TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Overview Test Interface (TIU PCB‘s) are extremely expensive.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
The printed circuit board (PCB) design
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
TE-MPE-EP: REVIEW LS1: “Yellow racks” activities. Protection of 1232 dipoles and 392 quadrupoles TE-MPE-EP, VF, 02-June-2015.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
DQHDS Upgrade: Status of Hardware Design. Approach to implementation of the new heater measurement system. 08/06/2011V. Froidbise.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
Status of NA62 straw electronics Webs Covers Services Readout.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TE/MPE/EE - LHC Knud 8/3/2012 Project for Upgrade of the Electrical Circuits, the Powering Scheme and the Quench Heater Supervision for Enhanced Monitoring.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
S A Griffiths CM42 June 2015 Electrical & Control.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
DQLPUR Project Overview and Plans Review 30 November 2012
Considerations from machine protection and the ELQA teams
Detector building Notes of our discussion
Design of new generation CLIQ units (CLIQ2)
Injectors BLM system: PS Ring installation at EYETS
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Teleconference ACS – FREIA 17th October 2017
T1 Electronic status Conclusions Electronics Cards:
FMEA of a CLIQ-based protection of D1
MPE main activities planned for LS2
LS1 TE/MPE/EE CABLE ACTIVITIES
Mauro Morandin & Antoine Daël
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Parts exchange for HL-LHC AUP Q1&Q3
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci - I.N.F.N. Naples
Presentation transcript:

TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 J. Mourao T/MPE/EE 23 December 2012 LHC Machine -Why we do it during LS1 -Activity description -DQLPURs and the necessary resources -DQLIM required Resources -Showstoppers & Conclusion

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 Why we do it during LS1 J. Mourao T/MPE/EE 23 December 2012 LHC Machine -The physical state of the heater strips installed in the dipole magnets is unknown! They may have been damaged (partly cut) during the collaring process (when the main magnets where assembled in the factory). And the temperature cycles of the LHC machine (cool downs & warm-ups) may have increase de cut! -This uncontrolled cut can potentially give us a short : - Between the heater strip and the Earth - Between the 13 kA circuit and the Earth (magnet should be replaced). -That is why a heater strip diagnostic function has to be implemented as soon as possible(LS1)

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 Activity description J. Mourao T/MPE/EE 23 December 2012 LHC Machine -For this heaters strip diagnostic, It was decide to add a measurement of the DQHDS discharge current with the help of 4 current measurement transformers. We need a place to put those current transformers -The new electronics which will treat these new information (installed in the nDQLPU, MPE/EP side) needs to be powered We need a new power supply We will profit to add: - A mains power redundancy (UPS1/UPS2) - An increased reliability (with a linear power supplies design instead of the actual switch mode design)

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 Activity description (2) J. Mourao T/MPE/EE 23 December 2012 LHC Machine In the MPE/EE side, we have to prepare: 2700 DQLPUR (2464 in the LHC tunnel) 1300 DQLIM (1232 in the LHC tunnel) Courtesy of J.M Wickham

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLPURs and the necessary resources J. Mourao T/MPE/EE 23 December 2012 LHC Machine - To complete de the design we need help from:  MPE/EM (new PCBs version necessary)  Steve Pemberton and EPC team (powering test) - The 2700 units will be assembled and tested in the industry, the MS3911 market survey was launched to find a company able to build these units. We are actually thinking on the possibility of buying (by Cern means) the most expensive parts of the unit (toroid transformer, metallic case, heat sink) and supply these parts to the company chosen to assemble the units.  Cern people: Purchasing service, myself,… We have to build a test bench to send it to the chosen company for the test the 2700 DQLPURs. Hardware and software required  Zinur Charifoulline (for software), Mathieu Favre (hardware)

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLIM required Resources (1) J. Mourao T/MPE/EE 23 December 2012 LHC Machine - To complete de the design we need help from:  MPE/EM (jean Mark Wickham as almost finished the PCB drawing for the first DQLIM prototype, a second version of PCBs will probably be necessary at the beginning of the next year ) -The 1300 units will be assembled and tested at CERN We have to buy all the components (mechanical parts, connectors, PCBs,…)  Cern people: Purchasing service, MPE/EM,myself,…

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLIM required Resources(2) J. Mourao T/MPE/EE 23 December 2012 LHC Machine -Once the DYPB rack are at the surface, we need to recuperate the following items from the old Crawford box: -4 “DQHDS discharge” cables (connector + cable) -4 “DQHDS Monitor” (connector + cable) -4 “DQHDS 230V” (connector + cable) -1 ”Magnet VTAP” (connector + cable) -1 “magnet” harting connector -5 cable pass  This job will be done by a team of 4 people coming from Cracow (AGH university) during 4 month (starting in Mai) Remark: R.I.P. old Crawford boxes! We reached the no return point (to the present LHC configuration )! -Add a connector on one side of the above cables(marked in red)  MPE/EM or …

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLIM required Resources(3) J. Mourao T/MPE/EE 23 December 2012 LHC Machine -Wave soldering of the two sorts of PCBs (we have to supplies all de components that should be mounted on the boards)  Industry -Assembling of the 1300 DQLIM crates -Assembling the mechanical parts of the box -Mounting of connectors, transformers, and PCBs in the crate -Preparation of the internal cables and internal wiring of the DQLIM  MPE/EM Courtesy of J.M Wickham

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLIM required Resources(4) J. Mourao T/MPE/EE 23 December 2012 LHC Machine -Test the internal wiring of all the DQLIM crates (with MCT 192 cable tester + adaptor cables)  MPE/EE Mathieu Favre (tester preparation)  MPE/EE (to perform the tests) -Insert and wiring 1300 DQLIM crates in the DYPBs racks  A team of 4 people (AGH university)

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 DQLIM required Resources(5) J. Mourao T/MPE/EE 23 December 2012 LHC Machine -Functional test of the full DYPB racks (including our power cycle function)  MPE/EP & MPE/EE -Insulation test of the full DYPB racks  MPE/EP & MPE/EE

TE/MPE/EE DQLPUR & DQLIM assembling during LS1 Showstoper & Conclusion J. Mourao T/MPE/EE 23 December 2012 LHC Machine Potential showstoppers or warning ? -Parts definition (measurement transformer) -Purchasing times (big amounts of money in our orders) -Parts delivery time -Underestimation of the work to be done! (& required time) Conclusion A lot of work! He should not loose our time!