AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

Technology Acceptance Model. Copyright 2007 Black & Rossi, LLC All rights reserved 10/15/05 Black & Rossi, LLC, all rights reserved Who we are Technology.
Mafijul Islam, PhD Software Systems, Electrical and Embedded Systems Advanced Technology & Research Research Issues in Computing Systems: An Automotive.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
GENI: Global Environment for Networking Innovations Larry Landweber Senior Advisor NSF:CISE Joint Techs Madison, WI July 17, 2006.
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
MCAS Overview Presentation 99/04/28, Publication Number ESD C ritical A pplication M ission S ervices When strategic business applications…
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Shelf Management & IPMI SRS related activities
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
ICTSUS6233A Integrate sustainability in ICT planning and design projects analyse energy audit data on enterprise resource consumption plan and integrate.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
ESS Controls Infrastructure Timo Korhonen ICS Feb.. 4, 2015.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
VPX Cover Overview and Update “VPX, Open VPX, and VPX REDI ” are trademarks of VITA.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
LAr ROD R&D for sLHC Charlie Armijo, Joel Steinberg, Ken Johns (University of Arizona) Joe Mead, Hucheng Chen, Francesco Lanni (BNL) Luis Hervas (CERN)
National Instrument Opportunities and Challenges Buy-Side Firms Jenny Tsouvalis Vice-President, Investment Operations and Applications, OMERS March.
Operations, Test facilities, CF&S Tom Himel SLAC.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
ΜTCA for physicists? A project of PH-ESE group to evaluate platforms for uTCA based systems at CERN and in the HEP community M. Joos, CERN on behalf of.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
National Instrument Opportunities and Challenges Buy-Side Firms Heidi Johnston Vice-President, Trade Administration & Fund Accounting Phillips,
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
Acquisition system for the CLIC Module. Sébastien Vilalte.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
Future computing strategy Some considerations Ian Bird WLCG Overview Board CERN, 28 th September 2012.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
BPM stripline acquisition in CLEX Sébastien Vilalte.
CLIC Controls – for the CDR Mick Draper Accelerator Control group, CERN.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
CLIC NI Acquisition and Control Module update CLIC Module Working group meeting Adriaan Rijllart EN-ICE-MTA.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 New Standards VLT Control System Mario Kiekebusch (On behalf everyone who took part.
Context of CERN-LAPP collaboration HS,
Standard electronics for CLIC module. Sébastien Vilalte CTC
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Driving Innovation Technology Strategy Board The UK’s agency for business innovation –Business benefit –Economic growth –Quality of life.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Development and Status
CALIFES A proposed electron beam test facility at CERN
Accelerator Controls Renovation Project “ACCOR”
The ILC Control Work Packages
New xTCA Developments at SLAC
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
CLIC-ILC BDS & MDI work.
Photon beamline crates
Sonata Accelerated Upgrade Assessment
Presentation transcript:

AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011

 About 20 years that VMEBus was officially introduced as CO standard platform (PS/SL 1990 Controls renovation)  Over 1000 FECs deployed for operation including 550 PowerPC/LynxOS  From 2007, we faced with VME platform obsolescence in LHC Injectors chain  2009 (ACCOR): Major contract with Industry to use multi-core Intel/Linux (Today: 10%  LS1: 50%)  In view of LHC upgrade phases and next generation accelerators (CLIC), we think it’s time now to provide state-of-art on Front-End architecture and assess new solutions for the future  VME is slightly behind its industrial competitors that are ready with new technologies: Compactness, Performance and High-Availability 12/15/2011AGM What's next in the COFE room?

 Indeed, since 2006 Telecom market made significant investments to define Embedded RT hardware: MicroTCA  AdvancedTCA(ATCA)  MicroTCA (yTCA)  MicroTCA opportunity?  Inherits ATCA capabilities: Bandwith, Performance, Robustness, RAS  Open architecture (PICMG consortium)  Protocol agnostic (PCIe, GbEthernet, RapidIO,..)  Global and Intelligent remote management (IPMI)  Small form factor system  Cost-effective solution  MicroTCA for Physics (xTCA)  High-data transfer rates  Rear Transition Module (extended IPMI)  Backplane timing distribution and signal triggering  Physics community already opted for xTCA architecture (SLAC, DESY,..) 12/15/2011AGM What's next in the COFE room?

 Several years of R&D resulted in the first CLIC Design Conception (CDR1 for Controls)  In particular, CO/FE has to provide Generic read-out system (ACM) for all two-beam modules (TDR 2016)  ACM Design is rather challenging:  Integration and compactness: modules  Radiation hardness: ~1kGy/year (  no CPU, no OS)  Low power consumption: <0.5W/IO ch. (100W/ACM)  Synch. LAN data transfer between ACM and CLIC control system (immune to EMC)  Remote Configuration and Diagnostic facilities  … 12/15/2011AGM What's next in the COFE room?

 BE/CO has been mandated to steer the evaluation and prototyping activities CLIC Control system  2012: Focus on Beam Instrumentation for CTF3 (LAPP)  CLIC is extremely ambitious, but it is just starting … one can bet on Technological advances and Collaboration  BE/CO has direct interest to evaluate new platform for future use (LHC included) and to invest on potential improvement of the CO multi-tier approach 12/15/2011AGM What's next in the COFE room?