Greenlight Project Evaluation Community and Place Division Nikit Nain Presenter.

Slides:



Advertisements
Similar presentations
Putting the Pieces Together to Achieve Sustainability Cindy Carlsson Minnesota Department of Transportation March 1, 2011.
Advertisements

1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
ODOTs District-wide School Travel Plan Process Columbus Public Schools Discussion May 16, 2012 SafeRoutesToSchool.
The California Pedestrian Safety Assessments Program ITE Western Conference June 26, 2012 Matt Benjamin, Associate Fehr & Peers
An Overview of the Complete Streets Concept and a Review of NCDOT’s Proposed Complete Streets Guidelines PHC COMPLETE STREETS.
1 © 1999 Deloitte Consulting Infrastructure Sub-processes In Scope – Plan and Manage Business.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Pedestrian Responsive Signal Timing Strategies Oregon ITE Winter Workshop February 26 th, 2015 Sirisha Kothuri, Chris Monsere, Andy Kading - PSU Peter.
Type Name Here Technical Program Services Eduardo C. Serafin, PE, AICP.
Sidewalk Strategic Plan City of Peterborough. About Peterborough  Pop. 75,000  Surrounding land is agricultural with Canadian Shield just to the north.
Going Grey in Mississauga Evaluating the Older Adult Plan using Quality of Life as a Measure of Success.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
80 th and Foster Intersection Analysis Kevin Hace Chris Hass Matt Palmer CE 410/510: Bicycle and Pedestrian Engineering Design.
Office for Planning, Strategy and Coordination Victorian Child and Adolescent Monitoring System Victorian Child and Adolescent Monitoring System Joyce.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Endeavors in Transportation Health Impact Assessment LCDR Joseph Ralph, MPH, CHES Healthy Community Design Initiative June 2015 National Center for Environmental.
Standard 5: Patient Identification and Procedure Matching Nicola Dunbar, Accrediting Agencies Surveyor Workshop, 10 July 2012.
In partnership with: FHWA PedSafe: The San Francisco MTA/UC Berkeley Pedestrian Safety Program Frank Markowitz SF Municipal Transportation Agency David.
2015 Traffic Signals 101 Topic 7 Field Operations.
Lesson 2.2 Traffic Signals  Today’s Objectives: 1. Explain what to do at a green, yellow, and red light. 2. Describe the action to take when you approach.
INTEGRATION OF ACTIVE TRANSPORT AND ROAD SAFETY FOR CHILDREN Road Safety Education Workshop Friday 19 October 2007.
Out of ‘ Site,’ Out of Mind Increasing Community Connectivity and Physical Activity through Healthy School Site Planning.
Enterprise Risk Management (ERM) Minnesota Department of Transportation Enterprise Risk Management (ERM) Minnesota Department of Transportation TRB International.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
HSTP PLAN DEVELOPMENT Skagit-Island Human Services Transportation Plan July 10, 2014.
2010 Wisconsin Safe Routes to School Funding SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
The Green Cross Code is a set of steps to help you cross the road. Remembering the Green Cross Code when you cross the road will help you get to the other.
Dominique Poulin Environmental Health First Nations and Inuit Health Branch Health Canada Health Canada’s Implementation of the Drinking Water Safety Program:
CHILDHOOD INJURY PREVENTION CONFERENCE Environmental Task Forces Russell Smith Program Advisor, FedEx Global Citizenship 2.
Introduction to TIDE Cluster 2: Non-motorised Transport TIDE Final Conference Barcelona, September 2015 Bernard Gyergyay Rupprecht Consult.
Client-Centred Service Delivery John A. Macintyre Director, Parks and Recreation.
4 th - 18 November 2011 ICIUM 2011 Conference Antalya, Turkey 16/10/2015.
Welcome to the road safety quiz, click on the start button to begin.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
Modifying pedestrian behaviour 學生:董瑩蟬. Purpose This paper investigated the traffic signal add timer which effect pedestrian crossing behavior or not.
Crossing the Complete Street Presentation for the Sacramento Complete Streets Workshop July 10, 2009 Meghan F. Mitman, AICP Fehr & Peers Transportation.
Safety Self-Assessments Assessing opportunities to improve Workers’ Compensation best practices within an organization.
Countdown Pedestrian Signals Presentation by Jack Fleck, City/County of San Francisco February 28, 2006.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
“E” VALUATION Presented by Terry Preston Safe Routes Project Manager WALKSacramento Alexis Kelso Safe Routes Project Coordinator WALKSacramento.
E MESE MAKÓ, PhD Associate professor Department of Transport Infrastructure Szechenyi Istvan University, Gyor, Hungary Evaluation of Human.
1 Road Safety Education Cambodia Safe School Zone September, 2010 By: Taing Koungveng.
APA, Planning, and Health Anna Ricklin, AICP Manager, Planning and Community Health Center.
Hazelwood/I-94 Bridge Presentation by the District 1 Community Council for the City of Saint Paul Presentation by the District 1 Community Council for.
Traffic Safety. WHY ARE WE HERE To keep children safe around our schools What we will be discussing –Driving safely in and around Schools –Bicycle safety.
Improvements to Ruth Street/I-94 Bridge Presentation by the District 1 Community Council for the City of Saint Paul Presentation by the District 1 Community.
Intelligent pedestrians- waiting for intelligent signals? Kathleen Kemp October 2015 John Bartels, Kate Sayeg, Meg Selman David Nash, Traffinity Malcolm.
INDONESIA INFRASTRUCTURE INITIATIVE IndII T Integrated Urban Road Safety Program (IURSP) Community Consultation Greg Rowe VicRoads International.
Community Crosswalk Program. - Community crosswalk volunteers play an important role in the lives of children who walk or bicycle to school by helping.
Grantee Perception Reports Prepared for Human Dignity Foundation December 2015.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Training of Process Facilitators 1- Training of Process Facilitators 5-1.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Ch. 10: Negotiating Intersections
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
Making it easier & safer to walk Greenlight for walkers
Road Safety Audit Findings
* Topic 7 Field Operations
Effects of Countdown Traffic Signal On Driving
Paper by Marion Sinclair and Gladwin Dennysen.
Governor’s Advisory Council on Connected and Automated Vehicles Traffic Regulations & Subcommittee Col. Matt Langer, Liaison.
Developing a Pedestrian -Bicycle Safety Action Plan
School of Civil Engineering
Making it easier & safer to walk Greenlight for walkers
The Use Of Hard Shoulders As A Turning Lane: A Safety Evaluation
Project Location: 35th Ave HSIP8
Presentation transcript:

