Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Low-flow Showerheads for Residential and Select Commercial Applications Danielle Gidding.

Slides:



Advertisements
Similar presentations
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Advertisements

Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
Transformer De-Energizing & Dairy Plate Heat Exchanger Standard Protocol Proposal Presentation to the RTF February 20, 2013.
1 Deemed Savings for Hot Water Savings Measures in Multifamily Buildings Showerheads Faucet Aerators Pipe Wrap Tank Wrap.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
D EEMED M EASURE U PDATES June 1, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Savings of Specialty CFLs and LED Downlights Danielle Gidding Bonneville Power Administration.
Prepared for Enterprise Community Partners. Enterprise Community Partners | 2GREEN & HEALTHY LIVING: Water Conservation What Uses The Most Water? Faucets,
Thermostatic Shower Restriction Valve UES Measure Ryan Firestone Regional Technical Forum 7/21/2015.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N DRAFT: Methods for Evaluating Residential Behavior-based Programs RTF Presentation February 2,
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
C OMMERCIAL S HOWERHEAD M ETERING S TUDY April 5, 2011 Regional Technical Forum Presented by: Michael Baker SBW Consulting, Inc.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Circulating Block Heater Alfredo Gutierrez Cal TF Work Paper Presentation October 23, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Thermostatic Shower Restriction Valve –Measure Screening Results New Measure Proposal February 19th, 2014.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF October 4, 2011.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
Heat Pump Water Heater Request for Feedback on a proposal to add UES measures with a “Retail – any installation location” delivery mechanism Regional Technical.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Small / Rural Subcommittee Tuesday, June 11, 9am – 10:30am.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy Savings from Electric Water Heaters in Commercial Applications Danielle Gidding.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Extension of Provisionally Deemed Smart Strip in Commercial Applications RTF March 2,
High Efficiency Evaporator Coils for Medium Temperature Cases Dustin Bailey, Engineer PECI Jan 5, 2010.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
RTF Residential Lighting Subcommittee Tuesday, March 4, 11am – 12:30pm 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Northwest Power and Conservation Council Pre-Rinse Spray Valves RTF January 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
D EEMED M EASURE U PDATES May 3, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Dishwashers Danielle Gidding Bonneville Power Administration.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Exterior LED Area Lights
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Commercial Showerhead Research Plan RTF April 6 th, 2010 Danielle Gidding.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Single Family New Construction Measure: Slab Insulation Mohit Singh-Chhabra Regional Technical Forum April 19 th, 2016.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Prepared for Enterprise Community Partners
Web-Enabled Thermostats
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Low-flow Showerheads for Residential and Select Commercial Applications Danielle Gidding Bonneville Power Administration Ryan Firestone Navigant Consulting February 2, 2010

Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Purpose Approval of low-flow showerheads: Flow-rates –2.0 gpm –1.75 gpm –1.5 gpm Sectors –Residential –Commercial Hospitality Health Care Small Commercial with Employee Shower Delivery Mechanisms –Direct Install –Retail and Mail-by-Request (Residential only)

Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Agenda Background –Low-flow showerhead background –Current deemed measure Residential Showerheads –Assumptions and savings from current deemed measure –Proposed modifications to current assumptions –Proposed parameter values for lower-flow showerheads –Potential savings impacts Commercial Showerheads –Proposed assumptions and analysis approach Research Plan –Use direct install measure as vehicle to collect data for measure analysis update Proposal

Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Background Pre 1992 – Showerheads capable of 4-5 gpm (or more) –Typically throttled to ~3.2 gpm 1992 EPAct – 2.5 gpm maximum flow rate, at 80 psi 1990’s – conservation efforts (primarily water) distribute EPAct qualifying showerheads en masse – Seattle – 2.5 gpm average in situ flow rate, 2.2 gpm median. Comparable to studies in other regions 2009 – Miami-Dade County, Florida – limits flow rate to 1.5 gpm, distributes compliant showerheads – U.S. EPA to release WaterSense performance specifications for showerheads ≤ 2.0 gpm. (latest estimate is March)

Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Current Deemed Measure RTF initially deemed in 2007 –Current baseline assumption is customer average showerhead flow rate of 2.2. gpm This implies average rated flow rate is slightly less than 2.5 gpm. –Residential applications – Retrofit existing showerheads with ≤2.0 gpm rated showerheads –Current measures assumes 2.0 gpm rated (1.8 gpm in situ) No additional savings for lower flow rates –Shower prominence - {primary, secondary, any } –Water heater fuel - {electric, gas, any} –Savings based on engineering analysis, informed by end-use study in 2000, survey of in situ flow rates of existing and low-flow (2.0 gpm) showerheads in –Incentives provided for 66,000+ showerheads from BPA Since average MW

Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Current RTF Measure Eligibility “Replacement showerhead shall be pressure-compensating with non-removable flow controller and have flow rate of 2.0 gpm or less as tested at 80 psi (552 kPa) in accordance with ANSI standard A M. Showerhead shall be installed by utility staff or utility contractor or delivered to the consumers in fulfillment of their request. Limited to two (2) showerheads per residence.”

Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Current RTF Baseline Assumptions

Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Current RTF Baseline Assumptions Measure Cost: $24 (includes material and distribution) Measure Lifetime: 10 years Water Cost: $10.03 / 1000 gallons Water energy intensity: 5.3 kWh / 1000 gallons

Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Current RTF Savings The five year regional savings potential is 85 average MW

Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Adjustments to Current 6 th Plan Measure – Residential Showerheads Proposed changes Baseline adjustment New showerhead ratings –greater than 1.75 gpm, less than or equal to 2.0 gpm –greater than 1.5 gpm, less than or equal to 1.75 gpm –less than or equal to 1.5 gpm Potential impacts to savings from lower flow rates

Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Baseline Adjustments Baseline is primarily unchanged from current measure Recommend updating the hot water percentage assumption –Currently assumes average user setting of 105°F –More recent study* found 108°F * Mayer, P. W., DeOreo, W. B., & Lewis, D. M. (2000). Seattle Home Water Conservation Study. Seattle Public Utilities and the U.S. EPA.

Slide 12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Baseline Adjustments

Slide 13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Potential Impacts to Savings In order to define savings by gpm < 2.0, need to address the following issues: –In situ flow rate –Shower duration –Temperature set-point –Uptake Satisfaction Scalding

Slide 14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N What is the actual flow rate once installed? –Showerheads are rated for 80 psi, residential average ~65 psi. Flow rate decreases as pressure decreases –Field studies typically observe in situ flow rate ~90% of rated* For example, a 2.5 gpm rated showerhead will have an average in situ flow rate of 2.25 gpm. –Current and proposed measure require pressure-compensation. There are currently no performance specifications for this claim. US EPA WaterSense specifications due out in March 2010 –>60% of rated flow rate between 20psi and 80psi –>75% of rated flow rate between 45psi and 80psi *Schuldt, M., & Tachibana, D. (2008). Energy-Related Water Fixture Measurements: Securing the Baseline of Northwest Single Family Homes. Proceedings of the 2008 ACEEE Summer Study on Energy Efficiency in Buildings. ACEEE. In Situ Flow Rate

Slide 15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Recommendations: –Maintain 10% de-rating of rated flow rate for all calculations, all flow rates In Situ Flow Rate

Slide 16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Do lower flow rates result in longer showers? Field studies have not shown statistically significant increase in 2.5gpm to 2.0 gpm retrofits –For example, SPU study in 2000: 7.91 minutes baseline, 7.84 minutes post retrofit, difference not statistically significant* Effect may be present, but has not been quantified * Mayer, P. W., DeOreo, W. B., & Lewis, D. M. (2000). Seattle Home Water Conservation Study. Seattle Public Utilities and the U.S. EPA. Shower Duration

Slide 17 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Recommendation: For 2.0 gpm showerheads, assume no increase in shower duration from baseline (7.84 minutes) For 1.75 and 1.5 gpm, increase duration assumption by 5% and 10%, respectively Shower Duration

