1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari
Marcello Maggi 7/12/ RPC GAS Distribution System HV Easy Crate System GAS Close Loop T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB THE RPC TRIGGER SYSTEM
Marcello Maggi 7/12/ RPC GAS Simple System HV SY1527 System GAS Close Loop?? T,Thrs Prelim. Chamber DCS Conf DB On-flight Cabling Patch Panels LBB TBC DCC X-DAQ Sorter Prelim. Trigger DCS X-DAQ Event dump LV SY1527 System HzMeter noise SECTOR COMMISSIONING
Marcello Maggi 7/12/ Status of RPC Commissioning W+2 Completed (except horiz. Sectors) W+1 Completed (except horiz. Sectors) W0 Sector 4 and 5 to completion Sector Test are done before final cabling RPC BARREL
Marcello Maggi 7/12/ Status of RPC Commissioning RE+3 pre-commissioned RE+2 pre-commissioned RE+1 pre-commissioned RE-1/2 pre-commissioned Missing Front-End functional and read-out test and cooling test. Few gas leakages to be fix and understood Commissioning needs a clear resource allocation and commitments RPC ENDCAP
Marcello Maggi 7/12/ RPC GAS Distribution System HV Easy Crate System T,Thrs Chamber DCS Conf DB Final Cabling Patch Panels LBB TBC DCC X-DAQ Trigger DCS X-DAQ Event dump LV Easy Crate System RBC Technical Trigger Cond DB TOWER TEST
Marcello Maggi 7/12/ Tower Test On going Tower Test on Near Side Half Wheel +1 Step 1) Cabling: connectivity, CCU chain Step 2) LV up: grounding and functionalities Step 3) HV up: stability Step 4) Data Acquisition: performance, full chain Use of the MTCC set-up in Green and Balcony Barracks new
Marcello Maggi 7/12/ MTCC
Marcello Maggi 7/12/ B=3.8T Th=220mV B=3.8T Th=205mV B=0T Th=220mV MTCC preliminary results 10 Ottobre Entries Mean RMS OF 0 19 Ottobre Entries Mean RMS OF Ottobre Entries Mean RMS 11.1 OF 119 NOISE Noise stable during entire period
Marcello Maggi 7/12/ MTCC preliminary results EFFICIENCY HV = 8.5 kV HV = 9.0 kV HV = 9.2 kV HV = 9.4 kV HV = 9.6 kV DT Segment extrapolation to RPC
Marcello Maggi 7/12/ MTCC preliminary results Start using stand-alone RPC reconstruction Studied RPC 3 RESIDUALS
Marcello Maggi 7/12/ Use of RPC MTCC results Dedicated Cosmics MC production Comparison Data Vs MC Improve the model of the simulation RPC Trigger and Reconstruction performance with realistic simulation
Marcello Maggi 7/12/ RPC Technical Trigger LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox RBC LBBox 1 RBC/ 2 sectors UXC area Barrel Wheel USC area TTU VME Crate 10 Optical Ribbons Receiving panel 1 Optical Ribbon/Half wheel Fiber Commissioned In preparation
Marcello Maggi 7/12/ DQM 3 Modules developed Digi used tested on FF Efficiency Barrel done Sync Specific Trigger Studies
Marcello Maggi 7/12/ DCS HV/LV Data stored on and retrieved from OnlineDB Important for off-line RPC performance analyses HV components sensitive to temperature to be understood
Marcello Maggi 7/12/ GAS SYSTEM Prototype Closed Loop under test at ISR Many results to report, and to understand New-Binos stability feature “cured” On going Commissioning of Distributors Gas Gain Monitor to be set-up
Marcello Maggi 7/12/ Conclusion Clear set of performance benchmark Sector Test on Barrel going smoothly Tower Test ala MTCC in preparation now Time to devote more effort on SW Few items to follow up closely