Eric Prebys, FNAL HB2012, Beijing, China.  Representing the Mu2e Collaboration  24 Institutions  ~120 Collaborators  This talk has direct contributions.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Ion Accelerator Complex for MEIC January 28, 2010.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
G. Velev 1/24/ Ferrite Tests for Mu2e Beam- Line Extinction Uses G. Velev Technical Division Magnet Systems Department.
WBS 2.08 Extinction Independent Design Review of Mu2e 5/3/11 Eric Prebys L3 Manager for Extinction.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
Basic Measurements: What do we want to measure? Prof. Robin D. Erbacher University of California, Davis References: R. Fernow, Introduction to Experimental.
ALPHA Storage Ring Indiana University Xiaoying Pang.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
10/24/2005Zelimir Djurcic-PANIC05-Santa Fe Zelimir Djurcic Physics Department Columbia University Backgrounds in Backgrounds in neutrino appearance signal.
A. Kurup, I. Puri, Y. Uchida, Y. Yap, Imperial College London, UK R. B. Appleby, S. Tygier, The University of Manchester and the Cockcroft Institute, UK.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Muons, Inc. AAC Feb M. A. C. Cummings 1 Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC.
Mu2e Extinction and Extinction Monitoring (2.09) Lehman CD-1 Review of Mu2e June 6-7, 2012 Eric.Prebys Extinction L3 Manager Dr. Smith: We’re doomed! Maureen:
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Irakli Chakaberia Final Examination April 28, 2014.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
Large Magnetic Calorimeters Anselmo Cervera Villanueva University of Geneva (Switzerland) in a Nufact Nufact04 (Osaka, 1/8/2004)
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Eric Prebys Accelerator Physics Center Fermilab *Very much a work in progress 7/24/09.
Eric Prebys Accelerator Physics Center Fermilab 7/30/09.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
Μ→e search using pulsed muon beam μ -  e - νν nuclear muon capture Muon Decay In Orbit  π - +(A,Z)→(A,Z-1)*, (A,Z-1)* →γ+(A,Z-1), γ→e + e - Prompt.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
COMET and DeeMe. Mu-e conversion search at J-PARC COMET Target sensitivity 10 C.L. using aluminum target – SINDRUM II 7x – MEG 2.4x
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Mu2e and Project X, September 3, 2008 E Prebys Background: Proton Economics in Project X Era* Assume  9mA*1ms = 5.3x10 13 protons/linac “blast”  Main.
Giovanni Onorato Fermilab University of Rome “Guglielmo Marconi” INFN Lecce Mu2e general presentation.
00 Cooler CSB Direct or Extra Photons in d+d  0 Andrew Bacher for the CSB Cooler Collaboration ECT Trento, June 2005.
1 Beam Extinction and Monitoring at the Upcoming Mu2e Experiment Ryan J. Hooper on behalf of the Mu2e Collaboration DPF 2015 August 5th, 2015.
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Frictional Cooling A.Caldwell MPI f. Physik, Munich FNAL
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
The physics of Mu2e Bertrand Echenard California Institute of Technology Mu2e computing review doc-db XXXXX.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The Mu2e Experiment at Fermilab Jim Miller Boston University for the Mu2e Collaboration.
Extinction Eric Prebys Mu2e Extinction Technical Design Review 2 November 2015.
The Mu2e experiment at Fermilab Finding a needle in a trillion haystacks Bertrand Echenard California Institute of Technology APS Meeting – April 2013.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Simulation of Extinction Channel Eric Prebys Mu2e Extinction Technical Design Review 2 November 2015.
The MiniBooNE Little Muon Counter Detector
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Large Booster and Collider Ring
The COMET Experiment Ajit Kurup, Imperial College London, on behalf of the COMET Collaboration. ABSTRACT The COherent Muon to Electron Transition (COMET)
NuSTORM - μ Storage Ring with Injection
I Alexander Nass for the JEDI collaboration
COherent Muon to Electron Transition (COMET)
Presentation transcript:

Eric Prebys, FNAL HB2012, Beijing, China

 Representing the Mu2e Collaboration  24 Institutions  ~120 Collaborators  This talk has direct contributions from  Alexander Drozhdin, FNAL  Andrei Gaponenko, FNAL  Carol Johnstone, FNAL  Vladimir Kashikhin, FNAL  Peter Kasper, FNAL  Sasha Makrarov, FNAL  Bill Molzon, UCI  Igor Rakhno, FNAL  Zhengyun You, UCI 9/20/12 Eric Prebys, HB2012 2

 Nearly all models beyond the Standard Model predict the interaction: 9/20/12 Eric Prebys, HB  105 MeV e -  If captured on the nucleus, a muon will have an enhanced probability of exchanging a virtual neutral particle  Could be a  or heavy boson.  Two body decay  mono-energetic electron!  Similar to  e  with important advantages:  No combinatorial background  Because the virtual particle can be a photon or heavy neutral boson, this reaction is sensitive to a broader range of BSM physics  Goal: measure with a single event sensitivity of <10 -16

 A proton beam will be used to create muons, which will be transported and captured on an Aluminum target.  Most backgrounds are prompt with respect to the parent protons, so a pulsed beam will be used.  Detection window will be after backgrounds have died away  Out of time protons would limit sensitivity and must be suppressed at the level (“Extinction”) 9/20/12 Eric Prebys, HB2012 4

 Production Target  Proton beam strikes target, producing mostly pions  Production Solenoid  Contains backwards pions/muons and reflects slow forward pions/muons  Transport Solenoid  Selects low momentum, negative muons  Capture Target, Detector, and Detector Solenoid  Capture muons on Aluminum target and wait for them to decay  Detector blind to ordinary (Michel) decays, with E≤½m  c 2  Optimized for E~m  c 2 9/20/12 Eric Prebys, HB2012 5

