This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan.

Slides:



Advertisements
Similar presentations
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
ESS DTL beam commissioning
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
F Project X Overview Dave McGinnis October 12, 2007.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
NML Machine Protection System (MPS) Arden Warner Fermilab August 2 nd, 2007.
Other Utilities of ALBA LLRF
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
SNS linac beam commissioning By Michael Plum Spallation Neutron Source Oak Ridge National Laboratory ESS Workshop on beam commissioning April 8-9, 2014.
ApEx needs for CeC PoP Experiment December 11, 2015.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
ESS LLRF and Beam Interaction
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Planning the Experiment
RF operation of REX-ISOLDE
CLIC Study Aim Conceptual design report in 2010
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
RF Local Protection System
Beam Commissioning at ESS
RF systems introduction
Physics Design on Injector I
(Beam) Commissioning Plan
Beam Commissioning Planning
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan and Michigan State University. Michigan State University designs and establishes FRIB as a DOE Office of Science National User Facility in support of the mission of the Office of Nuclear Physics. Masanori Ikegami Michigan State University Discussion on Linac Commissioning

 Lessens learned from J-PARC linac commissioning (initial commissioning)  Comparison between simulation and experiment in J-PARC linac commissioning (initial commissioning) Outline M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 2

 After MEBT, there is no beam stop until straight dump 300 m downstream  Quadrupole can be adjusted to deliver a low energy beam to the dump (no PMQ)  We could deliver beam from DTL1 to the straight dump without beam steering  We could deliver beam to the straight dump during phase scan tuning without steering Risk of excess radiation or component damage mitigated Good Alignment Helps M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 3

 Average beam power is limited for beam commissioning  RF duty factor as designed from the beginning (except for RFQ) RF was stable through out the commissioning RF Stability Matters M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 4 Peak currentPulse widthRepetition Design30 mA0.5 ms25 Hz Initial commissioning 5 mA0.05 ms1 Hz RF for commissioning -0.6 ms25 Hz

 Experienced sparking problem of RFQ which limited the beam power of entire facility for long  The problem exposed only after starting high duty factor beam operation We should be aware of the risk of single point failure Critical component should be tested early and thoroughly Beware Risk of Single Point Failure M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 5

 Advantage of pre-commissioning IS to DTL1 pre-commissioned at KEK  Smooth initial commissioning All beam diagnostics tested  Feed-back to construction  Some key component was not available Digital LLRF system  Test of RFQ might not be enough Pre-Commissioning of Critical Items M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 6

 Importance of stringent cavity protection Radio Frequency Quadrupole (RFQ) discharging problem limited the beam power and beam availability for more than a year Poor vacuum and cavity damage due to discharging at the first high duty factor operation Extensive Test of Single Point Failure Necessary M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 7 Low power operation due to RFQ discharging problem Careful interlock / Machine Protection System (MPS) design to protect components  Establish a backup plan  Test RFQ early 

 All hardware MPS are connected and off-line tested  No beam loss MPS is activated Beam Loss Monitor was only detector for beam loss MPS Threshold determined after accumulating operating experience  In FRIB, we assume MPS with differential beam current measurement (DBCM) from the beginning to shut off the beam for the next pulse  Fast beam inhibit will be commissioned and experimentally verified before increasing beam power MPS for Commissioning M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 8

 It is difficult to predict beam loss quantitatively Reality is always worse than simulation?  Qualitative behavior is reproduced by PIC simulations Beam loss observed at a location where larger beam size is predicted by simulation (but with no beam loss), and beam loss is mitigated by smoothing the envelope  It is often useful to guide the commissioning  Area with room for improvement? Comparison between Simulation and Experiment M. Ikegami, June 2015 ICFA-CSNS workshop - 05, Slide 9