LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC 8 - 19 Nov 2009Alessandra Lombardi.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
FFAG-ERIT R&D 06/11/06 Kota Okabe (Kyoto Univ.) for FFAG-DDS group.
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
1 Sensitivity of coupled laser- accelerated ion beams into conventional structures P. Antici, M. Migliorati, A. Mostacci, L. Picardi, L.Palumbo, C. Ronsivalle.
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Overview of the High Intensity Neutrino Source Jean-Paul Carneiro FNAL Accelerator Physics Department FNAL Accelerator Physics and Technology Seminar February.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Linac4 Status 1 M. Vretenar sLHC public event
J. TAN, M. SORDET, L. SØBY, F. GUILLOT-VIGNOT, D. GERARD, M. LUDWIG, D. STEYAERT BE/BI Linac4 Instrumentation Review 18th October 2011.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
HINS Linac Simulations : Benchmarking, Jitter and Stripping. Jean-Paul Carneiro FNAL Accelerator Physics Center Accelerator Physics and Technology Workshop.
LINAC4 transfer line – optics M. Eshraqi, L. Hein, A. Lombardi (BE-ABP) LINAC4 transfer lines : m (from PIMS out to foil); m new line,then.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
Linac4 DTL Beam Dynamics 1Jean-Baptiste Lallement – Mini-workshop on DTL design - 13/09/2011 Mini-workshop on DTL design – 13 September 2011 JB Lallement,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Welcome to the RFQ Meeting
Linac4 status and perspectives
The CERN Linac4 history, performance, perspectives
NICA injection complex status
Experience with beam instrumentation at Linac4
Updated with comments 22 may 2017 Updated again 29 June 2017
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
HIPPI yearly meeting, sep28-sep
Progress in the Multi-Ion Injector Linac Design
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
LINAC 4 source & LEBT measurement results
1- Short pulse neutron source
LINAC4 commissioning plans etc.
Muon Inverse Rotation and Acceleration
Progress towards Pulsed Multi-MW CERN Proton Drivers
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Advanced Research Electron Accelerator Laboratory
HiPoSpaNS High Power Spallation Neutron Source
commissioning and measurements
Beam Commissioning at ESS
MEBT1&2 design study for C-ADS
DTL M. Comunian M. Eshraqi.
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi

Layout and parameters Source beam : I=80 mA Alpha, Beta=-6.6, 0.36 m Emittance=0.25 pi mmmrad Energy= 45 keV Energy spread=1 keV (tot) Beam at injection foil: I=65 mA Alpha, Beta=less than 1.0, less than 10.0 m Emittance=0.4 pi mm mrad Energy =160 MeV (±1.2MeV ramping) Energy jitter = small as possible Energy spread= 100 keV (1sigma) D=0.0, -1.2 m ; Dp=0.05 Linac4 BCC Nov 20092Alessandra Lombardi

Layout LEBTRFQCHOPPERDTLCCDTLPIMSTransfer line Energy(MeV) Length (m) RF1 tank3 cavities3 tanks21tanks12 tanks1 cavity focusing2 Solen11 EMQ111 PMQ7 EMQ + 15 PMQ 12 EMQ17 quads 4 bends + old line To be set/tuned (till BHZ40) : 1)2 solenoids, 55 quads 2)48 steerers settings 3)22 amplitudes and phases THERE ARE ABOUT 150 PARAMETERS TO SET Linac4 BCC Nov 20093Alessandra Lombardi

Stages Pre-commissioning (now) : – Simulate the commissioning with multi-particle codes with the aim of Consolidate a strategy Verify that the diagnostic is appropriate (number position sensitivity) Verify the possibility of setting parametrs with beam-based measurements 3 MeV test stand (south hall) (from 2011): Commissioning up to 3 MeV – most critical part Verify that the diagnostic is appropriate (number position sensitivity) Verify the possibility of setting parametrs with beam-based measurements Linac4 commissioning (tunell): Recommission 3 MeV DTL tank1 – 12 MeV DTL tank2and 3 – 50 MeV CCDTL – 100 MeV PIMS – 160 MeV Transfer lines – 160 MeV Todays’ topic Linac4 BCC Nov 20094Alessandra Lombardi

Milestones MilestoneEnd-date 3 MeV test stand measurement plan; including RFQ commissioning. okMid 09 RF amplitude and phase setting with beam based measurements today2009 Setting up strategy for DTL.CCDTL. PIMS. today2009 Setting up strategy for transfer linesTo be addressed MeV test stand measurements MeV re-commissioning in tunnel Follow installation schedule and beam avaliability DTL commissioning in Tunnel CCDTL commissioning PIMS commissioning2013 Transfer line commissioning2014 Linac4 BCC Nov 20095Alessandra Lombardi