High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.

Slides:



Advertisements
Similar presentations
Interface between WPs inside FP7 HiLumi and WPs/Systems outside Lucio Rossi HL-LHC Project Coordinator CERN HiLumi/LARP collaboration Meeting 17 November.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
LHC upgrade plans Lucio Rossi CERN Acc.&Tech Sector, TE Dept.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
General Considerations for the Upgrade of the LHC Insertion Magnets
Thursday Summary of Working Group I Initial questions I: LHC LUMI 2005; ; ArcidossoOliver Brüning 1.
HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011.
CERN- KEK about LHC upgrades programs Lucio Rossi 14 December 2011.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
LHC High Luminosity Upgrade plans (including introduction to FP7 Hi-Lumi Design Study) Lucio Rossi CERN sLHC-PP Public CERN 8 March 2011.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The High Luminosity LHC Project
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
R. Ostojic, IRP1 CD Review, 31 July 2008 LHC IR Upgrade Phase I Goals and Constraints 1.Upgrade goals and milestones 2.Upgrade of IR systems: main constraints.
Design Study High Luminosity LHC (HL-LHC) Collaborative Project FP7-INFRASTRUCTURE-2010 By Lucio Rossi – CERN 1st CERN 20 July.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN, 11th November 2011 Hi-lumi meeting
High Luminosity LHC (HL-LHC) and Magnet progress
SLHC –PP WP6 LHC IR Upgrade - Phase I.
The R&D programme on High Field Magnets (HFM)
FP7-HiLumi LHC Design Study Summary and Feedback
Overview Summer student lectures 2016
e-lens Readiness Review Introduction
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
The HL-LHC project, and associated Cryogenics
The HL-LHC project: info day for industry
HL-LHC project overview
Beam-Induced Energy Deposition Studies in IR Magnets
Task 2.3 Particle simulations studies
High Energy High Intensity Hadron Beams
Review of Quench Limits
Presentation transcript:

High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010

From September 2010 HL-LHC formed as CERN project Int. Lumi by end of 2019: 200 fb -1 Or (positive assumption to reach L= 2·10 34 ) 300 fb -1 Crab Cavity Workshop

Physics reason for an upgrade Crab Cavity Workshop

Two lines for the upgrade Beam current Beam structure Low  * and good geometric factor Levelling. The experiment has stated that working with L peak > 5  would pose a challenge extremely uncertain Courtesy E. Todesco Crab Cavity Workshop

Technical reasons for an upgrade R2E (Radiation To Electronics) may be a killer above a certain threshold Limitation of P5 Left Triplet cooling (because of presence of SCRF in P4 Right using the same cryoplant) Possible limitation in Inner triplet cooling at  because of choked Heat Ex. Tube (and additional thermal links) Limitation of cryoplant and magnet stability (just without margin at ultimate lumi) Lack of flexibility: arc-IR fully cryocoupled Magnet radiation damage at fb -1 Crab Cavity Workshop

Critical technologies for HL-LHC 13 T Magnets- GW SC cables- Crab Cavities SC Magnets beyond 10 tesla of accelerator qualities. Inner triplets Quads and D1/D2 dipoles D1 could be the KEK design-contribution New step forward in circular accelerators ! Sc links for 200 kA-5 kV (1 GW DC) To remove from tunnel Magnet Power Supply, sensible to radiadiation To easy integration in crowdy zone To remove form tunnel the DFB (Current Leads) and easy operation and maintenance Crab Cavities at 400 MHz New equipment for accelerators, and even more difficult for LHC (very compact) An asset also for LC ! Crab Cavity Workshop

The goal of HL-LHC Crab Cavity Workshop

First action of HL-LHC: 11 T LHC dipole Make room for collimation beyond P3 Crab Cavity Workshop8 In we plan to move 28 cold equipments Later on this will be avoided, but an alternative solution is studied in HL-LHC: A 11T LHC MB (twin) Collaboration with Fermilab A warm collimator sitting on a cold by-pass Here cryocollimators could be accomodate

H-LHC change in layout in the IR Dispersion suppressor Matching sectionSeparation dipoles Final focus Today: 6 x 3 m x1.5 T; h=80 mm HL-LHC: 1 x 4 m x 7 T; Ø=150 mm Today: Two-in-One Ø =56 mm; 4.2K HL-LHC: Two-in-One Ø70 mm; 1.9 K Today: Q4 Two-inOne Ø=70 mm, 4.2 K; D2 ↑↑ 9 m x 3.5 T, 4.2 K HL-LHC: Q4 Two-in-One Ø=90 mm, 1.9 K; CRAB CAVITY ; D2 ↑↑ 9 m x 5 T; 1.9 K Today MQX: 4 x 6 m, Ø=70 mm; HL-LHC MQX: 4 x 8 m x; Ø=150 mm Crab Cavity Workshop

High Lumi EU FP7 Design Study 4 year program CERN CEA, CNRS, Desy, INFN (Mi&LNF), CSIC (UniValencia), UniLAN, UniLiv, UniMan, RH UniLon, STFC, EPFL, BINP KEK LARP: BNL, FNAL,LBNL, SLAC and ODU (Jlab) Application to EU: 25th Nov 2010 Answer for April 2011 to start fall 2011 WP4: Crab Cavities. In 2010 crab cavities changed status from useful – extravagant – tool for a future upgrade to the status of critical element at the heart of the HL-LHC project  Increased consciousness of the responsibilty of CC community needed  Focussed R&D mode (less workshop?) Decision on magnet dogleg for Local scheme is never too early… Installation PDR preparation mChoice TDR Approval Construction HiLumi LHC Crab Cavity Workshop

Value of the FP7 DS study Crab Cavity Workshop

Governance of the whole HL-LHC collaboration HL-LHC is larger than the FP7 design study application (named HiLumiLHC). But the project structure is unique, some WPs are inside FP7 and soem are not, implemented by MoUs Crab Cavity Workshop

WPs (further WP will be added) and cost Tentative Cost Evaluation Cost of FP7 Design Study (HiLumi LHC): 40 MCHF Cost of total HL-LHC design study : 20 MCHF Cost of HL-LHC project : 700 MCHF (500 MCHF manufacture, assembly, installation) Crab Cavity Workshop