Slide 18 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N How does lower gpm affect water temperature? Smaller droplets and less absolute water volume decrease water temperature experienced Increase in temperature set-point has been observed for 2.2 gpm (108°F) to 1.8 gpm (110°F)* *Mayer, P. W., DeOreo, W. B., & Lewis, D. M. (2000). Seattle Home Water Conservation Study. Seattle Public Utilities and the U.S. EPA. Temperature Set-Point

Slide 19 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Recommendation: Assume observed values for baseline and 2.0 gpm Assume linear increase in hot water percentage at lower flow rates. Temperature Set-Point

Slide 20 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Delivered Showerheads Installed How many showerheads stay installed? User satisfaction is indirectly correlated to flow rate Recommendation: Direct Install Keep current measure assumption of 90% to account for potential change-out Retail/Mail by Request Reduce install percentage to account for non-feasible applications (unacceptable temperature variation) and sub-optimal installations

Slide 21 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N RTF should be aware of this issue Pressure disturbances (e.g. toilet flush) cause an imbalance of hot/cold water at the fixture. Most U.S. codes since 1987 require automatic-compensating mixing valves (thermostatic, pressure balancing, or combination), to work with dev ices rated at 2.5 gpm, 45 psi –Performance may decrease at lower flow-rates No public records documenting reduced flow rate that contribute to accident, or product recall –At least several conservation programs currently distributing sub-2.0 gpm showerheads. US EPA WaterSense documentation discusses the potential, but will certify sub-2.0 gpm showerheads Thermal Shock and Scalding

Slide 22 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Treatment and Recommendation: Tested for during direct install (measure specification) Programs should ensure adequate documentation of risks Recommend that water heater temperature setpoint be checked and set to 120°F or less Reduce % of delivered showerheads installed for retail and mail-by-request to account for unacceptable temperature variation Thermal Shock and Scalding

Slide 23 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Cost and Measure Life Measure Cost $24 retail and mail by request (same as current PTR measure) $31 direct install –Cost includes labor time (20 $20/hour) to replace, test for acceptable thermal variation, test flow rate, collect data for annual utilization –Data collection will be used to update assumptions used in savings analysis Measure Life 10 years (same as current PTR measure)

Slide 24 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Savings and Cost Effectiveness – Residential Direct Install

Slide 25 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Savings and Cost Effectiveness – Residential Retail and Mail-by-Request

Slide 26 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Showerheads Requesting Provisionally Deemed Savings for direct install measures for: Hospitality (hotel/motel) Hospitals Small commercial employee showers Research Required for full deeming Determine baseline flow rate in above commercial applications Usage information to determine annual utilization (minutes/year) of showerhead Residential values assumed for all other parameters

Slide 27 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Analysis Use residential analysis assumptions for flow rates, temperature, cost. Adjust showerhead utilization (minutes/year) by business type Recommended baseline data collection for provisionally deemed measure: –Flow rate (pre and post retrofit) –Parameters used to derive annual utilization

Slide 28 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Baseline – Annual Utilization

Slide 29 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Baseline – Annual Utilization

Slide 30 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Baseline – Annual Utilization

Slide 31 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Savings Assumptions Same post-retrofit assumptions as residential:

Slide 32 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Savings and Cost Effectiveness – Commercial Direct Install

Slide 33 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Provisionally Deemed Research Plan Use direct install program as vehicle for data collection for savings update Collect baseline information during retrofit for savings update –flow rate –water pressure –information used to derive utilization (min/year) occupancy rates, # of users per shower showers/person/day (if known) shower duration (if known) Recommended sunset date (18 months)

Slide 34 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Request for RTF Approval 1) Residential Direct Install –Deem savings values for the three flow rates specified –For direct install, require pre/post data collection at time on install to update baseline Retail and Mail-by-Request –Deem savings values for the three flow rates specified Five year sunset for by delivery mechanisms 2) Commercial Direct Install –Provisionally deem savings values for the three flow rates specified for 18 months

Slide 35 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Discussion

Slide 36 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Backup – Commercial Retail and Mail-by- Request Results

Slide 37 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Backup – Residential Baseline Analysis

Slide 38 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Backup – Commercial Baseline Analysis

Slide 39 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Backup – Residential Retrofit Gross Analysis

Slide 40 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Backup – Commercial Retrofit Gross Analysis