Report to TAC September 2008. In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
West to North CSC Location Scenario 3b WMS August 20, 2008.
Report to TAC October In Brief 2010 CREs 2010 CREs Working Group Reports Working Group Reports MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Report to TAC December In Brief Working Group Reports Working Group Reports DSWG DSWG CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
1 TAC Report to the ERCOT Board February 21, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
Report to TAC March In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
1 Business Integration Update to PRS October 18, 2012.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
Protocol Revision Subcommittee
August 25, 2016 TAC Update to COPS
TAC Report to the ERCOT Board
Technical Advisory Committee
Presentation transcript:

Report to TAC September 2008

In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007 MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces GATF GATF NQSTF NQSTF Joint Generation re-interconnection TF Joint Generation re-interconnection TF Other Reports Other Reports NOGRR 025 NOGRR 025 PRR 818 PRR 818

Working Group Reports CMWG 2010 Commercially Significant Constraints (CSC) 2010 Commercially Significant Constraints (CSC) WMS Recommendation: WMS Recommendation: Scenario WN2-4Z (ERCOT Recommendation) Scenario WN2-4Z (ERCOT Recommendation) 4 Zones 4 Zones W_N:Dynamic Stability interface N_W:Dynamic Stability interface N_S:Lake Creek-Temple/Tradinghouse- Temple Pecan Creek 345-kV double circuit S_N:Lake Creek-Temple/Tradinghouse- Temple Pecan Creek 345-kV double circuit N_H:Singleton-Obrien/ Singleton-TH Wharton 345-kV double circuit

Working Group Reports CMWG Scenario WN2-4Z Scenario WN2-4Z Clustered using the pre-contingency 2010 DSA SUM1 base case. This is a 4 zone scenario with the 2009 CSCs for N_S, S_N, and N_H; the N_W and the W_N CSC were modeled as the Dynamic Stability interface. Clustered using the pre-contingency 2010 DSA SUM1 base case. This is a 4 zone scenario with the 2009 CSCs for N_S, S_N, and N_H; the N_W and the W_N CSC were modeled as the Dynamic Stability interface. The Stability Limit monitored lines are: The Stability Limit monitored lines are: Graham – Cook Field Graham – Cook Field Jacksboro – Bowman Jacksboro – Bowman Graham – Tonkawa Graham – Tonkawa Bowman – Graham Bowman – Graham Comanche Switch – Red Creek Comanche Switch – Red Creek Graham – Long Creek Graham – Long Creek

Working Group Reports CMWG WMS – Vote for ERCOT Recommendation WMS – Vote for ERCOT Recommendation 24 votes all segments represented 24 votes all segments represented 1 Opposed / 20 In Favor 1 Opposed / 20 In Favor 3 Abstentions: IPM, Industrial Consumer & IOU 3 Abstentions: IPM, Industrial Consumer & IOU 95.1% (6.417) in favor 4.9% (0.333) opposed 95.1% (6.417) in favor 4.9% (0.333) opposed RECOMMEND: TAC Approve WMS Recommendation ERCOT a RECOMMEND: TAC Approve WMS Recommendation ERCOT a

Working Group Reports MWG SMOGRR007, Synchronization of Settlement Metering Operating Guide with PRR804, Revisions to Section 21 Appeal Process SMOGRR007, Synchronization of Settlement Metering Operating Guide with PRR804, Revisions to Section 21 Appeal Process Revises Section 10, Process for Settlement Metering Operating Guide Revisions, to provide that if a motion to approve a revision request fails, the revision request shall be deemed rejected by the body considering it and subject to appeal, unless at the same meeting that body later votes to recommend approval, remand, or refer the revision request. Revises Section 10, Process for Settlement Metering Operating Guide Revisions, to provide that if a motion to approve a revision request fails, the revision request shall be deemed rejected by the body considering it and subject to appeal, unless at the same meeting that body later votes to recommend approval, remand, or refer the revision request. This SMOGRR also proposes formatting and administrative changes. This SMOGRR also proposes formatting and administrative changes. WMS voted unanimously to approve MWG recommendation. WMS voted unanimously to approve MWG recommendation. RECOMMEND: TAC Approve SMOGRR007 as recommended by WMS RECOMMEND: TAC Approve SMOGRR007 as recommended by WMS

Working Group Reports QMWG AWS Truewind Outage Scheduler Tool AWS Truewind Outage Scheduler Tool AWS and ERCOT have established the ERCOT Wind Plant Availability Website AWS and ERCOT have established the ERCOT Wind Plant Availability Website Log in credentials have been mailed to all WGR QSE’s Log in credentials have been mailed to all WGR QSE’s Market notice sent indicating August 19 th for inclusion of the data Market notice sent indicating August 19 th for inclusion of the data Not too cumbersome with some practice…. may be able to make some improvement with user feedback. Not too cumbersome with some practice…. may be able to make some improvement with user feedback.

