Proposed Retail Rate Change Effective January 1, 2008.

Slides:



Advertisements
Similar presentations
Calaveras County Water District Capital R&R Program Funding Options March 25,
Advertisements

Regional Water Service Development Cost Charges Update October 2014 Bryan Shoji, P.Eng. General Manager, Infrastructure Services.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Utility Extension Project
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
Tigard_WSP_0410 Components of a Water System Master Plan 1. Chapter 1 – Existing System 2. Chapter 2 – Demand Projections 3. Chapter 3 – Hydraulic Model.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
TOWN OF CHESTER PROPOSED BUDGET PUBLIC HEARING MAY 1,2013 TOWN MEETING MAY 21,2013.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Preliminary Budget Follow-up Council Briefing November 3,
Proposed 2013 Property Tax Levy Tax Levy 2013 levy request = $21,814,158 Operating levy frozen since 2009 levy Estimated decrease in city-wide EAV.
Limited Proceedings Water & Wastewater Reference Manual1.
FY-2013/2014 Service Reduction and Fire Station Closure Plan 1.
Town of Lantana Budget Workshop July 27, :30 PM TOWN OF LANTANA 2009/10BUDGETWORKSHOP.
City of West Linn Fiscal Year 2009 Budget Tuesday.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
3TB Project Review Tax Increment Financing (“TIF”) Overview January 25, 2013.
Mid-Biennial Budget Modifications Budget Modifications Mid-Biennium Review Includes Changes to 2008 Only Requirements for Changes – Significant.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Budget Presentation 2009 Budget Presentation 2009 City of Cohoes November 6, 2008 Van Schaick Neighborhood Watch.
 Financial Moment January Requested 2013 Approved 2014 Requested 2014 Approved Reduction ‘13 vs. ‘14 General Fund Advertised 9,401,4048,643,0909,327,183.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
2015 Financial Plan. PROCESS Staff began work on this budget in September 4 meetings including today are scheduled – Jan 26, 28 and Feb 2 and further.
2013 Business Planning Process. Business Planning Process Guidelines Budget Preparation Preparation of Business Plans Management Review Presentations.
CONTINUED PUBLIC HEARING PROPOSED WATER SERVICE CHARGE REVISIONS WILKINSON MANOR MAINTENANCE DISTRICT COUNTY SERVICE AREA 46 - MORADA NORTH 1.
Proposed FY 2016 Budget Town of Lisbon Presentation to Board of Selectmen October 7, 2015.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
FISCAL YEAR 2015 RECOMMENDED BUDGET Joint Finance Committee/City Council June 16,
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
FY08 PARKING PERMIT FEE PROPOSAL November 20, 2006.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
City Council May 20, Streets Funding Options Options for funding: Street Maintenance Sales Tax = Approx. $2M/year Franchise/Right of Way Fees (State.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
New Information 1 Governor’s proposed budget Basic Education Funding $200 million increase (Includes Right to Learn funding) Special Education.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
REVENUE OVERVIEW FY2016 PROPOSED BUDGET July 28,
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Water Booster Station Improvement Study
Capital Plan Update and Five-Year CIP
MOUNTAIN REGIONAL WATER
Fiscal Year 2017 Final Budget Workshop
Joshua Basin Water District Draft Findings & Rate Scenarios
Lane County, Oregon Presentation to the Finance and audit Committee
Public Meetings Resident Submissions Community Groups Social Media
Joshua Basin Water District Revised Rate Recommendations
Capital Improvements Planning
Idyllwild Water District
FEE INCREASES Public Work Shop June 2, 2018.
Orange County Board of County Commissioners January 24, 2017
Adoption of the Fiscal Year 2019 Recommended Operating Budget
Presentation transcript:

Proposed Retail Rate Change Effective January 1, 2008

Process 2006 Retail Financial Plan & Water Rate Study 2006 Retail Financial Plan & Water Rate Study Capital Improvement Program Changes – schedule and costs Capital Improvement Program Changes – schedule and costs Operating Costs Update Operating Costs Update Capital Funding Update Capital Funding Update Retail Financial Plan Update Retail Financial Plan Update

Retail Financial Plan & Water Rate Study Recommended Five-Year Rate Structure: Recommended Five-Year Rate Structure: % % % % % % 20108% 20108% 20113% 20113%

Capital Improvement Program Update Deferred Joint Water Storage Tank Project at least 5- years $4M Deferred Joint Water Storage Tank Project at least 5- years $4M Deferred Sierra Pump Station improvements required by Joint Water Storage Tank Project $500K Deferred Sierra Pump Station improvements required by Joint Water Storage Tank Project $500K Reduced Auburn-Folsom Road 24” Pipeline Project cost by $1.5M - cost savings of partnering with Placer County Reduced Auburn-Folsom Road 24” Pipeline Project cost by $1.5M - cost savings of partnering with Placer County Eliminated Kokila Reservoir Pressure Reducing Station (due to optimizing pressures within Bacon Zone) $200K Eliminated Kokila Reservoir Pressure Reducing Station (due to optimizing pressures within Bacon Zone) $200K Eliminated Bacon Pump Station stand-by generator (due to optimizing pressures to reduce pumping requirements within the Bacon Zone) $600K Eliminated Bacon Pump Station stand-by generator (due to optimizing pressures to reduce pumping requirements within the Bacon Zone) $600K Re-scheduled several steel water line replacements based on current condition assessments to defer costs Re-scheduled several steel water line replacements based on current condition assessments to defer costs Added $300k for retail area groundwater study Added $300k for retail area groundwater study

Impact of CIP Update Eliminated First Recommended Debt Financing Eliminated First Recommended Debt Financing Reduces operating cost by $500,000 Reduces operating cost by $500,000 Altered Timing and Size of Succeeding Debt Financings Altered Timing and Size of Succeeding Debt Financings

Operating Costs Update Decreased: Conservation programs Decreased: Conservation programs Increased: Engineering professional services, Transmission & Distribution maintenance Increased: Engineering professional services, Transmission & Distribution maintenance Pressure Zone Testing Pressure Zone Testing

Capital Funding Update Increased connection fees received Increased connection fees received Increased property taxes received Increased property taxes received

Retail Financial Plan Update Recommended Five-Year Rate Structure: Recommended Five-Year Rate Structure: % % 20087% 20087% 20097% 20097% 20107% 20107% 20114% 20114%

Additional Consideration Dry year planning and funding Dry year planning and funding