VENµS MISSION STATUS VENµS users meeting – Jan 2010 Pierric FERRIER, CNES.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Low Energy, Low Cost Swift A design experiment June 2010.
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
ISIS Turnkey Missions ISIS designs, manufactures, launches and operates affordable, capable, nanosatellites ISIS provides turnkey missions for institutional,
Titre du document + date Arial 8  à modifier dans le masque (Affichage/Masque/Masque des diapositives) CNES – 9 Décembre 2013 Karine MERCIER SVOM ECLAIRs.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
Commercial Confidential 1 LIM Yoram Yaniv, October 2010 LIM Yoram Yaniv, October 2010.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
Constellation Orion Visible Light Constellation Orion Infrared Light.
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
SDW2005, juin, Taormina The Corot Space instrument.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
IR CAMERA EUSO BALLOON JEM-EUSO Balloon CDR, CNES, Toulouse. December 18, 2012 José Santiago Pérez Cano. Orbital Aerospace, Madrid, Spain. Héctor Prieto,
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Dr Mark Cresswell Satellite Sensors EG5503.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Natal Workshop October 30th, Project Status.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Telescope Integration and Tests Tuesday Afternoon.
CERES – Atelier Vol en formation pour l’astrophysique et la physique solaire 17 Octobre ASPICS 2 - Formation Flying for Solar Physics 100 m +/-
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University
Laser-Astrodynamics, Space Tests of Relativity, and Gravitational Wave Astronomy 3 rd International ASTROD Symposium – Beijing, China – July 2006 TIME.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Test Readiness Review 23 October 2003 CRAL - LYON.
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
MALAYSIA IN SPACE NATIONAL SPACE AGENCY VISION Harnessing space as a platform for knowledge generation, wealth creation and societal well-being.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Il programma NHXM sviluppato dall'ASI Ing. Mauro Piermaria New Hard X-Ray Mission Workshop Nazionale 12 e 13 novembre 2009 – ASDC, Frascati.
MSG-2 launch preparations E. Oriol-Pibernat MSG Mission Manager GIST, IC, December 2005.
Korea Aerospace Research Institute (KARI)
CSP 25th November 2010 Technical agreement number 3: overview
Upcoming Facilities of IIA
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
Lunar Descent Trajectory
Launch and On-orbit Checkout
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Tina Büchner da Costa, ArianeGroup
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Main information on the «WORLD SPACE OBSERVATORY» project
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

VENµS MISSION STATUS VENµS users meeting – Jan 2010 Pierric FERRIER, CNES

VENµS users meeting – Jan Camera status 2- Bus status 3- Ground segment status 4- Launcher status 5- Summary Content

VENµS users meeting – Jan CEU DETECTORS ASSEMBLY BEZEL TUBE SUN SHIELD THERMAL CONTROL SHIELD SMA PMA CORRECTION LENSES Camera longitudinal section 1- Camera status

VENµS users meeting – Jan Tube equipped with both mirrors 1- Camera status

VENµS users meeting – Jan Correction lens assembly 1- Camera status

VENµS users meeting – Jan Thermal control shield (external cylinder) 1- Camera status

VENµS users meeting – Jan Camera status synthesis ~ 1.4 mm 2.0 mm 8.0 mm 10 mm Blocking Filter Narrow-band Filters 1- Camera status BARR filters= the weakest link of the chain, so far months needed to obtain the ITAR approval 13 months delay in manufacturing due to technical issues (delivery expected in March) The current schedule shows a camera delivery at end of Aug 2011

VENµS users meeting – Jan Mass: 250kg - Power: 800w - Overall stowed dim: 1.6x1.2 m - 2xSTR - 2 X-band - 1xIHET redunded, 16 Kg Xenon - 4x1N redunded thrusters, 7 Kg hydrazine 2– Bus status

VENµS users meeting – Jan – Bus status

VENµS users meeting – Jan – Bus status

VENµS users meeting – Jan – Bus status

VENµS users meeting – Jan Bus status synthesis 2– Bus status Base plate to be delivered this quarter (from RAFAEL to IAI) Other parts of the bus are stored and ready for final bus assembly (solar pannel, satellites pannels - 6 of them, and all bus internal subsystems)

VENµS users meeting – Jan Scientific mission FRANCE Satellite command & control and technological mission ISRAEL 3– Ground segment status Ready end of 2010

VENµS users meeting – Jan – Launcher status The foreseen launcher for Venµs is PSLV so far. Unfortunately this scenario faces 2 issues at the INDIAN government level as Venµs would be the co-passenger, the risk exist to be injected in a non optimal orbit (i.e. 666 km – 3days instead of 720 km -2 days) Nevertheless, other scenarios exist, the main one being a launch with PLEIADES 2 on SOYOUZ Current engineering practice calls for a final launcher selection 2 years ahead of the foreseen launch date. In other words the launcher will be selected in 2010.

VENµS users meeting – Jan Mission timeline last quarter CAMERA MISSION GROUND SEGMENT IHET SATELLITE GROUND CONTROL SEGMENT mid year MISSION …… 5- Summary 2010