Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY 2011-12 on 04.02.2011.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

Financial Reporting changes for FReM compliant entities Fact Sheet Overview This Fact Sheet highlights the key changes in the HM Treasury.
1 A Presentation on ARR & Tariff Proposal of OPTCL for FY Analysis/Objections/Suggestions February 6, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
FY 2014 Mitigation Process Sept 10, Addresses UNIT Indicators ONLY Should start October 23, when the September NPA Report Cards are posted New score.
BUDGET: A TECHNICAL INTRODUCTION. ANNUAL FINANCIAL STATEMENT: the core budget document, shows estimated receipts and disbursements by the Government of.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Analysis of ARR & Tariff Proposal of SLDC Consumer Counsel.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Understanding Financial Management
1 ARR and Transmission Tariff Proposal of OPTCL for FY Together, let us light up our lives. ORISSA ELECTRICITY REGULATORY COMMISSION.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Release of funds The FC Award for each year releases directly to the Finance Department of the respective States. The Finance Department in turn transfers.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
1 The Impact of SAS 112 on Governmental Financial Statement Audits GAQC Member Conference Call January 4, 2007 Presented by Chuck Landes, CPA.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
0 FY12 State Budget Discussion Policy and Fiscal Committee September 2010.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
CERC (Power System Development Fund) Regulations 2010.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Presentation at DERC Public Hearing in the matter of ARR for F.Y filed by Distribution Companies in Delhi by N. Ponrathnam 6/2/20161.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
Analysis of ARR & Tariff Proposal of OHPC World Institute of Sustainable Energy Consumer Counsel.
1. PRESENTATION TO SELECT COMMITTEE ON ECONOMIC DEVELOPMENT OF DMR 2010 / 11 ANNUAL REPORT 15 NOVEMBER
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Renewables and System Services Ann Scully.
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Portfolio Committee on Appropriations Quarter 1 Expenditure and Performance 24 August 2012 The Presidency Department of Performance Monitoring and Evaluation.
Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
1 A Presentation on ARR & Tariff Proposal of SLDC for FY Analysis/Objections/Suggestions February 8, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
1 PRESENTATION TO SELECT COMMITTEE DATE: 14 MAY 2013.
DEPARTMENT OF ENERGY PCE PRESENTATION ON THE DEPARTMENT’S 2012/13 ANNUAL FINANCIAL STATEMENTS Ms Yvonne Chetty Chief Financial Officer 1.
Standing Committee on Appropriations Quarter 4 Expenditure 2012/ June 2013 The Presidency Department of Performance Monitoring and Evaluation.
Review of utilization of 13 th FC Grants Finance Department
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
Review of utilization of 13 th FC Grants Finance Department
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014(As on ) RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
DEPARTMENT OF WOMEN 3 RD QUARTER PERFORMANCE REPORT PRESENTATION TO PORTFOLIO COMMITEE ACTING DIRECTOR – GENERAL MS OHARA DISEKO 2.
ARR & Price Proposal of GRIDCO For FY and Views of Stakeholders February 15, 2007 Together, let us light up our lives. ORISSA ELECTRICITY REGULATORY.
EXPERIENCE SHARING OF AGDSM PROJECT AT CESC MYSORE Shri M. Muniraju Chief Engineer Chamundeshwari Electricity Supply Corporation Limited (CESC), Mysore.
DEPARTMENT OF TRANSPORT Road Accident Fund: Interim and future processes.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Audit of Accounts & Accounts Records for the year under SSA.
Projects Review Date. 2 Project Name: Project Description/Scope Project Financials/Benefits Xxx Project Timing/Milestones Risks/Issues Xxx Estimated Cost:
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Standing Committee on Appropriations Quarter 3 Expenditure 2012/2013
Ministry of HRD, Govt. of India
Experience of R & M from Regulatory Perspective
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
ODISHA POWER SECTOR SUPPORT OF STATE GOVT
THE NATIONAL TREASURY FEEDBACK WORKSHOP ON THE ANNUAL FINANCIAL STATEMENTS FOR FINANCIAL YEAR 2017/2018.
THE NATIONAL TREASURY WORKSHOP ON LESSONS LEARNT YEAR 2016/17 IN THE PREPARATION OF THE FINANCIAL STATEMENTS OF PROJECTS.
Queries raised by Director (Tariff) on ARR and Tariff Application of SOUTHCO for FY on
Presentation transcript:

Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on

2 OPTCL may submit the status of new transmission projects under construction during FY and (up to date). OPTCL may also furnish to the Commission the Cost over run & time over run due to delay in completion of projects. The actual R&M expenditure for each financial year is always less than the approved figure, indicating that OPTCL has not taken any action to spend the required amount on R&M as approved by the Commission. OPTCL is required to furnish actual expenditure on R & M upto January, OPTCL has not submitted the audited balance sheet for the FY along with statutory Audit Report. The same may be submitted.

3 OPTCL proposes employees cost of Rs cr. during This includes an amount of Rs cr. towards payment of differential amount of pension and pensioners benefit to the absorbed Govt. engineers in OPTCL/GRIDCO, which is yet to be concurred by State Govt. as well as by the Commission. OPTCL may clarify the circumstances under which they have included the amount of Rs cr. under employees cost when no final concurrence has been obtained. Further, OPTCL may clarify whether the details of such additional liability was included in the database submitted to the independent actuary appointed by OERC.

4 The Govt. of India and the State Govt. have announced to give electricity to all through Rajiv Gandhi Gramin Vidyut Yojana & Biju Gramya Jyoti Yojana programme under grid connected route by Therefore, OPTCL may state the action taken for improvement of intra-state transmission system and the required transmission connectivity to meet such additional demand. OPTCL may furnish the action plan for evacuation of power from 30 nos. of Mega Thermal Power Plants coming up in Odisha for which 13 nos. of IPPs and 17 nos. of MPPs have signed MoUs with Govt. of Odisha for installation of about MW. The important issues on the matter of ensuring adequate transmission corridors for both drawal of power for State use and evacuation of power for the consumers outside the State from the proposed IPPs, need to be addressed by OPTCL in its submission of prospective action plan.

5 The Commission in Order dated directed OPTCL to install capacitor Banks of about 275 MVAR at 23 Nos. of strategic points for reactive compensation of the system so that a considerable amount of energy can be saved through such system improvement measure. OPTCL may submit a status report on the same. The EHT voltage as per Rule 54 of I.E. Rule, 1956 should be between +10% and -12.5%, i.e., 132 KV level should be in the range KV and 220 KV level should be in the range KV. OPTCL has, however, experienced voltage out of such allowable limits in some of its grid S/Ss of 220 & 132 KV. The name of such S/Ss have been communicated by OERC letter No.4726 dt OPTCL has to explain the action taken to solve this problem.

6 As per the observations/recommendations of the Technical Enquiry Committee constituted by the Commission, OPTCL has to complete the pending works for increase in overall performance of the transmission system. Hence, OPTCL has to clarify whether the proposal for of Rs Cr. for R & M maintenance and Rs Cr. for CAPEX for O&M related projects incorporates the expenditure to be incurred for implementation of the enquiry committee recommendations.