1 JWST Functional Flow Diagrams and Schematic Block Diagrams.

Slides:



Advertisements
Similar presentations
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Advertisements

Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
KU Leuven MIRI team meeting
Astronaut-Aided Construction of a Large Lunar Telescope Background Concepts for large astronomical facilities to follow the Next Generation Space Telescope.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
Mission Operations and Data Flow Overview Koji Mukai Astro-E2 Guest Observer Facility.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
Space Systems Engineering: System Architecture Module System Architecture Module Space Systems Engineering, version 1.0.
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Today’s APODAPOD  Read NASA website:  solarsystem.nasa.gov solarsystem.nasa.gov  IN-CLASS QUIZ THIS FRIDAY!!  Solar Lab, Kirkwood, Rooftop this week.
DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries.
High Altitude Scientific Ballooning (Near Space Engineering)
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
2-1 DMS Requirements Status Daryl Swade DMS Systems Engineer Nov. 6, 2013 S&OC Data Management System Design Review 3.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
Solar B Mission Operations Working Group - 3 February Page 1 SS Instrument Operations for TIMED, Cluster, & Stereo C. P. Holmes Sun-Earth Connection.
LRO Mission Concept of Operations Summary Version 1.0 (Preliminary) April
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Nov JWST Data Management Systems Gretchen Greene.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
LRO SRR LRO Mission Overview.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
Presented by V.Kokila I.Nancy. Telemetry & monitoring A system that reliably and transparently conveys measurement information from a remotely located.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
& Eric P. Smith HST/JWST Program Scientist Astrophysics Division NASA Headquarters.
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
Commissioning is 6 very busy months
Maxim Pathfinder Prework 16 August 1999
James Webb Space Telescope
Ground Segment for WSO/UV
Polar Orbiting INfrared Tracking Receiver Overall Mission Review
Attitude, Lunar Transfer Phase
SLAC DOE Program Review
Launch and On-orbit Checkout
The STEREO Space Weather Broadcast
Presentation transcript:

1 JWST Functional Flow Diagrams and Schematic Block Diagrams

2 JWST Operational Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned

3 JWST Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned Perform Fault Detection and Correction Generate and Distribute Power Maintain Observatory Temperatures Protect Observatory Components from Environments Collect, Process & Store Engineering DataDownlink Engineering DataEvaluate and Trend Engineering Data Plan Engineering ActivitiesUplink CommandsProcess, Store & Distribute Commands Determine Orbit &

4 JWST Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned Perform Fault Detection and Correction Manage Observatory Momentum Point the Observatory Generate and Distribute Power Maintain Observatory Temperatures Protect Observatory Components from Environments & Collect, Process & Store Engineering DataDownlink Engineering DataEvaluate and Trend Engineering DataPlan Engineering ActivitiesUplink CommandsProcess, Store & Distribute Commands Determine Orbit Separate from LV Deploy SA and Acquire Sun Null Rates Deploy HGA Deploy Aft & Forward Sunshield Deploy OTE Tower Deploy Sunshield Deploy SMSS Deploy PM Wings Perform MCC1

5 JWST Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned Perform Fault Detection and Correction Manage Observatory Momentum Point the Observatory Generate and Distribute Power Maintain Observatory Temperatures Protect Observatory Components from Environments & Collect, Process & Store Engineering DataDownlink Engineering DataEvaluate and Trend Engineering DataPlan Engineering ActivitiesUplink CommandsProcess, Store & Distribute Commands Determine OrbitPerform MCC2 Perform L2 Orbit Insertion OTE WF Alignment and PhasingISIM and SI Initialization and Calibration Acquire Targets Manage Vibration Maintain Fine PointingSmall / Medium Angle Maneuver &

6 JWST Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned Perform Fault Detection and Correction Manage Observatory Momentum Slew the Observatory Generate and Distribute Power Maintain Observatory Temperatures Protect Observatory Components from Environments & Collect, Process & Store Engineering DataDownlink Engineering DataEvaluate and Trend Engineering DataPlan Engineering ActivitiesUplink CommandsProcess, Store & Distribute Commands Determine OrbitPerform Orbit Maintenance Perform WFSC Plan Science Operations Perform Science Observations Perform SI Calibrations Uplink Observation Plan Process / Store Science Data Downlink Science Data Ground Process Science Data Generate Observation Plan Cmds & Acquire Targets Manage Vibration Maintain Fine PointingSmall / Medium Angle Maneuver &

7 JPL Deep Space Network (DSN) JWST Communications System Architecture GSFC Flight Dynamics Facility (FDF) STScI Science & Operations Center (S&OC) Flight Operations Subsystem (FOS) Data Management Subsystem (DMS) Wavefront Sensing & Control Exec (WFSC Exec) Proposal Planning Subsystem (PPS) Operations Script Subsystem (OSS) Project Reference DB Subsystem (PRDS) Observatory Simulators (OTB/STS) Madrid NASA Integrated Services Network (NISN) L2 Point Launch Segment Observatory Segment L2 Transfer Trajectory Ground Segment GoldstoneCanberra L2 Lissajous Orbit The launch vehicle injects observatory into an L2 transfer trajectory The observatory operates at L2 point for 5 years with a goal of 10 years, providing imagery and spectroscopy in the Near and Mid Infrared wavebands. The Ground Segment receives downloads of science data and sends command uploads during daily 4 hour contacts Ground Segment uploads plans to the Observatory ~once a week and the observatory autonomously executes these plans NASA Provided Communication Asset for Early Orbit Phase

8 Observatory Schematic Block Diagram

9 JWST Phases and System Functional Breakdown Pre-Launch Phase Approval to ship to the Launch Site Final Count Down Start Launch Phase Deployment & Trajectory Correction Phase Cruise & Commissioning Phase Observatory Sep from LV Primary & Secondary Mirror Deployment Normal Science Operations Phase Observatory Commissioned Perform Fault Detection and Correction Manage Observatory Momentum Point the Observatory Generate and Distribute Power Maintain Observatory Temperatures Protect Observatory Components from Environments And Collect, Process & Store Engineering DataDownlink Engineering DataEvaluate and Trend Engineering DataPlan Engineering ActivitiesUplink CommandsProcess, Store & Distribute CommandsDetermine OrbitPerform Orbit Maintenance