Highlights from this Meeting: –Discussions on CISQ formation and how SysA PTF might contribute to this forum –Discussions related to System Assurance ISO standard ISO/IEC and how updates to the standard reflect our efforts related to SEAM and ARM –SAEM and ARM submitter teams and TF discussed possible merge of 2 specs once they are adopted respectively by AB (forming joint FTF and joining them into one Spec.) –Vote by TF was conducted to postpone SEAM revised submission until Mar to accommodate –Presentations in area of Common Weakness Enumeration (CWE), Common Attack Patterns Enumeration Classifications (CAPEC) and Software Fault Patterns (SFP) CWEs are brought into OMG SwA Ecosystem through SFP to support automation –Update on Software Assurance initiatives in The Open Group by Dr. Ben Calloni TC Meeting Date: Dec , 2009 Reporting Chair: D. Campara and Ben Calloni Group page (URL): Group System Assurance PTF Page #1
Highlights from this Meeting: –Working session on Argumentation Metamodel Review of revised Argumentation Metamodel (ARM) –Working session on SEAM Review of revised spec –Alignment between ARM, SAEM and ISO/IEC TC Meeting Date: Dec , 2009 Reporting Chair: D. Campara and Ben Calloni Group page (URL): Group System Assurance PTF Page #2
Documents delivered this Meeting: –SysA/ Meeting minutes –SysA/ CISQ Overview by Dr. Bill Curtis, CAST –SysA/ ISO/IEC15026 Changes, Dr. Sam Redwine –SysA/ Dependability Case for OS, Dr. Yutaka Matsuno, AIST –SysA/ CWE and CAPEC, Bob Martin, MITRE –SysA/ Software Fault Patterns, Dr. Nikolai Mansourov, KDM Analytics –SysA/ ARM, Dr. Tim Kelly –SysA/ SAEM, Dr. Nikolai Mansourov Next meeting: –Wednesday and Thursday, Mar Jacksonville, FL. TC Meeting Date: Dec , 2009 Reporting Chair: D. Campara and Ben Calloni Group page (URL): Group System Assurance PTF Page #3