1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.

Slides:



Advertisements
Similar presentations
Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
Advertisements

KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
G2P Target installation and Beyond. Schedule Pivot before.
Magnets for the ESRF upgrade phase II
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Solar Cell conductive grid and back contact
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Carbon for SPS, state or the art and scrubbing runs, P.Chiggiato, P.Costa Pinto, P.Cruikshank, J.Ferreira Somoza, H.Neupert, A.Sapountzis, M.Taborelli,
SR Vacuum Systems and Front Ends
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
Cornell ERL Vacuum System as a Model for ILC Damping Vacuum System Conceptual Design Yulin Li & Joe Conway C ornell L aboratory for A ccelerator-based.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
Status of the Diamond Light Source upgrade EuCARD2 topical workshop Barcelona, 23 April 2015 R. Bartolini. A. Alekou, M. Apollonio, R. Fielder, I. Martin,
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Michael Hahn reporting for Jean-Louis.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
Key technologies of vacuum chamber for future Accelerators --NSRL Vacuum Group
Cost Evaluation of Storage Ring Magnets Claudio Sanelli March 19, 2012.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Concepts Beyond the Neutrino Factory Baseline Design Detector R&D Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli.
Slide: 1 Workshop on Accelerator R&D for USR Beijing, 30 Oct – 1 Nov., 2012 Some engineering considerations for USR light sources L. Zhang European Synchrotron.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
10/2/ STP R&D coordination meeting 04 2 FCC-ee vacuum System R. Kersevan CERN-TE-VSC-VSM.
SPS High Energy LSS5 Thermal contact & cooling aspects
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
Long Term Plans at MAX IV
Report Technical Director Storage-Ring-Installation Completed
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
CEPC Vacuum System Dong Haiyi 2017/11/5.
Magnets for the ESRF upgrade phase II
CLIC damping rings working plan towards the CDR
Presentation transcript:

1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation Light Sources, Barcelona, Sept 2005

2 Status of NEG-Coated ID Chambers for RUN 05-4 (18/8 – 17/10/2005): NEG-COATED CHAMBERS: 10 mm ALU CV5073: 11x 15 mm ALU CV5073: 2x 15 mm ALU CV2093: 4x 10 mm SS CV5175: 1x Total NEG-coated length, m: 79.5 NO ADVERSE EFFECT ON RESISTIVE-WALL IMPEDANCE* LONG-TERM STABILITY (>5 YRS) ESTABLISHED PROGRAM OF UPGRADE OF REMAINING (6+1) 15-19mm CHAMBERS (SS  NEG/Al) UNDERWAY * T. Perron, “Single Bunch-Related Impedance Measurements on the ESRF Storage Ring", PhD thesis, November 2005, Université Joseph Fourier, Grenoble

3 Cross-Sections of NEG-Coated ID Chambers: “10mm” SS CV5175 (50x8mm 2 version) 1 left in the ring (ID28), obsolete design “15mm”extruded-Al CV5073/2093 (2x CV x CV2093) “10mm”extruded-Al CV5073 (11x CV5073) (CV2093 version under design)

4 “Pump-less”Quadrupole-Type Vacuum Chambers: Fact: The ESRF has in excess of 700 lumped pumps installed around the ring Q: “Does the vacuum engineer of a state-of-the-art SR light source need all those expensive, appendage pumps and the related power supplies and cabling?” A: “If we believe the results of 5+ years of machine operation at the ESRF (and Elettra), the answer might be ‘NO’ ” Proven fact: pump-less chambers, characterized by extremely low conductances, have been operated without major effects on the operation of the 6 GeV light source for over 5 years. Long-term issues settled: no need for re-activation unless vented. One chamber activated 6 times (vented 4), and still good Why? Because the NEG-coating technology has removed the need for appendage pumps, by reducing drastically the SR-induced gas load CV3 chamber of cell 6: 3.53 m long, 3 pumping ports, 2x GP x 45 l/s SIP installed; SS with OFH Cu absorber (brazing, eb-welding) Two types tested: Soleil extrusion and “Esrf-2” extrusion Prototypes coated in-house and installed in Cell 6 Vacuum and bremsstrahlung conditioning followed closely Both the Soleil-type and the ESRF-2 type have been successful

5 CV3-Type Vacuum Chambers, 3530 mm long: Standard CV3 chamber: 2xNEG + 1 SIP Hi-temp brazing of Cu absorber ; precision eb-welding of SS parts ESRF-2 extrusion: 30x20mm 2 (HxV) chamber NO pumps, only NEG-coating Soleil-type CV3: Al extrusion 70x35mm 2 ; NO pumps, only NEG- coating GP l/s StarCell

6 Vacuum and Bremsstrahlung Measurements of NEG-Coated Vacuum Chambers on cell 6/ID6: Each new NEG-coated CV5000 is pre-installed and pre-conditioned on ID6, where its bremsstrahlung level can be measured precisely (dedicated hutch). Very effective way (the only way) of characterizing vacuum inside the ID chamber The conditionings of Soleil- and ESRF-2-type CV3 chambers have been monitored on ID6’s hutch Extra gauges, measuring along the chamber RUN 05-1RUN 05-3

7 Vacuum Conditioning of a Standard ESRF-type CV3 Chambers: RUN 05-4: new CV3 RUN 02-1: new CV3

8 Comparison of Standard and Pump-less CV3s Conclusions: Comparable, if not better, pressures (PEN4) Comparably low, if not better, bremsstrahlung levels (not discussed in detail here) Much easier fabrication, lower cost NEG-coated types allow much smaller quadrupole and sextupole openings, ideal for advanced machine, with demanding lattices No need for many appendage pumps, and all that goes with them (cabling, power supplies, control software, etc…). Only places where ion-pumps would be needed is at (crotch) absorbers What is needed: A new project which dares implementing the pump-less concept on a global scale

9 ESRF: R&D and Chamber Production: A second NEG-coating tower is being commissioned now, and production of NEG-coated chambers for some of Soleil’s in-air IDs is underway New tower is equipped with 2m-long (1.9m effective length) solenoid, with increased field (first system has 1m-long, 80cm-effective length) New tower has movable upper fixation point, allowing easier handling of short chambers (Soleil, SLS) Still some open issues concerning quality of NEG coating: had to reject a couple of chambers (10mm extruded alu ESRF CV5073) Chemical stripping of NEG film seems to be the cause of some failures Testing Soleil’s quadrupole chambers (1556mm long, with pumping ports) on D31 Lower limit on the size/cross-section of ‘coatable’ chambers seems to have been reached: the 57x8mm 2 “10mm” cross-section: no way to coat smaller chambers, unless new technology is discovered

10 Many thanks to…: -The “NEG-Coating Team” – E. Burtin (software) F.Demarcq, I. Parat (deposition and assembly) M.Hahn, R.Kersevan (supervision, planning, D. Cognie, F. Bodart (mechanical set-up) V.Marion (Soleil contract) G. Debut (measurements on D31, D15) B. Plan (Mech.Engineering Group) (design of tools and chambers) The constant support and encouragement of the present (P.Elleaume) and past (JM. Filhol) machine directors is gratefully acknowledged