EPICS Andraz Pozar EPICS Collaboration Meeting
Presentation transcript:

EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control Team NSRRC, Hsinchu, Taiwan

2 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Control interface of pulse magnets Development environment of PLC IOC PLC IOC prototype Timing solution of pulse magnet Summary Outline 2

3 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Consideration for Pulse Magnets and Its Controls In-house made. Assembly one-by-one. Test at laboratory after one unit is finished. Is 6U cPCI solution suitable for its control? One set control many pulsers (all ?) is feasible. It need assembly at the installation site which will be possible very late! => no good for manpower usage of control teams. => Manpower are precious resource. How about EPICS embedded in PLC might a better solution Items for consideration6U cPCIPLC EPICS IOC Small I/O countsNo cost effectiveYes Timing solutionEVRNO (at this moment) Interlock protectionPossibleGeneric EPICS supportsYES One-by-one assembly and testTediousSimple Final DecisionTiming OnlyOne set for one Pulser

4 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Pulse Magnet Control Interface TPS Control Ethernet Septum Power Supplies Kicker #1 Pulser Kicker #4 Pulser Scopes Pulse Magnet PS Timing Control, LTB/BTS Diagnostic EPICS IOC PLC-IOC Booster injection septum x 1 Booster injection kicker x 1 Booster extraction septum x 1 Booster extraction kicker x 1 Storage ring injection septum x 1 Storage ring injection kicker x 4 Storage ring pinger x 2 3 Hz Update Rate Event Receiver cPCI-EVR-300 Electrical/ Optical Fanout Peak Detector Module CPU board Total 11 Timing Network CompactPCI Crate

5 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 ItemSpecification CPUPower PC (MPC8347E, 533MHz) OSLinux (kernel ) Memory Flash ROM : 64MB DDR2 SDRAM : 128MB SRAM : 512KB USER SRAM : 4MB Interfaces Ethernet (100BASE-TX) 2ch RS-232C IEEE1394a Compact Flash card JTAG PCI Specifications of F3RP61-2L

6 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Boot loader : u-Boot Linux BSP for I/O modules of PLC Cross compiling environment EPICS driver/device support from KEK/J-PARC control team Software Components

7 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Cross Development environment of PLC IOC CF CARD Switch HUB Ethernet /opt/epics Cross compiler NFS Mount :/opt/epics/ on /opt/epics/ Linux installed Host PC Target F3RP61-2L (CPU module) Host PC environment: OS: Red Hat Enterprise Linux 5 (with kernel ) Target F3RP61-2L environment: OS: Linux (with kernel )

8 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Prototype of EPICS IOC on PLC Ethernet Embedded Linux + EPICS IOC For pulse magnet power supply control Pulse magnet power supply Power Supply F3PU10-0S CPU Module (Linux) F3RP61-2L EPICS IOC 16 bits Digital Input F3XD16-3F 16 bits Digital Output F3YC16-ON 8 ch, 16 bits Analog Input F3AD08-5R 8 ch, 16 bits Analog Output F3DA08-5X Spare

9 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 D-sub 25 pin(male) PS setting/reading D-sub 25 pin(female) PS on/off/status D-sub 25 pin(female) D-sub 15 pin(female) Peak current reading D-sub 15 pin(male) Current transformer Trigger input Reset input Peak current 3Hz sync (DI) Peak Detector Module PLC IOC Pulse Magnet PS Block Diagram of Pulse Magnet Control Pulse magnet current waveform Timing IOC Scope IOC Pulse Magnet

10 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Prototype EDM Page

11 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, sets of TPS Pulse Magnet PLC IOCs Pulse magnet power supply & Peak detector module AC Power

12 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 TPS timing system base on event system –Jitter (RMS) < 20 ps (cPCI6U-EVR-300) –Resolution : 8 ns –Width of pulse magnet power supply trigger : 2 μs Pulse magnet timing IOC provide –Pulse magnet trigger –Peak detector reset –PLC IOC 3Hz Sync trigger –Oscilloscope trigger Timing Solution

13 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Pulse Magnet Timing/Scope EPICS IOC Booster injection septum x 1 Booster injection kicker x 1 Booster extraction and storage ring injection septum x 1 Booster extraction kicker and storage ring pingersx 1 Storage ring injection kicker x 1 Booster injection septumx 1 Booster injection kickerx 1 Booster extraction septumx 1 Booster extraction kickerx 1 Storage ring injection septumx 1 Storage ring injection kickers x 4 Storage ring pinger magnets x 2 Oscilloscope trigger x 4 EPICS IOC ADLINK cPCI CPU EPICS Ethernet (10 Hz rate) EVR (CPCI6U-EVR-300) Fanout Module LTB/BTS IOC EVR (CPCI6U-EVR-300) Triggers: Oscilloscope (300 MHz, 1 GS/s): Timing Network

14 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 How to Prevent Spontaneous Discharge Trigger of Thyratron in TLS Injection Trigger (Top-up Injection) Prepared for injection 60 sec Kicker Capacitor High Voltage Spontaneous fired without trigger (due to cosmic ray or noise?) Measure Original kicker pulser charging power supply setting scheme Modified kicker pulser charging power supply setting scheme Discharge via the parallel discharge resistor

15 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Pulse Magnet Peak Current Reading Pulse magnet trigger unit Trigger Buffer Board Current Transformer Buffer Peak Detector Module Pulser Trigger Reset PLC IOC (DI) for ADC sync Peak Current (D-Type, PLC AI) Buffer Output (Diagnostic) Buffer Output (BNC, Oscilloscope) IOC Sync Trigger Reset Trigger

16 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Principle of Pulse Magnet Peak Current Reading Pulse magnet trigger(at injection beam) Current waveform of pulse magnet Peak detector module reset trigger(3Hz continue) PLC IOC sync trigger(3Hz continue) ms Peak Detector module output Miss fire Spontaneous fire ….

17 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Possible Diagnostic Measurements of Pulse Magnet Current amplitude variation (~ 0.1%) Trigger jitter (~ nsec) –Time-to digital converter –Oscilloscope => this solution seems better To detect Miss fire Spontaneous fire

18 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Summary 18 EPICS IOC embedded on PLC is more flexiable than using other PLC system. Performance of PLC IOC is sufficient for pulse magnet power supply control. Compact size. Easily for field test. Simple for maintenance. Possible applications of FA-M3R PLC IOC Simple EPICS IOCs Global interlock system Subsystem interlock Low I/O counts control

19 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Acknowledgments Jun-ichi Odagiri (KEK) Kazuro Furukawa (KEK) and KEK/J-PARC Control Teams

20 EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 Thanks for Your Attention! 20