On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

Medium-Voltage Switchgear - Then and Now -
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Distributed Intelligence Provides Self-Healing for the Grid
Managing Director, HVPD Ltd
Presented by Malcolm Seltzer-Grant, HVPD Ltd
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
-Anandatirtha. US water companies are under increasing pressure to improve the management of their ageing assets and optimize operational and capital.
Partial discharge analysis of defective three-phase cables An overview of an ongoing project involving the generation and analysis of PD within distribution.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Frankfurt (Germany), 6-9 June 2011 Gerhard Theil Technical University Vienna Institute of Energy Systems and Electric Drives
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
ea technology Effective Condition Assessment of MV Switchgear
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Frankfurt (Germany), 6-9 June 2011 E. Fred Steennis on behalf of E.Fred Steennis – Netherlands – Session 1 – Paper 0875 THE INTRIGUING BEHAVIOUR OVER TIME.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
The strategy for improved electricity distribution maintenance 9 June 2008.
Frankfurt (Germany), 6-9 June 2011 G. Dondossola, F. Garrone, J. Szanto RSE  Research context  Test bed architecture  Attack model  Attack experiments.
Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER DAVE OPENSHAW London Electricity Group.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Frankfurt (Germany), 6-9 June 2011 Dr David Hughes and Paul Barnfather EA Technology UK David Hughes – UK – Session 6 – Paper 0088 Building Risk Based.
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
Advanced Sensors for the Smartgrid
PQ Monitoring with Smart Meters for Condition Based Maintenance on Distribution Systems Mario TREMBLAY Hydro-Québec – Canada Steve.
POWER HOUSE.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Identifying drivers of expenditure. Reasons for spending money 2 Effective regulation requires an understanding of why a business spends money Many different.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
About Georgia Transmission Corporation (GTC)
Intelligent grid expansion – RheinEnergie AG, Germany
Local Intelligent Circuit Breakers – A New Concept for the Refurbishment of Existing Distribution Network Pavel Novak – Germany – Session 1.
the CERN Electrical network protection system
SMART GRID BASED FAULT IDENTIFICATION SYSTEM
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Battery Monitoring System Market research report categorizes by Component (Hardware, Software), Type (Wired, Wireless), Battery.
Fault Statistics – Quo Vadis Günther Brauner AT
ELECTRICAL POWER-II Electrical engineering sixth semester
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
Neil Davies EA Technology
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Substation Equipment's
Presentation transcript:

On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components – Paper 0980

Contents Factors affecting network reliability The direct cost of failure Condition Assessment of MV Assets Smart Substation Monitoring Conclusions Neil Davies – UK – Session 1: Network Components – Paper 0980

Factors Affecting Network Reliability – Major Causes* Switchgear partial discharge faults Switchgear mechanical faults Other switchgear faults (e.g. lightning, protection) Cable faults Theft Vandalism *Ground Mounted Equipment Neil Davies – UK – Session 1: Network Components – Paper 0980

Factors affecting Network Reliability – Costs* *Ground Mounted Equipment Neil Davies – UK – Session 1: Network Components – Paper 0980

Planned intervention or unplanned remedial action? Neil Davies – UK – Session 1: Network Components – Paper 0980

Condition – the key factor in improving SAIDI and SAIFI Restoration of unexpected failures is more costly and takes longer Effective management of assets requires accurate knowledge of condition Condition links good investment, operation and maintenance of networks Improving network performance can have significant cost benefits Neil Davies – UK – Session 1: Network Components – Paper 0980

Partial Discharge Monitoring UltraTEV Monitor Powerful WEB enabled hub PD monitor Locate Transient Earth Voltage signals to resolution of 30cm Locate ultrasonic activity Locate Cable Discharge activity Correlate discharge with environmental and network conditions Neil Davies – UK – Session 1: Network Components – Paper 0980

Cable PD Monitoring from Substation Determine magnitude and location of discharge Correlate with switchgear discharge signals Map PD signals along length of cable Neil Davies – UK – Session 1: Network Components – Paper 0980

Substation Monitoring Approach The UltraTEV Monitor Hub provides a web based gateway into substation Additional condition and network parameters can be monitored Limited additional cost Improved business case for capital expenditure of condition monitoring Single interface per substation Neil Davies – UK – Session 1: Network Components – Paper 0980

Smart Substation Monitor Partial Discharge - Switchgear Power Quality Environment Circuit Breaker Trip Timing Partial Discharge - Cables Substation Monitor Web Fault Level Protection Battery Condition Security cameras and recording Asset / Circuit Algorithms System Voltage and Current Neil Davies – UK – Session 1: Network Components – Paper 0980

Smarter Networks Need Condition Monitoring Asset Partial Discharge - Switchgear Circuit Breaker Trip Timing Protection Battery Condition Security cameras and recording Partial Discharge - Cables Condition Neil Davies – UK – Session 1: Network Components – Paper 0980

Smarter Networks Need Condition Monitoring Asset Condition System Voltage and Current Power Quality Environment Asset / Circuit Algorithms Fault Level System Condition Neil Davies – UK – Session 1: Network Components – Paper 0980

Smarter Networks Need Condition Monitoring Asset Premature Ageing Condition Asset Capability System Capacity Smart Substation Monitor Performance Risk Headroom Capability System Change System Condition Neil Davies – UK – Session 1: Network Components – Paper 0980 The Smart Grid of tomorrow will be built on the assets of yesterday

The Smart Grid of Tomorrow Will Be Built Upon the Assets of Yesterday Smarter Networks Need Condition Monitoring The Smart Grid of Tomorrow Will Be Built Upon the Assets of Yesterday Neil Davies – UK – Session 1: Network Components – Paper 0980