Focal Plane Detectors and CCD Camera Roger Smith Steven Kahn DECam CD-1.

Slides:



Advertisements
Similar presentations
Advanced Information Systems Development (SD3043)
Advertisements

OFFICE OF THE CHIEF FINANCIAL OFFICER CFO What the heck is C-W-I-P and Why should I care?
ETSU Fall 2014 Enrollment Projections
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
1 ACS Status Update STScI TIPS Meeting 19-October-2006 Ken Sembach.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Optical Astronomy Imaging Chain: Telescopes & CCDs.
Mu2e WGM 6/15/2011 R. Ray Mu2e Project manager. Reviews We were on Lehman’s schedule for early August. We gave up that slot 2 weeks ago when it became.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Soft. Eng. II, Spr. 02Dr Driss Kettani, from I. Sommerville1 CSC-3325: Chapter 6 Title : The Software Quality Reading: I. Sommerville, Chap: 24.
DC Characterization of CCD-Based Detectors for Use in Multi-Chip Focal Plane Arrays SDW 2005 June 2005, R. PhilbrickBall Aerospace & Technologies Corp.
SDW2005, juin, Taormina The Corot Space instrument.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
West Contra Costa USD Presentation to the Facilities Subcommittee January 22, 2013.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Brenna Flaugher May 17, Technical Draft Recommendations 3.1Optics, Optical Corrector, Mechanical Systems 1.Augment the systems engineering effort.
Ch 181 Chapter 18 Electric Currents © 2002, B.J. Lieb.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
This chapter is extracted from Sommerville’s slides. Text book chapter
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
WFIRST 10  m Pixel Pitch Detector Considerations March 10, /10/
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Residential Duct Insulation New Deemed Measure Proposal – A Second Look Regional Technical Forum May 4 th, 2010.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Optimization of the EE 432 Class Fabrication Process May 07 – 16 Advisor/Client Professor Tuttle Team Members Jerome Helbert Leah Henze Ryan McDermott.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses Chapter 9 Capital Expenditure Decisions Maher, Stickney and Weil.
A Detector Upgrade for LDSS3 Mike Gladders Jacob Bean (on the phone) with Andreas Seifart, Josh Frieman, John Carlstrom.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
FourStar Status Eric Persson (OCIW) Presented By.
He3 dilution refrigerator
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Instructional and Information Technology Services The Technology Refresh Program.
Extended Detector Cutoff Considerations WFIRST Project Office May
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Task Force on National Greenhouse Gas Inventories IPCC Expert Meeting on HWP, Wetlands and Soil N 2 O October 2010, Geneva Taka Hiraishi, Co-chair,
DES Review CCD Focal Plane and Camera Roger Smith George Ricker.
Applied Quantitative Analysis and Practices LECTURE#19 By Dr. Osman Sadiq Paracha.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 7 External flow.
Free cooling on RTAF Chiller
Information Systems Week 14 Managing Projects.
Methods of multivariate analysis Ing. Jozef Palkovič, PhD.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Principal Investigator ESTCP Selection Meeting
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
INTRODUCTION : Convection: Heat transfer between a solid surface and a moving fluid is governed by the Newton’s cooling law: q = hA(Ts-Tɷ), where Ts is.
Progress on Acoustic Mode Damper design
Micro-channel Cooling
Principal Investigator ESTCP Selection Meeting
BDS Cryogenic System RDR Status and EDR Plans
Closing the Gap to Free Cooling in the Data Center
Power Semiconductor Losses
LSST Camera Detector Status
London Transforming Care – FTA Funding Proposal
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Focal Plane Detectors and CCD Camera Roger Smith Steven Kahn DECam CD-1

DECam CCDs Overview Comments: 1.There is every indication that the DECam CCDs will meet or exceed all specifications, and that the project has the competency and an appropriate plan to procure, test and integrate sufficient CCDs into the focal plane. …but some improvements will be suggested in final report. 2.Our single greatest concern is still the uncertainty in yield and its impact on budget and schedule. 3.Not withstanding the study undertaken since similar comments were made in an earlier review, we are not convinced that the expense and complexity of the proposed cooling system is required.

