Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, 20-21 July 2007.

Slides:



Advertisements
Similar presentations
1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Advertisements

Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
André Augustinus 16 June 2003 DCS Workshop Safety.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
André Augustinus 16 September 2002 Safety issues.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu.
PHOS progress in LS1 Alexander Vinogradov 11 August 2014.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
RM->HTR cabling organization pawel de barbaro, apr , Agreed on april-20, 2006.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting December 2008 Monastir, Tunisia.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
Aug 4, 2005 Hcal sx5 status/issues. overview CCM temperature readout DAQs for sx5hcal HCAL installation status SATOCRICH.
ELENA installation progress F. Butin / ELENA collaboration.
PIXEL CAEN Installation Status
DCS: Temperature Probes
DCS: Temperature Probes
Electronics for RPC Upscope
Pierluigi Paolucci - I.N.F.N. Naples
CSC Electronics Installation and Commissioning CSCE I&C
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
Florida Atlantic University
February 2007 Note: Source:.
2015 January February March April May June July August September
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007

YB+2 All the surface installation work completed Pre-commissioning of the YB+2 completed during MTCC in 2006 YB+2 lowered in 2006 HV cables laid from control room to the detector and terminate into the splice box Signal and slow control cables laid from control room to the optical patch panel

YB+1  All the surface installation of work on this ring completed  YB+1 lowered in Jan-2007  HV cables laid from control room to the detector and terminate into the splice box  Signal and slow control cables laid from control room to the detector hall and terminated into the optical patch panel

YB0 All the surface installation of work completed YB0 lowered in March-2007 HV cables laid from control room to the detector and terminate into the splice box for 8 out of 12 RBXes Megatiles cable protection panels partly installed for 8 RBXes

YB-1 All the surface installation work completed Pre-commissioning completed in June-2006 To be lowered in October 2007

YB-2 5 out of 6 RBXes installed LV, JV, Signal and DCS cable instaleed for 5 out of 6 RBXes YB-2 to be lowered in October 2007

Future plans Commissioning of YB0 –July-Aug Installation and pre-commissioning of YB-2 –July-Sep Commissioning of YB+1 and YB+2 –Sep.-Oct. 2007? Commissioning of YB-1 and YB-2 –Nov.-Dec 2007