Hard Chrome Replacement NADEP Jacksonville February, 2002 Michael Linn Materials Engineering.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Advertisements

Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
MOLY BLACK GOLD 10 Times the Lubricity of Oil.
Non-Line of Sight Hard Chrome Alternatives Project April 2001 Joe Kolek AFRL/MLQL (937)
Engine Service. Cylinder heads ä ä 1. Clean ä ä 2. Check for Cracks inspect exhaust port and in between valves ä ä 3. Check for Warpage ä ä 4. Inspect.
Aerospace Use Of Hexavalent Chromium And Soluble Nickel In Relation To REACh 7th October 2009 From a combined Goodrich and Rolls-Royce review of the implications.
WC HVOF Advantages Over Chrome Electroplating Matt Leahey RPI: Master’s Project Fall 2009.
The Portland Street Building Back to “Select a building” Back to “Select a building” NatVent Presentation of the building Presentation of the building.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
PPAP Requirements Training
Keith Legg Hydrogen Embrittlement Testing HCAT Program Review Cocoa Beach, Fl December 2000.
File Name & Location 12/05/2015, Page 1 STATUS OF F/A - 18 E/F NLG RIG TESTING.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist United States Air Force Airborne Accessories Directorate Avionics and.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
SURFACE ENGINEERING (2)
HCAT PROGRESS REPORT FEBRUARY 2002 GOODRICH LANDING GEAR HCAT STATUS CONDUCTING THREE FULL SCALE TESTS: 1. Fatigue of entire MLG - Dash-8 Series
Cost/Benefit Analysis Conducted at Landing Gear Repair Facility Analysis conducted by Concurrent Technologies Corporation using Environmental Cost Accounting.
Navy Landing Gear Perspective Tribaloy-Treated F/A-18C/D
Atmospheric Corrosion Testing Comparison of Electrodeposited Hard Chrome to HVOF WC/17Co and Tribaloy 400 Three-Year Atmospheric Exposure Exposures Conducted.
PUMP CONDITION EVALUATION. BEARINGS PUMP SHAFT BEARING FRAME REAR COVER IMPELLER PUMP CASE.
OC-ALC Chrome Plate Reduction 20 FEB 2002 OKLAHOMA CITY AIR LOGISTICS CENTER Johnny Tsiao OC-ALC/LPARR (405) I n t e.
3 LDC borstplätering LDC Portable Electroplating 1.Cold process: Used at room temperature, no stress or adjustments because.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Project Status as of 1 April 2003
1 CHROMIUM PLATING REPLACEMENT AT SIKORSKY AIRCRAFT ROBERT GUILLEMETTE JOHN BARTALOTTA MATERIALS AND PROCESSES ENGINEERING APRIL 26, 2001.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING April 2001 Long Beach,
Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.
GENERAL MOTORS Day Three Introduction to Thermal Spray.
Corrosion Testing Acknowledgements to:
2010 PWCS Symposium Presentation PRESENTATION BY MIKE GARSKE, JOHN GIGLIO.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING August 2001 Toronto,
Physical Metallurgy Design alloys for aircraft engine.
20 June 2013 Prague, Czech Republic Russell Kemp Atlanta, Georgia USA Advances in US Lead Producer Emission Controls.
Jeff Moorman Hydraulic Systems and Flight Control Actuators (301) Navy Rod Seal Testing Project Status as of 1 Sept 2002 Results from Rod Seal.
Tribo-Mechanical Evaluations of HIPed Thermal Spray Cermet Coatings V. StoicaHeriot-Watt University, UK Rehan Ahmed Heriot Watt University, UK T. ItsukaichiFujimi.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING 1-2 April 2003 San Diego,
TESTING STANDARDIZATION Standardization of Testing and Process Evaluation John P. Sauer SAUER ENGINEERING December 13, 2000.
© 2012 Delmar, Cengage Learning Manual Transmission Diagnosis and Repair Chapter 72.
MFW Pump Discharge Check Valve OE Follow Up Dominion North Anna Power Station Gary W. Liffick FW System Engineer FSRUG, Feb 21-24, 2011.
ORENDA AEROSPACE CORPORATION PROGRESS REVIEW MEETING THE CANADIAN HARD CHROME ALTERNATIVES TEAM (HCAT) JOINT PROGRAM HVOF PROCESS DEVELOPMENT, EVALUATION.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
SERVICING CLUTCHES l Chapter 3 l Page 49 l Lab manual l Page 45 l Classroom Manual.
Ogden Air Logistics Center Innovation & Excellence HVOF On-Going engineering Hill AFB –WC-17Co on 300M steel Summary of A-10 bend tests Compressive.
Keith Legg Overview of fatigue/spalling tests HCAT Program Review Long Beach April 2001.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.
Clutches.
Status of AFRL characterization of Thermal Sprays for Engine Applications April 2, 2003 Robert Ware (937) Air Force Research Laboratory Susan.
Keith Legg Clean Dry-Coating Technology for ID Chrome Replacement SERDP Project # 1151 HCAT Program Review Long Beach April 2001.
Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.
Mechanical Workshop FIRST Mid Atlantic Region January 2016.
Keith Legg Plasma spray ID coatings HCAT Program Review August 2001 Toronto.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
Clutches Basic purpose Used to disengage engine from input shaft Flywheel –Bolted to crankshaft –Provides surface for clutch disc to work on Clutch disc.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING September 2002 Toronto,
So, I Failed My OBD Inspection! Now What? Or, What is GCAF going to do for ME? (my tag is due tomorrow!), Or I believe in clean air BUT I need to register.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Metal Spray Coating Section Metal Spray Shop Arc Spray Equipment Arc Wire Arc wire brings the operational simplicity and portability of MIG welding.
Introduction & History
Sun City Lift Station Odor Control Improvements
FRCSW Cold Spray Applications Presented by Conrad Macy
What are the Common Engine Oil Leak Locations
MAINTENEANCE AND REPAIR OF STARTING SYSTEMS
RV Safety Alarms Education Test
Start....
AutoWorksTM Friction Free 3000
Presentation transcript:

