1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
RPC Readiness for Data-taking RPC Collaboration 1.
MDT PS DCS for ATLAS Eleni Mountricha
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
AS- CCR Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
“Breve” stato dell’apparato: Risultati e Problemi Anton, Ian, Nicolas, Saleh, Salvatore Barrel Endcap Endcap Endcap Cooling Endcap Cooling Last Minute.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Geneva CMS Week, RPC Operation Review Anton Dimitrov RPC Detector Review Hardware Status and New Technical Procedures.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
CMS Detector Control Room Barrel Endcap YB-2 YB-1 YB0 YB+1 YB+2 Far tower Near tower Rack X4V22 Rack X3V22 Rack X2V22 Easy crate Link box Na tym rysunku.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Cables for the RE4 Upscope in CMS
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
RPC Barrel HV & LV system Lappeenranta University
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CSC Electronics Installation and Commissioning CSCE I&C
23 Barrel chambers and 12 Endcap chambers
HV-LV-DCS Status NEWS DCS Endcap Integration
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
DQM for the RPC subdetector
on behalf of Barrel RPC Collaboration
Resistive Plate Chambers performance with Cosmic Rays
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
23 Barrel chambers and 12 Endcap chambers
RPC approved plots.
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari

Marcello Maggi 7/12/ RPC GAS Distribution System HV Easy Crate System GAS Close Loop T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB THE RPC TRIGGER SYSTEM

Marcello Maggi 7/12/ RPC GAS Simple System HV SY1527 System GAS Close Loop?? T,Thrs Prelim. Chamber DCS Conf DB On-flight Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Prelim. Trigger DCS X-DAQ Event dump LV SY1527 System HzMeter noise SECTOR COMMISSIONING

Marcello Maggi 7/12/ Status of RPC Commissioning  W+2 Completed (except horiz. Sectors)  W+1 Completed (except horiz. Sectors)  W0 Sector 4 and 5 to completion Sector Test are done before final cabling RPC BARREL

Marcello Maggi 7/12/ Status of RPC Commissioning  RE+3 pre-commissioned  RE+2 pre-commissioned  RE+1 pre-commissioned  RE-1/2 pre-commissioned Missing Front-End functional and read-out test and cooling test. Few gas leakages to be fix and understood Commissioning needs a clear resource allocation and commitments RPC ENDCAP

Marcello Maggi 7/12/ RPC GAS Distribution System HV Easy Crate System T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB TOWER TEST

Marcello Maggi 7/12/ Tower Test On going Tower Test on Near Side Half Wheel +1 Step 1) Cabling: connectivity, CCU chain Step 2) LV up: grounding and functionalities Step 3) HV up: stability Step 4) Data Acquisition: performance, full chain Use of the MTCC set-up in Green and Balcony Barracks new

Marcello Maggi 7/12/ MTCC

Marcello Maggi 7/12/ B=3.8T Th=220mV B=3.8T Th=205mV B=0T Th=220mV MTCC preliminary results 10 Ottobre Entries Mean RMS OF 0 19 Ottobre Entries Mean RMS OF Ottobre Entries Mean RMS 11.1 OF 119 NOISE Noise stable during entire period

Marcello Maggi 7/12/ MTCC preliminary results EFFICIENCY HV = 8.5 kV HV = 9.0 kV HV = 9.2 kV HV = 9.4 kV HV = 9.6 kV DT Segment extrapolation to RPC

Marcello Maggi 7/12/ MTCC preliminary results Start using stand-alone RPC reconstruction Studied RPC 3  RESIDUALS

Marcello Maggi 7/12/ Use of RPC MTCC results Dedicated Cosmics MC production Comparison Data Vs MC Improve the model of the simulation RPC Trigger and Reconstruction performance with realistic simulation

Marcello Maggi 7/12/ RPC Technical Trigger LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox 1 RBC/ 2 sectors UXC area Barrel Wheel USC area TTU VME Crate 10 Optical Ribbons Receiving panel 1 Optical Ribbon/Half wheel Fiber Commissioned In preparation

Marcello Maggi 7/12/ DQM 3 Modules developed Digi used tested on FF Efficiency Barrel done Sync Specific Trigger Studies

Marcello Maggi 7/12/ DCS HV/LV Data stored on and retrieved from OnlineDB Important for off-line RPC performance analyses HV components sensitive to temperature to be understood

Marcello Maggi 7/12/ GAS SYSTEM Prototype Closed Loop under test at ISR Many results to report, and to understand New-Binos stability feature “cured” On going Commissioning of Distributors Gas Gain Monitor to be set-up

Marcello Maggi 7/12/ Conclusion Clear set of performance benchmark Sector Test on Barrel going smoothly Tower Test ala MTCC in preparation now Time to devote more effort on SW Few items to follow up closely