6 9/20/12 Booster Main Injector/Recycle r Delivery Ring (formerly pBar Debuncher) Mu2e  One Booster batch (4x10 12 protons) is injected into the Recycler.  It is divided into 4 bunches of each  These are extracted one at a time to the Delivery Ring Period = 1.7  sec  As a bunch circulates, it is resonantly extracted to produce the desired beam structure. Bunches of ~3x10 7 protons each Separated by 1.7  sec

 Extinction will be achieved in two phases:  In ring Beam delivery technique automatically gives good extinction < going into the Delivery Ring May degrade to during the spill  In beam line System of AC dipoles and collimators Factor of should be possible  Monitoring  Need to show that has been achieved 9/20/12 Eric Prebys, HB2012 7

 Start with < level of extinction going into the Delivery Ring, so the issue is how will it grow during the spill.  Effects considered  RF noise  Intrabeam scattering  Beam loading  Beam-gas interaction  Scattering off of extraction septum  Simulation still ongoing, but it looks like it should be possible to maintain a level of extinction. 9/20/12 Eric Prebys, HB2012 8

9 9/20/12  The proton delivery beam line will contain a system of resonant dipoles (“AC dipoles”) and collimators to eliminate out of time beam Delivery Ring Proton Beam Line Mu2e Experiment

Beam fully extinguished when deflection equals twice full admittance (A) amplitude At collimator: Angle to extinguish beam: Assumptions: Beam occupies entire admittance Beam line admittance is equal to the collimation channel’s admittance Resonant dipole that deflects out-of-time beam into a collimation system At dipole: 9/20/12 Eric Prebys, HB

9/20/12 Eric Prebys, HB Bend strength to extinguish: Stored Energy:  Large  x, long weak magnets - Assume  x =250m, L=6m - Factor of 4 better than  x =50m, L=2m

 Upstream of extinction dipole  Collimation to define beam line admittance to 50  -mm-mr  AC dipole region  Bend plane:  =250m  Non-bend plane: waist  Extinction collimation  Minimize transmission of scraping particles  Post-extinction  High dispersion region for momentum collimation. 9/20/12 Eric Prebys, HB

Of the options considered: ½ harmonic – (2/17) * 17/2 harmonic seems most promising Bunch length Transmission window 13 Eric Prebys, HB2012 9/20/12

 Transmission efficiency was simulated with more realistic bunch shapes  Harmonic number and amplitude of high frequency component was varied  This study produced in the final parameters for the two harmonic system 9/20/12 Eric Prebys, HB Beam motion in Collimator Transmission Window Bunch

 1.5m prototype has built and tested  Successfully operated at both frequencies  Plan is to build final system out of identical 1m segments Eric Prebys, HB Gap Cooling channel Conductor Ferrite *Design by Sasha Makarov and Vladimir Kashikhin 9/20/12

 The extinction beam line was simulated using STRUCT and MARS* 9/20/12 Eric Prebys, HB Time (ns) Extinction Region Collimator Material: Extinction < 5x10 -8 over range of interest for optimized collimators This is multiplied by the Delivery Ring factor to produce a total extinction of < 5x *I. Rakhno

 Demonstrate extinction  Assume ≈ 3 x 10 7 protons/bunch  Not possible measure with a single bunch  Integrate over many bunches  Integration time should be < ≈ 1 hour  Only protons hitting the target can cause backgrounds  Monitoring beam itself will lead to a potentially large over estimate of the background to the experiment   Monitor target interaction product and integrate a statistical profile of out of time beam. 17 Eric Prebys, HB2012 9/20/12

 Filter  Selects a sample of suitable secondaries and delivers them to the detector  Sets the per proton detector signal rate  Shields the detector from unwanted interaction products  Detector  Measure “in-time” and “out-of-time” signal rates with equal or known relative efficiency  Must have LOW “out-of-time” backgrounds compared to signal rate 18 Eric Prebys, HB2012 9/20/12

 Pixel Tracker  Located above and behind the proton absorber  Samples 3 to 4 GeV/c positive charged secondaries  Pixel detectors reconstruct and count straight tracks with a well defined direction in 25ns time bins  Mini Spectrometer  Located beside the proton absorber  Samples ~ 1 GeV/c positive charged secondaries  Magnetic spectrometer with 4 scintillator stations measures dE/dx, time of flight, and momentum of identified particle tracks 9/20/12 Eric Prebys, HB

 Signal Rate  Determined from beam intensity 3 x 10 7 protons/bunch Bunch rate: % duty factor  2 x in-time p.o.t./hr extinction  2 x 10 6 out-of-time p.o.t./hr  To set a 90% C.L. Need 2.3 expected out-of-time signal/hr  1.2 x signal events per p.o.t.  Background  << 1 event/hr  Both approaches seem to satisfy these requirements  Down selection committee formed.  Recommendation in November 9/20/12 Eric Prebys, HB

 In ring extinction  Complete calculations and simulations to determine the likely level of out of time beam.  Work in mitigation, such as in ring momentum collimation, if it’s insufficient.  Beam line extinction  Magnet design appears sound  Continue modeling effort to optimize collimation design.  Monitoring  Down select between two precision monitor options  Develop fast monitor to measure extinction at the level monitor beam coming out of the ring before the AC dipole Hope to combine with precision intensity measurement for slow extraction feedback. 9/20/12 Eric Prebys, HB

9/20/12 Eric Prebys, HB

 Extinction and extinction monitoring are a critical part of the Mu2e schedule  We have developed a plan for beam line extinction and have two apparently viable options for precision monitoring  More analysis is required to determine what, if any, further mitigation will be required in Delivery Ring to achieve the required level of extinction. 9/20/12 Eric Prebys, HB