March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.

Slides:



Advertisements
Similar presentations
Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Advertisements

Goals for 2003 Kansas Interconnection Standards Development Larry Holloway Chief of Energy Operations Kansas Corporation Commission.
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Distributed Generation (DG)
2013 Statewide BIP Load Impact Evaluation Candice Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
GPA Renewable Energy Resource for Guam Power Authority
Cameron County Distributed Renewable Energy Technology Stimulus Grant Robert Lopez | February 18, 2011.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
Confidential Draft 2012 PG&E Wholesale Distribution Tariff (WDT) Generator Interconnection Procedures (GIP) Changes Electric Generation Interconnection.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Interconnection of Distributed Generation
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Containing the Cost of California’s RPS Yuliya Shmidt, Senior Analyst February 2, 2012.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Topics to Cover Interconnection Process Overview
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
SCE Grid Interconnection Workshop
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
2014 Attachment O True-Up Customer Meeting August 25, 2015.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
2009 Bidders Workshop Attachment D August 3, 2009.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
SOUTHERN CALIFORNIA EDISON SM Local Capacity Requirements (LCR) RFO for New Resources and Other SCE Solicitations Stu Hemphill September 26, 2013.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
1 Combined Heat and Power (CHP) Settlement Overview Power Association of Northern California Luncheon, November 9, 2010 Frank Lindh General Counsel California.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
1 Service Delivery Point(s) for Multi-tenant Facilities An Overview Matt Imel Sr. Tariff Specialist PG&E December 8, 2011.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Standards Review Subcommittee Update August 17, 2010.
Public Service Commission of Utah Workshop 12/4/2007 Generation Interconnection Utility perspective Rocky Mountain Power Les Bahls, director transmission.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Distributed Generation Registration June 30, 2008.
RENEWABLE ENERGY PROCUREMENT February 6, PROGRAM OVERVIEW In 2002, just 1% (141,026 MWh) of SDG&E’s portfolio was from renewables. In 2002, SDG&E.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
QC9 Application Process SOUTHERN CALIFORNIA EDISON SM Welcome to Queue Cluster 9 Monday, April 4, 2016.
Detroit River International Crossing Project March 31, 2010.
Updating the MA DG Interconnection Report DOER analysis of the Utility reporting of DG interconnection projects following the Expedited and Standard Review.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Recent Activities for LIEE and CARE November 2007 Proposed decision submission (R ) Proposed decision submission (R ) IOU reporting.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
LNBA Subgroup: Avoided Transmission Value
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Preliminary Electricity Rate and Time of Use Rate Scenarios
Grid Code Review Panel 16th August 2017
CPUC Rate Proceedings Relevant for TOU
Proposal for Distribution Group Studies
IID Generating Facility Interconnection Process
SunZia Project Description
Rule 21 Working Group 2 Issue 6 subgroup
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Annual Attachment O Stakeholder Meeting
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Annual Attachment O Stakeholder Meeting
Annual Attachment O Stakeholder Meeting
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers

1 Document Conflicts The purpose of this document is to provide a general overview of the interconnection process This presentation is intended to be a summary level discussion of the information and requirements and does not include all of the detailed information For detailed information, visit PG&E’s Generation Interconnection Services website at: wer/wholesalegeneratorinterconnection/#thesmallgeneratorinterconnectionproc eduresfortransmissionsysteminterconnectionstransmissionsgip To the extent that there are any inconsistencies between the information provided in this presentation and the requirements discussed on PG&E’s Generation Interconnection Services (“GIS”) website, the information posted on the GIS website shall govern

2 Wholesale Generation Interconnection Processes Overview of Wholesale Generation Interconnection Processes Overview of Interconnection Timeline –Fast Track –Independent Study –Cluster Process

3 Wholesale Generation Interconnection Process Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Generator responsible for timely applications and timely completion of applicable processes. Not part of RFO solicitation Transmission Interconnections –Governed by California Independent System Operator Corporation (CAISO) Tariff PG&E’s transmission interconnections are for 60 kV and higher All applications must be submitted to the CAISO Distribution Interconnections –Governed by PG&E’s Wholesale Distribution Tariff (WDT) PG&E’s distribution voltage level is defined as facilities operating below 60 kV All applications must be submitted to the appropriate interconnecting utility.

4 Wholesale Interconnection Study Processes IOU processes vary slightly Fast Track Independent Study Process Cluster Study 2 MW on 12kV and 3 MW on 21 kV and 5 MW on higher voltages Fast Track Screens Electrical Independence Screens Commercial Operation Date Screen (CAISO) No MW limit Financial security requirements Default process, no MW limit One annual study Financial security requirements Independent Study Process and Cluster Process Interconnection Requests may apply for full capacity deliverability. Deliverability assessment will be conducted by CAISO in CAISO’s cluster process. Initial and Supplemental Review System Impact and Facilities Study Phase I and II Studies

5 CAISO* Cluster GroupWindowPhase IPhase II Interconnection Agreement 1 & 2ClosedCompleted Completed August 2011 Target December ClosedCompleted Target October 2012 Target February ClosedJanuary 2012 Target December 2012 Target February Oct/Nov 2011* and March 2012 Target October 2012 Target July 2013 Target November 2013 PG&E WDT ClusterWindowPhase IPhase II Interconnection Agreement 4DClosedJanuary 2012 Target December 2012 Target February D Oct/Nov 2011** and March 2012 Target October 2012 Target July 2013 Target November 2013 Cluster Schedule – Application through Final Study Note*: PG&E does not have an October/November 2011 window but will discuss potential applications with developers. Note**: Subject to CAISO Tariff.

6 Fast TrackWindowInitial Review Supplemental Review Interconnection Agreement Timeline CAISO* connections No Window15BD10BD4 months~6 months PG&E connections No Window15BD10BD4 months~6 months Independent Study WindowSISFAS Interconnection Agreement Timeline CAISO* connections No Window90BD 4 months~12 months PG&E connections No Window60BD 4 months~12 months Fast Track and Independent Schedule – Application through Final Study CAISO Process applies to SCE and SDG&E as well, IOU processes vary slightly Note*: Subject to CAISO Tariff. Note: BD = business days

7 Post- Interconnection Agreement Post Interconnection Agreement, PG&E and Interconnection Customer will be engineering and designing, procuring, and constructing the electrical interconnection –PG&E will engineer the Capital Improvements as agreed upon in the Interconnection Agreement –Interconnection Customer will engineer the electrical system on the Interconnection Customer’s side of the meter and any upgrades that will be applicant built and deeded (if required) Post EPC, PG&E, CAISO (if applicable), and Interconnection Customer will coordinate a pre-parallel inspection and commissioning to achieve Commercial Operation Timing for implementation is project specific and could take from 6 months to 4 years