Make a Great Map of Your Engineering Building Traverse ©Mar. 2008 Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.

Slides:



Advertisements
Similar presentations
Tutorial 3 Refractor assignment, Analysis, Modeling and Statics
Advertisements

Word List A.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Microsoft Excel. Click on “Start,” then “Microsoft Office Excel.”
S2 INVENTOR GAME BOY part one MAIN BODY. S2 INVENTOR Here is what the finished result might look like once put together...
Getting Started With Alice By Ruthie Tucker under the direction of Prof. Susan Rodger Duke University, July
How Tall Are You? Introducing Functions By Jenna Hayes under the direction of Professor Susan Rodger Duke University July 2008 Updates made June 2014 by.
First things first – open SketchUp. You may be asked to choose a ‘Template’ For everyday use, choose the Simple Template – Meters Do not choose the Template.
Click here to enter. Click a menu option to view more details Starters Main Courses Desserts Click on the coffee cup to return when Navigating For Vocabulary.
An Example of Drawing Hard Rock Room and Pillar in MineSight ©2012 Dr. B. C. Paul Note – The screen shots in these slides come from the program MineSight.
Using the Underground Traverse Calculator. Team #1 Begins a Traverse Luke Skywalker and Sandra Bullock begin an underground traverse as Team #1 There.
Roads in MineSight.
Reading Angles with Instruments ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures.
The Pocket Protectors of Algebra
Dealing With Surfaces in MineSight ©2012 Dr. B. C. Paul Note – This presentation contains many screenshots from the program MineSight by Mintec. Credit.
Section 2.3 Gauss-Jordan Method for General Systems of Equations
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
Measuring Distance ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
ScannersScanners How to use them to scan pictures and documents.
Introduction to VBA. This is not Introduction to Excel We’re going to assume you have a basic level of familiarity with Excel If you don’t, or you need.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
SOLIDWORKS: Lesson III – Patterns & Mirrors
GPS Surveying ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides may.
Working with Numbers in Alice - Converting to integers and to strings - Rounding numbers. - Truncating Numbers Samantha Huerta under the direction of Professor.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Using Statistical Interpolation to Build Block Models – Part I (Introduction to MineSight® and importing and creating surfaces) Using MineSight® ©2007.
An Approach to Doing Your Traverse Drawings With MineSight ©2009 Dr. B. C. Paul Note- These slides include screen shots taken from MineSight® by Mintec.
Excel By: Brandon Honza. Step 1 Take the CD on the table and put it into your computer. Open the Disc. Then click and drag the entire Excel folder to.
The Traverse Lab ©2010, adjusted 2011 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures.
Intro to C++. Getting Started with Microsoft Visual Studios Open Microsoft Visual Studios 2010 Click on file Click on New Project Choose Visual C++ on.
CARLSON SOFTWARE CONFERENCE DANIEL V. SYPERSMA VICTOR GRAPHICS.
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
CREATE A NEW PROJECT Click on the NEW icon. Click on OK.
How to Use the Brunton Traverse Calculator. When We Last Left Our Story Harrison Ford and Charley Chaplin had just completed their closed traverse Their.
Obtaining Information From the Geologic Block Model
Click your mouse for next slide Dreamweaver – Setting up your Page The first way to ensure that you have a consistent design is to use table to set up.
The Brunton Compass ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
How to Calculate a Traverse with the Traverse Calculator
Understanding the Drafting Tools
Teams who run this, year E BB T B F TE SS CC Iso Right (start here)
Getting Started With AutoCAD ENGR 2 Week #1 Laboratory.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Processing Lab 3 – Header issues and trace editing Bryce Hutchinson Objectives: Fixing elevation issues Define an LMO function Pick first breaks Kill traces.
NOBELCON Version 4.0 USER MANUAL. Get started Obtain Excel spreadsheet with coordinates. Open spreadsheet in Excel. If there are multiple sets of coordinates.
By Jesus Juarez. Download the software from or your preferred website.
Fun With the MineSight Ramp Editor ©2011 Dr. B. C. Paul Note – These slides involve screenshots from the program MineSight developed by Mintec Inc. Topics.
Part 2A (Today’s Part) Press and hold the small red button to turn receiver on Once the receiver acquires its position, press the page button until the.
Making Python Pretty!. How to Use This Presentation… Download a copy of this presentation to your ‘Computing’ folder. Follow the code examples, and put.
Your First Lab (No its not a variety of Dog) ©Jan 2008 Dr. B. C. Paul The ideas and techniques given in these slides are considered common knowledge to.
Geo 3 ch 5 Collecting Data Edited 10/14/05 1 GPS- Collecting Data Now that you have your data dictionary loaded, let’s configure the unit and take it outside!
Sight Word List.
How To Do NPV’s ©2007 Dr. B. C. Paul Note – The principles covered in these slides were developed by people other than the author, but are generally recognized.
Using Statistical Interpolation to Build Block Models – Part II (Setting up Files and Coding Air Blocks) Using MineSight® ©2007 Dr. B. C. Paul revisions.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
Defining Orebodies ©2012 Dr B. C. Paul Note – These slide contain screen shots from the program MineSight by Mintec. Credit is given to Mintec for the.
Starting Up MineSight for Your Coal Mine Project.
An Introduction to Alice By Jenna Hayes under the direction of Professor Susan Rodger Duke University, June 2009 Updated June 2014 by Ellen Yuan.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
THE “COLLEGES I AM THINKING ABOUT” LIST IN YOUR FAMILY CONNECTIONS ACCOUNT.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
How Tall Are You? Introducing Functions for Alice 3 By Jenna Hayes under the direction of Professor Susan Rodger Duke University July 2008 Updates made.
From AutoCAD to ArcView. From AutoCAD to Arcview Purpose Display a site plan drawn in AutoCad on a view drawn in ArcView Given Campus site plan drawing.
Algebra Geek Patrol The Pocket Protectors of Algebra.
Algebra Geek Patrol The Pocket Protectors of Algebra.
Getting Started With Alice: The Basics. Step 1: Background Open up Alice, and choose a background for your Alice world. Your world is something you can.
An Introduction to Alice (Short Version)
Using Statistical Interpolation to Build Block Models – Part I (Introduction to MineSight® and importing and creating surfaces) Using MineSight® ©2007.
Engineering Surveying
Go to =>
How to Start This PowerPoint® Tutorial
Presentation transcript:

Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and Excel Programs, both of which are created by software companies.

What Are We Going To Do Now that You Have Surveyed Around the Building Exchange notes with other teams –Each team only needs to go part way around the building – together you have a traverse all around the building An Excel Spreadsheet called Traverse Assistant was prepared for this class. You will put your survey data into it and get output suitable for use in – MineSight – a 3D graphics program that will create a visual map of your traverse

Take a Look at Traverse Assistant Traverse assistant Has you follow Several steps in Putting in your data You will enter your Data into yellow Fields Answers or Calculation areas Are in green or red. (Don’t mess with The formulas in these Fields)

Start by Putting in the Location of Your Instrument Station Put in the coordinates And elevation of your First point (the example has the State Plane Coordinates Of your first point by The grate near the Corner of Lincoln and Douglas) {Yes that mean you Will start by entering These very same Coordinates}

Next Enter Your Height of Instrument If you used a tape Measure in tenths of Feet you have your Instrument in decimal Feet – enter it here In this example I Assumed I had Measured my height Of instrument with a Regular tape in feet Inches and fractions of An inch I enter the feet I enter the inches I enter the fraction Of an inch – in this Case 3/16 – which The spreadsheet converted to decimals Note that I can only enter my distance in one type Of unit at a time – if I choose decimal feet it is not feet and inches. Your height of instrument is unique To your survey work.