Working Group Reports QMWG Wind Generation Forecast accuracy analysis Wind Generation Forecast accuracy analysis QMWG to do more analysis of histograms and AWS data. Concerns raised regarding use of 80/20 forecast versus 50/50

Working Group Reports QMWG Ancillary Services Discussion Topics Ancillary Services Discussion Topics Market Participants request that ERCOT address the following issues and consider making revisions to the Ancillary Services methodology for Market Participants request that ERCOT address the following issues and consider making revisions to the Ancillary Services methodology for Net Load Methodology Net Load Methodology Use of trailing 90 days data Use of trailing 90 days data Load forecasting error or bias Load forecasting error or bias Wind forecasting – WGRPP at 80% Wind forecasting – WGRPP at 80% Ramp Rates for WGRs in the Nodal Market Ramp Rates for WGRs in the Nodal Market Nodal protocols do not limit the ramp rate of WGR’s or any Resources. Nodal protocols do not limit the ramp rate of WGR’s or any Resources. PRR 771 limited the ramp rate in the Zonal PRR 771 limited the ramp rate in the Zonal

Working Group Reports MCWG Review options for shared short-pay fund Review options for shared short-pay fund Three options identified – still under discussion Expanded loss mutualization Expanded loss mutualization under discussion ERCOT presented Potential Future Exposure Model to CWG and MCWG ERCOT presented Potential Future Exposure Model to CWG and MCWG Work towards PRR’s to provide to WMS for review Work towards PRR’s to provide to WMS for review

Working Group Reports VCWG White Paper: Units with no Maintenance History White Paper: Units with no Maintenance History Limited to Previously Commissioned units that are sold to another Entity within the last two years Limited to Previously Commissioned units that are sold to another Entity within the last two years Unit will be capped by a Proxy Resource Unit will be capped by a Proxy Resource If no Proxy Resource exists ERCOT will use Resource Actual Fuel Volumes and Generic Startup for O & M. If no Proxy Resource exists ERCOT will use Resource Actual Fuel Volumes and Generic Startup for O & M. Whitepaper endorsed by WMS Whitepaper endorsed by WMS White Paper: Treatment of Maintenance Labor Costs White Paper: Treatment of Maintenance Labor Costs Please comment on draft whitepaper – issued still under discussion at VCWG Please comment on draft whitepaper – issued still under discussion at VCWG

Working Group Reports VCWG NPRR174 – FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals NPRR174 – FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals TAC tabled to come up with value of Y, ERCOT provided comments (081209), gave formula and flowchart; the Resource entities will receive fuel costs at 110% of FIP, if costs within deadband do not get to recoup costs, but can recoup any costs above value of Y up to actual cost. TAC tabled to come up with value of Y, ERCOT provided comments (081209), gave formula and flowchart; the Resource entities will receive fuel costs at 110% of FIP, if costs within deadband do not get to recoup costs, but can recoup any costs above value of Y up to actual cost. WMS endorsed ERCOT comments to NPRR174 and recommended initial value of Y = 10% WMS endorsed ERCOT comments to NPRR174 and recommended initial value of Y = 10% Draft Nodal Verifiable Cost Affidavit Draft Nodal Verifiable Cost Affidavit REs and QSEs please have your legal depts. review - WMS will vote in September for October TAC REs and QSEs please have your legal depts. review - WMS will vote in September for October TAC

Working Group Reports Active Task Forces Generation Adequacy Task Force Generation Adequacy Task Force Adrian Pieniazek and Dan Woodfin, Co-Chairs Adrian Pieniazek and Dan Woodfin, Co-Chairs Nodal Quick Start Task Force Nodal Quick Start Task Force Seth Cochrane and Tom Jackson, Co-Chairs Seth Cochrane and Tom Jackson, Co-Chairs Joint ROS/WMS Multiple Interconnection Task Force Joint ROS/WMS Multiple Interconnection Task Force Leadership for WMS: Bob Wittmeyer Leadership for WMS: Bob Wittmeyer

Other WMS activity NOGRR 025 NOGRR 025 WMS considered Nodal Operating Guide Revision Request (NOGRR) 025. After discussion, WMS unanimously voted to endorse NOGRR025 as amended by the 7/30/09 ERCOT comments and as revised by WMS, including the selection of “Option 2” in Section 9.4.5, Resource-specific Non-Spinning Reserve WMS also reviewed the list the reports provided by ERCOT in its 8/11/09 comments. WMS unanimously voted to recommend that TAC be added to the list of parties that may request reports WMS unanimously voted to endorse the list with the request that three of the reports that ERCOT recommended be delayed until after the TNMID instead be made available for testing during market trials (i.e., green), or upon request on a limited basis if ERCOT has concerns about making such reports available for testing during market trials (i.e., yellow). WMS also requests that ERCOT provide additional information regarding the priorities and cuts it has chosen in making its report availability determination

Other WMS activity PRR 818 PRR 818 WMS considered Protocol Revision Request (PRR) 818. After discussion, WMS unanimously voted to endorse PRR818 as amended by the 8/18/09 Topaz Power Group comments, which avoid unintended consequences of amending definition of offline and online. RMR Exit Strategy Criteria RMR Exit Strategy Criteria RMR exit for Permian Basin units, recommended that towers be double circuit capable, towers were due to be replaced. Rather than replace twice – RMR Exit Delayed. WMS to prepare whitepaper to address RMR Exit Strategy Criteria Nodal Trading Points other than Hubs Nodal Trading Points other than Hubs Venus & Marion are no longer schedulable points in Nodal Venus & Marion are no longer schedulable points in Nodal Assigned to QMWG Assigned to QMWG

WMS 2009 Goals Item WMS input/direction needed by Nodal Market Transition On-going Nodal Verifiable Cost Methodology On-going (VCWG) Approved Zonal PRRs – Analysis and Prioritization Q1-Q2 Consideration of timely, economic improvements to Zonal Market Before Q4 Determine CSCs for 2010 Q3 (CMWG) Market Issues Related to: Credit issues On-going (MCWG) EILS and AS Markets On-going Integrating advanced meters & other demand response into Ancillary Service Markets On-going (DSWG) Wind & related renewable technology integration On-going (QMWG/RTWG)