LINC-NIRVANAW. Gaessler 03/10/2006 LINC-NIRVANA Wolfgang Gaessler J. Berwein, F. Briegel, F. Kittmann, A. Pavlov, C. Storz MPIA (Germany),

Slides:



Advertisements
Similar presentations
Standard stars for the ZIMPOL polarimeter
Advertisements

Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
The adaptive secondary mirror. Current technology for MMT/LBT A. Riccardi 1, G. Brusa 1, C. Del Vecchio 1, P. Salinari 1, R. Biasi 2, M. Andrighettoni.
Wavefront Correction SystemWavefront Correction System Hardware and Software.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
Large Binocular Telescope Interferometer Performance of the Raytheon Aquarius 1K mid-IR Array with the Large Binocular Telescope Interferometer William.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
1 Visible Flexure Camera Analysis J. Kent Wallace March 14, 2006.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
A Short Presentation of Ongoing AO Work at Lund Observatory Mette Owner-Petersen Lund Observatory Workshop for “Forskarskolen i Rymdteknik” Gothenburg.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
LBC-Blue pre-commissioning LBC-Blue LBC-Blue –E Giallongo (PI) Rome: diPaola, Pedichini, Speziali, Testa, Gallozzi Rome: diPaola, Pedichini, Speziali,
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
The Gemini MCAO System (EPICS Meeting, SLAC, April 2005) 1 The Gemini MCAO System Andy Foster Observatory Sciences Ltd.
Keck AO Operations D. Le Mignant for the Keck AO team.
MCAO Laser Coordination and SALSA Jacques Sebag / Corinne Boyer.
J. Large Binocular Telescope (LBT) Operational Readiness
LSST Scheduler requirements
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
AO for ELT – Paris, June 2009 MAORY Multi conjugate Adaptive Optics RelaY for the E-ELT Emiliano Diolaiti (INAF–Osservatorio Astronomico di Bologna)
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
ASTRO-F Survey as an Input Catalogue for FIRST Takao Nakagawa (ISAS, Japan) & ASTRO-F Team.
IRIS OIWFS Concept Study D. Loop1, M. Fletcher1, V. Reshetov1, R
LBT SW workshop. Tucson, 2-6 Oct 2006 A. Riccardi - The LBT AdsSec units1 The two LBT adaptive secondary units (LBT672a, LBT672b) A. Riccardi, M. Xompero,
Conference “Feeding the Giants: ELTs in the era of Surveys” -- Ischia 31/08/2011 Large field of view and ELTs: an impossible marriage? Paolo Ciliegi (INAF.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
K. G. Strassmeier, Polarimetry with ELTs, Utrecht, Nov./Dec Smart Focal Plane Spectropolarimetry with the E-ELT Klaus G. Strassmeier, Leibniz-Institute.
Ground Layer AO at ESO’s VLT Claire Max Interim Director UC Observatories September 14, 2014.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
The Active Optics System S. Thomas and the AO team.
Phase retrieval in the focal plane
D. Measurement Approach Phil Hinz Principal Investigator.
Guiding Control Subsystem (GCS) Overview
HARPS Data Flow System Christophe Lovis Geneva Observatory HARPS-N PDR, 6-7 December 2007, Cambridge MA.
Some Thoughts on Ground Layer Adaptive Optics & Adaptive Secondary Mirrors for Keck P. Wizinowich 9/15/14 1.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
The Self-Coherent Camera: a focal plane wavefront sensor for EPICS
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
Instrument Control Systems Seminar, 20 th - 24 th October 2014, Slide 1 Common Library for Image Processing (CLIP) César Enrique García Dabó, Mario Kiekebusch.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
INS SW Workshop, Garching 8 October, 2008 Andrea Richichi European Southern Observatory.
LBC-OB Gui User Interface v 2.0 Stable Stefano Gallozzi & LBC-Team Stefano Gallozzi & LBC-Team © Copyright 2007.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Instrumentation Software - Overview
Imaging with the James Webb Space Telescope
Pyramid sensors for AO and co-phasing
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Single Object & Time Series Spectroscopy with JWST NIRCam
JWST Overheads Jeff Valenti S&OC Mission Scientist
SDW 2017 – MICADO for the ELT Baltimore, September 26th 2017
Jesper Schou Instrument Scientist
NGS AO Control Light from Telescope Telescope pointing offload
Launch and On-orbit Checkout
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

