Presentation Outline Introduction Prototype Design Design Process Reasoning for A-frame design Prototype bridge discussion Final Design Design presentation with changes made Results of bridge improvements Recommendations for the future Conclusion
Introduction Project Restrictions Design a bridge solely out of tongue depressors and fishing line Must span a 16” gap and be 2.5” to 3.5” wide Use no more than 125 depressors and 60 ft of fishing line –The bridge must be as efficient as possible
Design Process Three original choices: Suspension, Arch, A-Frame –Suspension: Makes use of fish line anchors Can’t anchor them far enough away from bridge –Arch: Strong design, but hard to build –A-Frame: Strong like arch, easy to build
A-Frame Reasoning Easy to build Less likely to be built wrong (keystone) Very efficient in holding center weight Makes good use of materials Able to make solid walls
Prototype Bridge
Construction Difficulties Lack of time to work caused: –Poorly placed cross-braces –Warping in walls due to glue not drying No pre-drawn design –Time was not managed well –Cross-bracing not predetermined
Prototype Performance Weight: lbs Held: 478 lbs Efficiency: Break Points –Top of bridge –Cross-brace cuts
Changes Made for Final Bridge Go from 4 depressor tall walls to 3 tall –4 depressors weren’t adding additional support –Using 3 depressors cut weight significantly Cross-bracing changed –Went from slots cut into walls to slots cut into cross-braces –Hoped to decrease stress on bridge walls
Top of bridge heavily reinforced –Top was the part that gave out first –Reinforcement of top would add to the weight holding ability of the overall bridge
Final Bridge
Results of Bridge Improvements Weight: lbs Held: 622 lbs Efficiency: Break Points –Cross-bracing –Walls (warped under weight)
Bridge Discussion New design improvements over prototype –Top of bridge held completely –Shorter walls did not break Prototype points that were stronger –Cutting into the cross-braces made them next to useless
Future Recommendations A-Frame bridge is a good design Possibly use a ratio of cuts into side walls to cuts into cross-braces More reinforcement of cross-bracing
Conclusion Project Restrictions Design a bridge solely out of tongue depressors and fishing line Must span a 16” gap and be 2.5” to 3.5” wide Use no more than 125 depressors and 60 ft of fishing line –The bridge must be as efficient as possible Prototype-weight, held, efficiency: 0.638lbs, 478lbs Final-weight, held, efficiency: lbs, 622 lbs, Differences-weight, held, efficiency: lbs, +144 lbs,