Finally I Enter My Backsight Azimuth I happen to have my Backsight azimuth in Decimal degrees. (For backsighting the Power plant smoke- Stack the azimuth is degrees) Note I could have had That azimuth in Grads, Mills, or degrees Minutes and seconds. {This backsight azimuth will be the starting backsight Azimuth for everyone on this project}

I Scroll Down to Start Entering Information About My Foresight

I First Enter the Angle to the Right That I Turned from my Backsight In this case I Assumed I had Measured that Angle in Degrees, Minutes And Seconds But it could have Been in Grads or Mills. Note that the Spreadsheet Converts any of The measures to Decimal degrees.

Next You Will Enter the Vertical Angle to Your Foresight Different Instruments Measure vertical Angle differently. Some measure The angle from The horizontal – This is especially True of old Transits Many newer Instruments use A zenith angle Measured down From vertical Note that this spreadsheet Will take either a zenith or An angle from the horizon And will take it in grads, Degrees Minutes Seconds Or Mills.

You May Have Measured Your Distance to the Foresight by Stadia or EDM If you measured by Stadia just enter the Upper, middle, and Lower rod readings (all our rods are in Decimal feet)

If You Measured by EDM Skip Step #6 and move to #7 Enter your EDM Distance which Will already be In decimal feet Then enter the Height of your Reflector – note You can enter In decimal feet of Feet inches and Fractions of Inches depending On what kind of Tape you used. Note that if you have entered something for Stadia you should not also claim to have Done the shot by EDM

Scroll Down Again to Start Reading Your Answers We are going to run Minesight by starting at A known point and then Moving in a specified Direction at a given Direction. Thus we read the output For distance and direction In this example it is feet at an azimuth Of degrees.

Time to Fire Up Minesight!

Pick the Location You Will Have Your Project Files in

If it’s a new project location (most likely is) it will ask about creating a resource folder Say Yes.

Minesight Opens and It Asks for the Coordinate Range for Your Project

Lets Work on a Guess degrees N The Buidling is down in Here to the South and West North 381,288 East 2,570,639 Our survey stations won’t Go much further north And most will be to the south (ie – smaller northing) One of our stations is Over by the Arena a little Further east but most Points are to the west (ie – smaller easting)

More Guessing The building is probably less Than 1000 feet in each direction So our smallest northing is about 380,400 with a max of about 381,400 Our smallest easting is about 2,569,800 with a max of about 2,570,800

Set For Feet and Input My Coordinate Range Click Ok to Move on

I’m So Excited – Its Getting Ready to Go

I’m Going to Set Up a File to Keep My Drawing in Start by Clicking on Un-named to Highlight it.

I’m Going to Create a New Geometry Object

It Wants Me to Give the Object a Name I like Engineering Building on Surface (I could pick Anything) When I’m done Click Ok

Click on My New File to Highlight It I’m getting the File ready for Me to put Stuff in it.

Left Click On My Object to Pop Up A Menu Pick Edit

Note We Get An Open Pretty Yellow Box Ready for Our Stuff!

Turn on the Point Editor

Tell it You Will Create a Polyline

Enter the Coordinates of Your First Point and Click Apply You see the First pretty Dot appear

Next Enter the Distance and Direction to Your First Foresight I used the Distance and Direction from The Spreadsheet I can then click Preview or Apply

And Bully! My First Line Appears I’m now Ready to go Back to the Spreadsheet For my next point

I have two possibilities One possibility is that the foresight I just put in was a sideshot to a building corner –I might have taken several more side shots Another possibility is that I was foresighting the next point I would move my instrument to.

If I Am Doing Sideshots from One Point Obviously I won’t Be changing my Instrument Location Backsight Azimuth or Height of Instrument

I Will Change My Angle Right, My Vertical Angle and My Rod (or EDM) Readings

If I Am Moving My Instrument to the Foresight Point Here are the New coordinates Of the New instrument Station And here is the New backsight Azimuth (Copy them Down to use)