DECam CCDs ) Yield 20% yield is required to deliver the a fully populated focal plane on time (~5% slack). Overall yield is estimated to be between 19% and 29%, based on recent devices produced after remedying the latest round of problems. –This finding is based on too few devices to be considered a reliable predictor of future yield. Overall yield is the product of the yields for each manufacturing step. Some defects originate at DALSA. Losses occur during backside processing and frontside metalization at LBL. Devices are selected for packaging based on wafer probing at -45C by LBL. A small number of devices can be damaged during packaging and some could fail flatness tests. A significant number of devices are rejected due to performance deficits, principally cosmetic defects which do not freeze out at operating temperature (-100C). We feel that this “cosmetic yield” may be artificially depressed by the simple way in which the flow down from scientific requirements has been performed. Ample noise margin is needed in the electronics to assure that the CCD noise yield is not degraded.

DECam CCDs ) Yield (continued) Examples of how cosmetic specs may be relaxed: “Carbon trading”: specify cosmetic defects as an average across the entire focal plane rather than across a single detector. Allow increase in bad pixels/columns on some CCDs if others are better than the requirement. Determine how much of the image area is deemed to be lost due to a single bad pixel or columns versus a contiguous cluster. Does a single bad column count as 4 columns lost due to the width of the PSF? (Do two contiguous bad columns count as 5 lost.) Alternatively does the requirements flow down take into account the recovery of bad pixels by dithering? I.e. are bad columns like gaps between CCDs?

DECam CCDs Polar Axis Rotation Flex wrap hose Declination Axis, Flex wrap hose Flip Ring Rotation Flex wrap or swivel joint 3) Cooling system 1000L Reservoir, LN2 pump, 300 W Gifford McMahon GN2 condenser. (8kW power dissipation) LN2 Closed Loop Circulation System Rich Schmitt

DECam CCDs ) Cooling system A (mostly) closed cycle continuous flow cryostat is fed by long LN2 lines from a 1000L reservoir off-telescope where return gas is liquified by a 300W Gifford McMahon cooler dissipating 8kW. The DECam team estimates a thermal load of 40W at the cryostat, 30W in the LN2 transfer system and 30W in the remote, then allows another 100W safety margin. WBS Cooling & Purge Systems = $594,606 (FY8-10) Radiative transfer from window to CCDs, the dominant thermal load, was not discussed, nor was radiation shielding within the dewar shown. An independent estimate by Roger Smith indicates that the total load could vary between 25W and 65W depending on emissivity and shielding. A single Cryotiger can sink 35W at -120C for a few tens of k$ (capital only) and 0.5kW dissipation at the compressor. While we do not wish to micromanage the design, this example suggests that more work on this problem could save considerable funds, simplify the cooling system, and leave room to purchase ample spares.

DECam CCDs Recommendations 1.By CD-2 sufficient CCDs must have been fully tested to provide a more accurate yield projection, and enable the project to carry a smaller range of budget and schedule scenarios. Develop testing strategy for lot 2 2k x 2k and 2k x 4k devices in advance of CD-2, so as fully validate the assumed yield for both types of CCD. 2.By CD-2 develop more detailed plans for the fall back scenario in which some CCDs are replaced with better ones in Chile. 3.In both funding scenarios (1 & 2), maintain a steady pace in the manufacture, packaging and testing of CCDs. Ramp up to a pace which will fully engage the various participants ASAP and avoid interruptions to maximize yield. 4.Work with science team to develop a more sophisticated measure of performance yield. A formal process should be initiated to update the science requirements flow down, which should be under change control. 5.Continue to examine the options for a substantial simplification and cost saving in the cooling system. Obtain empirical data on radiative transfer from window to CCDs and the effectiveness of aggressive radiation shielding. Conduct an external review prior to CD2 to address this topic.