Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Presenter: Kenny Haulk
Workshops Tech Com: Progress Reports Terminology from the first class period Goal: What it is you are trying to accomplish; the bottom line. Milestone:
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
GANTT CHART Text Text Example
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Capstone Design Update
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
GIGABIT ETHERNET DESIGN ECE Spring 2004
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Project GabE ECE 135 – Spring 2005 Week 9
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi

Progress Report Completed Division of Labor Drafted Gantt Chart using Microsoft Project Established weekly group meeting time Explored IEEE 802.3z standard Determined first group speaker

Division of Labor Standards Lead - Rahmin Secondary - Patrick Testing Lead - Patrick Secondary - Adam Solder Lead - Omar Layout Lead - Adam Secondary - Patrick Organization Lead - Adam Secondary - Rahmin Ordering Manager Lead - Omar Second - Adam / Rahmin

Gantt Chart

Laser Specifications Laser driver: MAX 3287 Maxim selector guide for MAX3286-MAX3296 The circuit can be configured for use with conventional shortwave (780nm to 850nm) as well as verticalcavity surface-emitting lasers (VCSELs)

IEEE 802.3z transmit

IEEE 802.3z receive

IEEE 802.3z Important standard test locations

Upcoming Week Continue background research Gain practical experience with testing equipment Test the evaluation board Begin building and testing the practice board Prepare budget