Project design criteria met? Project Implementation “During” Project Monitoring “Post” Project Monitoring (IDT) Project Preparation Project Planning NEPA.

Slides:



Advertisements
Similar presentations
What is problem-solving? A decision making process that uses data 1. Problem Identification 2. Problem Analysis 3. Plan Development 4. Plan Implementation.
Advertisements

Program and Implementation. Plans for the next 90 minutes and beyond! Define quality assurance for a program Implementation plans Utilization of.
OHIM new way of managing projects – Quality improvements
Reg Brown. Engagement Design Implementation Meshing.
Introduction to Monitoring and Evaluation
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Environmental Management System (EMS)
Flowchart on Procurement Guidance for a proposed OBA scheme Is the project involving an existing service provider (SP) ? YES NO PROJECT PREPARATION Are.
Prepared by Management Department | | Internal Innovation : Implementation.
January 24, 2008 Policy Development Division 1 FSIS Notice Verification of the Annual Reassessment and Establishment Training Requirements Under.
Binary Decision Diagrams1 BINARY DECISION DIAGRAMS.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
Standards-In-Action Pilot KENTUCKY. OVAE’s SIA Consortium 2 State leads 3 Program directors Geographically accessible Performance Strong leadership Selection.
» Pay for Performance is a compensation or incentive program that links pay and performance. Employee’s are rewarded for how well they perform their duties.
UT-Arlington Accounting CPE Day August 13, 2014 SEFA Preparation and Subrecipient Monitoring.
Learning Objectives LO5 Illustrate how business risk analysis is used to assess the risk of material misstatement at the financial statement level and.
Maintenance and Support Week 15 CMIS570. User Training Need to consider the same 2 groups: End users Use the system to achieve the business purpose Creating,
January 19, 2013 Chair: Mr. Bob O’Neill Making Studies Work —a discussion of challenges and solutions to the management of studies.
Methods of Administration MOA Element 1 Designation of State and Sub-State Level Equal Opportunity (EO) Officer.
UNIT 10: Monitoring and Compliance. 2 Monitoring & compliance Activity 10.1: Class prior experience and local examples of compliance and monitoring activities.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
Southern California Forest Plan Revision and Environmental Management Systems (EMS)
WHY DO WE DO THIS? WHY DO WE DO THIS? WHAT WILL WE DO? WHAT WILL WE DO? WHAT WILL WE ACHIEVE? WHAT WILL WE ACHIEVE? Quality Consultants NAME OWNER AND.
Are these the right areas to treat? Define Desired Conditions (DCs) for Ecological Restoration and Identify Uncertainties Defined by Front Range Roundtable.
Lecture 6 Decision Making.
Project management Topic 1 Project management principles.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Overview of Critical-Path Implementation Requirements Infrastructure required for successful program launch includes: Emissions & Allowance Tracking System.
ISO DOCUMENT CONTROL. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to: 
Monitoring and Evaluation. Objective Identify appropriate monitoring techniques. Identify approaches to evaluating plan implementation and effectiveness.
Steering Committee Meeting No. 3 <Customer Name>
Recommendations on Monitoring and Tracking Quantity and Quality of Climate Expenditure, Accountability and Transparency Group 5.
Team-Based Development ISYS321 Managing the Information Systems Project.
© Prentice Hall, 2003 Business Communication TodayChapter Planning Business Reports and Proposals.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
Energy Audit Monitoring and Verification Requirements 6/27/ L&S Standard 100 Draft Sections 7 & 8 Energy Audit and Monitoring and Verification Requirements.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
ERA Project Team Meeting Project Management Plan April 23, 2002.
Effective Practices for a Successful Standards Review.
1 Auditing Your Fusion Center Privacy Policy. 22 Recommendations to the program resulting in improvements Updates to privacy documentation Informal discussions.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Problem Analysis (I) Collect relevant background information
Chapter 3 Managing the Information Systems Project
Strategies to Reduce Antibiotic Resistance and to Improve Infection Control Robin Oliver, M.D., CPE.
Prescribed Fire Effects Monitoring
Lithuanian Standards for Evaluation of EU Structural Funds
Reasons for Auditing There are many reasons for auditing. Some examples of these reasons might be: Requested by the IRB Committee Requested by an IRB.
4.4 Procurement by grant beneficiaries
Gas Performance Assurance Framework March 2013
Chapter 3 Managing the Information Systems Project
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
الدليل التدريبي للتقييم البيئي المتكامل للمنطقة العربية
Grid Modules Module Use the grid as a guide to ensure elements are aligned and.
Chapter 3 Managing the Information Systems Project
Determining Effectiveness of Internal Audits Presented by: Tony Gutierrez R. Darrell Taylor Minneapolis, MN July 19 & 20, 2012.
(System Development Life Cycle)
8 Steps to Effective Decision Making
Modified at -
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Process and Procedure Documentation
Chapter 2 Managing the Information Systems Project
Evaluating a Form Project Request
Presentation transcript:

Project design criteria met? Project Implementation “During” Project Monitoring “Post” Project Monitoring (IDT) Project Preparation Project Planning NEPA Project prepared as designed? Yes Project design criteria feasible? Ensure Compliance / Take Contract Action (e.g., modify/cancel contract, stop project) Implementation Monitoring Diagram – 6/12/13 No Was project implemented as designed? Yes or No No For future projects Ensure Implementer’s understanding of project purpose and design No Yes If project not stopped Go on to next project, using this project as example Future Project Planning and Implementation Ensure layout designer’s understanding of project purpose and design Dick: Discuss with Greg his edits to narrative Inform next NEPA decision Gali: flip this around as per in head

Project Implementation “During” Project Monitoring (to influence the current project) “Post” Project Monitoring (to influence the next project) Project Preparation Project Planning & Design (NEPA) Project design criteria desirable, feasible, and met? Yes No Can contract be modified consistent with NEPA? Implementation Monitoring Diagram – 5/9/13 No Next project – use same process Was the project properly prepared? Were the project design elements desirable ? Was the project properly implemented? Yes Adaptive management – implementation training No Yes No Yes

Project design criteria met and/or feasible? No Project Implementation “During” Project Monitoring “Post” Project Monitoring Project Preparation Project Planning NEPA Project prepared as designed? Yes No Yes Project design criteria feasible? No Yes Ensure Compliance / Modify Contract Implementation Monitoring Diagram