Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 1 Inner Triplet Interconnects Electrical Connections.

Slides:



Advertisements
Similar presentations
D1 and MCBXC pressurized superfluid helium channels sizing for heat extraction Rob van Weelderen
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
> >
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
1 LHC-DFBX DFBX Production Readiness Review Project Overview Joseph Rasson LBNL October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
R. Ostojic CERN, AT Department. 2 LHC Insertions Experimental insertions in points 1, 2, 5, 8 contain low-beta triplets. In total, eight triplets are.
Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Polarity Issues at the Inner Triplets and DFBXs.
MPP Meeting Sandor Feher Inner Triplet Powering Should include the IR quads and the DFBX especially the power leads. DFBX commissioning doc was.
Joint HiLumi LHC-LARP Meeting – October 26-30, 2015 MQXFA Functional Requirements Ruben Carcagno October 30,
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Electric Energy Notes.
MALAYSIA Feb 21 –22 February 21.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
Splice Joint Design and Analysis John Escallier Brookhaven National Lab bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
10/3/05 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer Roger Rabehl Fermilab.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Quadrupoles and orbit correctors bus bars routing along the inner triplet string MQXF Workshop at CERN– February the 3 rd 2016 H. Prin With acknowledgements.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
Forms of Energy Openers Mrs. V Science Match each definition to the correct key term A. B. C. D.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
September 8, 2005M. Lamm HC and Install US Deliverables1 Installation and Commissioning Project Present Participation How we might participate.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Energy Transformations
Status of the low-β triplets
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Cold mass design, assembly plans and QA/QC at CERN
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Status of cryostat integration and conceptual design
CEA Nb3Sn quadrupole magnet : test results and future
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
February 12 – 19, 2018.
Energy Transformations
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Electrical Wiring Single Pole Switches.
WP3 Meeting – December the 10th 2015 H. Prin
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Experimental equipment Edgar L. Black February 17, 2019
LHC installation status
ECR on pole order of the HL-LHC IT circuit and resulting implications
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 1 Inner Triplet Interconnects Electrical Connections and Routing Rodger Bossert 24 February 2004  Inner Triplet Bus & Instrumentation wiring Layouts  Q1,Q2,Q3 Bus Assemblies  Q1,Q3 Expansion loops.  Splices  Instrumentation  DFBX Interface  Parts Status

brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 2 Inner Triplet Bus and Expansion Loop Layout

brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 3 Lead End of Q2 with Splices Loop for thermal expansion differential between bus and Q2 ¼ and ½ Coil Splices Bus Housing Lead and correction coil Splices

brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 4 Picture of End of MQXB Cold Mass