Greenlight Project Evaluation Community and Place Division Nikit Nain Presenter

Scope of Greenlight Project

Changes to Signal Operation Late introduction of green man Auto introduction Increased clearance time PUFFIN (Pedestrian User Friendly Intelligent) Total cost of treatments $171,500

Challenges Scarce number of sites per treatment type Extended gap between pre and post intercept surveys Changes in land uses, population and demographics Direct information on near misses not captured Lack of international research or similar studies

Late introduction of green man Improved safety –Instances of crossing on the ‘red man’ have reduced by 16% –A 21% increase in feelings of increased safety More comfortable crossing speed –0.09 metres/second decrease in average crossing speeds Increased wait time with less frequent phases –waiting time has increased by 1.8 seconds Average cost per site $2,500

No improvement to safety –Instances of crossing on the ‘red man’ have reduced by 1% –There has been a significant decrease (24%) in the proportion of respondents who feel safe at these intersections More comfortable crossing speed –0.03 metres/second decrease in average crossing speeds Increased wait time with less frequent phases –waiting time has decreased by 0.2 seconds Average cost per site $1,400 Auto introduction ?

Increased clearance time Improved safety –Instances of crossing against the ‘red man’ decreased by 2% –A 24% increase in feelings of increased safety. More comfortable crossing speed –0.03metres/second decrease in average pedestrian crossing speeds. Average cost per site $2,300

PUFFIN Improved safety –Instances of crossing against the ‘red man’ decreased by 12% More comfortable crossing speed –0.03 metres/second decrease in average pedestrian crossing speeds. Increased wait time with less frequent phases –waiting time has increased by 5.5 seconds (the largest of all increases in wait times) Average cost per site $30,000 ?

Overall findings There is a significant effect of an increase in flashing red man ‘clearance time’ on decreasing the average walking speed of pedestrians. The Greenlight treatments have led to an overall decrease in the number of people entering the crossings during the ‘red man’.

Recommendations Treatment TypeKey Recommendation Late introduction of green man Approach VicRoads to make this treatment type standard, for existing and proposed sites, in all areas of pedestrian priority. Auto Introduction Consider international context including expected benefits and revisit analysis Increased Clearance Time As for ‘Late introduction of green man’ PUFFINRequest VicRoads to balance ped wait times and provide regular crossing opportunities.

Next steps for DOT Work with VicRoads to convert these findings into revised policies and procedures to be applied at all signal sites within areas of pedestrian priority Share the key findings of the Greenlight study with Councils, VicRoads, DPCD, DEECD and other divisions within DOT