LINC-NIRVANAW. Gaessler 03/10/2006 LINC-NIRVANA Wolfgang Gaessler J. Berwein, F. Briegel, F. Kittmann, A. Pavlov, C. Storz MPIA (Germany), INAF (Italy), Universitaet Koeln (Germany), MPIfR (Germany)

LINC-NIRVANAW. Gaessler 03/10/2006 LINC-NIRVANA Fizeau Imager with MCAO  JHK (1-2.4 µm) Pixel:5.11 mas /23m:10 mas (J) - 20 mas (K) FOV:10” science 1’x1.5’ FFT 2’ Mid-High AO 6’ GLAO AO 100 m, 8-14 km (6-8 km) 8 NG stars in MHWS; 12 NG stars in GWS 2’2’ 6’

LINC-NIRVANAW. Gaessler 03/10/ ° 0° -60° Reconstructed 23m Resolution LINC-NIRVANA Observation

LINC-NIRVANAW. Gaessler 03/10/2006 LN Common SW Software overview OPS Estimator Viewer (GUI) OPS = Observation Preparation SW, OSS = Observation Support SW, ICS = Instrument Control SW, TCS = Telescope Control SW, AOS = Adaptive Optics System, FFT = Fringe Flexure Tracker, IRC = Infrared Camera, WDHS = Wavefront Data Handling System OSS Scheduler Executor ICS Sub-system co-ordination, synchronization TCS Interface wrapper AOS 4x System ctrl 4x Wavefront ctrl FFT System ctrl Piston ctrl IRC System ctrl Detector ctr Observation Level System Level Sub-System Level WDHS optimization offloading

LINC-NIRVANAW. Gaessler 03/10/2006 Control Architecture FFTS DM M2 Hex M1 Piston HWS GWS 728Hz WDHS TCS >1Hz 1kHz 2kHz

LINC-NIRVANAW. Gaessler 03/10/2006

LINC-NIRVANAW. Gaessler 03/10/2006

LINC-NIRVANAW. Gaessler 03/10/2006

LINC-NIRVANAW. Gaessler 03/10/2006 Computer 9 Power 4.2kW Space 19” 54RU Ethernet/26Fiber/2BCU/Vibration?

LINC-NIRVANAW. Gaessler 03/10/2006 Instrument/Observation Modes InsMode –Single –LINC –NIRVANA ObsMode –Staring –Nodding <5” –Dithering >5”

LINC-NIRVANAW. Gaessler 03/10/2006 Set MHWS r/l (67s) Observation procedure Launch Observation Set GWS r/l (84s) Start GWS (287s) Set FFTS (120s) Set IRCS (120s) Offset (nod120/dith600s) Preset Telescope (<130s) Move GWS Move MHWS Start MHWS (166s) Move FFTS Start FFTS (180s) Start De-Rot Science Exposure

LINC-NIRVANAW. Gaessler 03/10/2006 Observation Preparation (off LBT) Targets/Reference LN OP LBT Visual Target Tuner Reference Star Selector Position Editor Offset Pattern Editor File Elevation Plot File Performance Estimator File Observation Program Editor Instrument Setup Editor Observation Block Editor File Target Selector File Creates one or more OP OP = Sum of OB for one or more targets Simpelst OP = one OB for one target

LINC-NIRVANAW. Gaessler 03/10/2006 Observation LN OP LBT File OB Executor Planner Procedures Staring Nodding Dithering Changing Filter Offset End OPS

LINC-NIRVANAW. Gaessler 03/10/2006 Observation Execution IRCS AOS GWSL AOS GWSR AOS HWSR AOS HWSL WDHS FFTS EngineeringOperation Status DisplayAlarm DisplayExecutor