Hard Chrome Replacement NADEP Jacksonville February, 2002 Michael Linn Materials Engineering

ARI POA&M –Develop fixturing/masking including drawings Complete –Prototype HVOF repairs Complete Complete –Perform 50 hour engine test cell endurance run Complete –Visually and dimensionally evaluate coatings after engine test Complete –Update repair manuals Complete –Air Force Approval Complete –Install new Multi-Coat Cell HVOF Complete –Implement repairs Complete Hard Chrome Replacement TF34 Affordable Readiness Initiative

Identified Parts / Replacement Coating Hard Chrome Replacement TF34 Affordable Readiness Initiative - Highlighted parts have been prototyped and installed in test engine. Parts Currently in production at NADEP Jacksonville

Production Status –100% of fixturing/masking completed including drawings –Gained AF approval –New Multi-coat cell is complete –Approximate Number of Parts Processed by Production: 50 Axis B Bevel Gears 30 B-Sump Housing & # 6, #7 Bearing Housings 20 # 5, 6, & 7 Carbon seal runners 5 Years processing # 3 Bearing Housing (APS T800) Hard Chrome Replacement TF34 Navy & Air Force Engines

TF34 Axis-B Bevel Gearshaft P/N 6008T48P01 S/N HPC T800 HVOF Diamalloy 3001 After 50 hr. engine run

TF34 B-Sump Housing P/N 6018T02G03 S/N GGM00204 T800 Plasma Spray Metco 68F-NS After 50 hr. engine run

TF34 HPC Rear Shaft P/N 6016T83P01 S/N GAT 17106T800 T800 HVOF Diamalloy 3001 After 50hr. engine run

TF34 No. 5 Carbon Seal Runner P/N 4019T60G01 HVOF Tungsten Carbide/Cobalt Diamalloy /17 After 50 hr. engine run

TF34 No. 6 Carbon Seal Runner P/N 4020T02G02 S/N BJW HVOF Tungsten Carbide/Cobalt Diamalloy (WC/Co 83/17 After 50 hr. engine run

TF34 No. 7 Carbon Seal Runner after 50 hr. engine run Note minute flat-line chatter marks from grinding operation with corresponding wear marks from mating part

Status of New HVOF Cell at NADEP JAX Specification for HVOF Cell Complete Contract Award - March 29, 2000 Complete Natural Gas Line Stubbed-out at Service Pad Complete Blast cabinets for Cell #7 Installed & Operational Complete Sound-proof enclosed room Complete Exhaust plenum & Air Handling System Complete FANUC 5-Axis Robot System for Cell #7 Complete Multi-Coat Process Control Unit Installed Complete System functional checks Complete HVOF as a Hard Chrome Replacement

Multi-Coat Cell #7 “Teach Pen”Process Controller Powder Feeder

Multi-Coat Cell #7 NADEP Jacksonville Witness Specimens TF-34 Bevel Gear Fanuc 5 Axis Robot Sulzer Metco Hybrid Diamond Jet Exhaust plenum

Conclusion NADEP Jacksonville now Chrome free on TF-34, F 404, F414, F1D2 NADEP Jacksonville has 3 J-52 parts remaining to be Chrome free on all engines - Rear Compressor Drive Turbine Shaft #5 Bearing Journal - No. 4 Bearing Housing - Spur Gear shaft

J52 Rear Compressor Drive Turbine Shaft One of 3 remaining Cr Plated Engine Parts, NADEP Jax Prototype Produced in June, Approval Pending

Development of Navy Position JOAP Concern regarding replacement of Cr:Once Cr is replaced, should the JOAP Program add an element (W or Co) as a replacement for Wear Metal Analysis ? Assumption: The JOAP program currently uses [Cr] to indicate wear on Cr Plated Wear Surfaces; [Cr] used to indicate potential failures. - Data from 47,770 JOAP Samples:

Development of Navy Position JOAP Data from 47,770 J-52 JOAP Samples indicates: 2 engines were removed for high Cr (8-9PPM) without the presence of high Fe. Those engines were (A-6) and (A-4 Aircraft). Engine was closely monitored around June, 1995 and was returned to normal after the Cr failed to increase. NAVAIR Site Jacksonville Materials Engineering position: No evidence that Cr by itself provides utility for JOAP, at least not for the J-52. Cr Data provided to FST for final determination.