Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.

Slides:



Advertisements
Similar presentations
Dmitrii Mausuzenko, Oleg Maev (PNPI)
Advertisements

EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
Environmental Conditions in the LHC Experimental Caverns JCOV Thursday 18 th March.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Radiation Protection for the Beam Line 4 Schools project Robert Froeschl (DGS/RP)
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
Mise à jour Aout 2009T. Octave pour D.Lacarrère & E.Thomas1 UX85-A – Safety devices (1)‏ LocationAUG ancien AUG nouveau Evacuation (E)‏ ExtinguishersPhonesChaine.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
PET/CT Workshop Presented at VCUHS by Jennifer Love and Mark Crosthwaite by Jennifer Love and Mark Crosthwaite.
Visitor’s path declassification for LS2 and LS3? (Summary of first discussion K. Barth with RP – H. Vincke)
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
Types of Radioactivity Three types of Radioactivity: Alphas: Positively charged; Helium nuclei; can be stopped by paper Betas: Negatively charged; electrons;
EDMS - Engineering Data Management System Electronic Documents Management System Introduction to EDMS (slides): example.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
18/11/04DELPHI visits, PhC1 Visits to DELPHI/LHCb Ph.Charpentier.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Radiation Foldable Setup. Your Name radiation radioactive irradiated decay half life contamination.
LEA 01 October 2008D.LACARRERE1 Level 1 Level 2 SX8 - Emergency Exit – Schematic Side View (from inside building) NO SCALE OPTION 1 Point 8 – Barrack inside.
EDMS July 2004 LHCb Experiment Area Meeting RAMSES at LHC point 8 LHCb Experiment Area Meeting 21 July 2004 RAMSES at LHC point 8 LHCb Experiment.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
CALO News Pascal Perret LPC Clermont 23 October 2011.
Working Procedure with Ionizing Radiation 1. Introduction Introduction Classification of Areas Classification of Areas Safe Handling/Use of Safe Handling/Use.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Support M1 Support PS Access for ECAL/HCAL electronic racks Stabilize ECAL/HCAL (seismic events) Support beam.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
Muon Piquet Training: General Informations March 8-th 2016.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Louisiana State University Radiation Safety Office
ALICE 5 o’clock meeting Wk 51.
2016/9/30 Yasuhiro Infra/CFS mini-ws
Report on database work for INB in ATLAS
The LHCb Installation Story
Update on ‘Real estate’ for Level-0
Radiation Protection for the Beam Line 4 Schools project
LHCb & EYETS
OT Survey & Adjustment Outline: Survey technique at present
Presentation transcript:

Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 2 HCAL sources  Hadron CALorimeter uses Cs sources for calibration one per half detector  gamma sources: nº4145RP (330 MBq) and nº4146RP (300 MBq)  Notice at PZ85 and PM85 of presence of sources in UX85-B with map indicating location of garages garage on floor of electronics platform on top of HCAL, source blocked inside  UX85-B conventional area when source in garage (≤ 0.5 µSv/h at 40 cm)

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 3 HCAL sources  EDMS : safety manual and operational procedure for scan  Calibration scan announced at least 48 hours in advance and notices in PZ85 and PM85  take place from 21:00 in the evening to 7:00 in the morning  Flashing panels bottom of Calorimeters stairs and top of gantry at exit of source(s)  UX85-B is a supervised area during scan for incident if source would stop during scan  Measurements confirm UX85-C is not classified AD6 HCAL platform  Maximum dose rate measured = 116 µSv/h  Total integrated dose = 1.31 µSv. AD6 Cryo area  Maximum dose rate measured: 0.37 µSv/h  Total integrated dose: 0.2 µSv. RESPONSIBLE: Rustem Dzhelyadin

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 4 OT sources  OT uses 3 x 90 Sr source Fe for irradiation and scanning  gas quality and chamber response  beta sources: no. 4251RP(27 MBq)–4298RP(70MBq)–4299RP(70MBq), X-ray: no. 3398RP (9MBq) 2828/U1-A06 (6.0 x 4.0 m2) RADIOACTIVE SOURCE position when used in the room ROOM DETAILS UX85 - LOCALIZATION OF RADIOACTIVE SOURCES AT 2828/U1-A06 SAFE where the sources are stored when not used. Sources kept in a safe in a locked room in UX85-A Panel on the door One beta source used in the room for gas quality with small panel

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 5 OT sources EDMS : safety manual and operational procedure for scan on OT frame EDMS in preparation for irradiation on pillar Signs in place before installation of source, 2 OT halves chambers open RESPONSIBLE: Antonio Pellegrino

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 6 Muon source  MUON uses Am for gas quality  alpha and low energy gamma  At the moment in gas building on the surface, will be moved in UX85-A in 2828/U1-A06  EMDS : Safety manual and operation procedure  kept in a safe, panel when in use RESPONSIBLE: Burkhard Schmidt

LHCb Experimental Area Meeting - 05 August 2008Gloria Corti Page 7 DELPHI sources  Am sources (alpha) in HPC module of the Electromagnetic Barrel Calorimeter – Not accessible  no. 2946RP, 3.2 MBq on  Responsible Gloria Corti  24 55Fe in TPC of Delphi – Not accessible  RP 370 MBq on  RP, 2936RP, 2.41 MBq on  Responsible Philippe Charpentier